Loading...
HomeMy WebLinkAboutConstruction control 42723 RECEIVCD [ APR 27 2023 Final Construction Control Document fBUILDING DEPARTMENT >tN To be submitted at completion of construction by a BY Registered Design Professional • 1H SVe�� for work per the 9th edition of the ` Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Fairview Millwork Storage Building Enclosure Date: April 27, 2023 Permit No. Property Address: 49 White's Path, South Yarmouth,MA Project: Check(x)one or both as applicable: XX New construction XX Existing Construction Project description: Partial Wall Infill for 50'by 140' Existing Pre-Engineered Steel Building I,Robert Desrosiers, MA Registration Number: 36770 ST Expiration date: June 30, 2024,am a registered design professional, and I have reviewed all design and installation plans concerning: XX Architectural XX Structural Mechanical Fire Protection Electrical Other: Describe for the above named project. 1,or my designee,have performed the necessary professional services and was present at the fabrication site on a regular and p:Tiodic basis for Third Party Inspections.To the best of my knowledge,information,and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Have performed the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. 1114 Enter in the space to the right a"wet"or '4�ROBERT M. ve, electronic signature and seal: !r T`+CT RAL -0 '). 6770 �ct- fi`SSiONAl C' OL Z7IZfi Phone number: 508-946-3561 (ASAP Engineering) Email: robdesrosiers.asap@verizon.net Building Official Use Only Building Official Name: P:— :it No.:_ Date: • Version 06 11 2013 RECEIVED A S A D Engineering& ;OBEIZT M. DESROSIEI25, RE. Design Co., Inc. APR 2 7 2023 Consulting Engineer Tel. 508-946-3561 Post Office Box 649 . Middleborough, MA 02346 BUILDING DEPARTMENT April 27, 2023 Project No. 2022-098 Ted Mahoney Fairview Millwork& Kitchens 100 Pearl Street Bridgewater, MA 02324 Re: Construction Control Inspection for Storage Building Modifications at 49 Whites Path, South Yarmouth, MA Mr. Mahoney: • This is written to confirm.that ASAP Engineering has provided Construction Control Services for the referenced prof ct,including,preparation of certified engineered structural plans for the project, review, coordination, and approval of structural steel shop drawings, and visual inspection of the completed work on site on Thursday, April 27, 2023. In my view, the project has been conducted consistent with the design documents prepared by this office and according to good construction practice. The workmanship of the structural steel installation and application of sheet metal was excellent. The completed construction meets the design intent and the structural requirements of the Massachusetts State Building Code, Ninth Edition. If you have any questions regarding this report, or if you require additional information, please do not hesitate to call. Very Truly Yours, ftOei F?T M. c'RO fE; .1). , . Sri/%� Robert M. Desrosiers, P.E., M. ASCE ,. F v <�41-