Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH /9/ SEWAGE PLAN REVIEW CHECKLIST Location: AM `, / LOT/SI6 - Date of Subdivision Approval Street 7 /2 - ,'ail/ Zone of Contribution: In Out Village - ,. Commercial Residential Owner: C /&//c/ - Installer / �gGlfr-- Builder: Engineer 7 '�-v N/A YES NO 1. Required number of copies received. ,./ 2. Date of soils exam and percolation test not older than 2 years. (...----- 3. 4 feet of naturally occurring pervious material, above water table(new construction) 4 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. :/ 6. Benchmark indicated and shown - NGVD if near wetlands. k/ 7. Building sewer does not exit center of house. ✓ 8. Septic tank a minimum of 10 feet from house and deck. 9. Leaching a minimum of 20 feet from house and 10 feet from deck. 10. Leaching a minimum of 100 feet from wetlands. L/ 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. L---- - 13. Uses adjustment for maximum high groundwater. 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. L/ 15. System not in top or subsoil or 5 foot removal. ------- 16. Proposed contours are suitable. . f 17. System meets slope requirements - min. 1/8", 1/4" preferred. , 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper, gas baffle on outlet tee. ,...------ 20. Sewage flow under 10.000 pd for parcel. -/ 21. No garbage disposal. -� 22. System adequately sized for its intended use. L.i 23. Minimum 6" stone or mechanically compacted below the tank and d-box. - 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. 26. Pump system - 2" line. weep hole. check valve, sanitary in d-box, alarm on separate circuit. �..----"_ 27. Septic tank and pump chamber to be Factory waterproofed. \/ 28. Vent provided if leaching below 3 feet or under driveway or parking. 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. `/ ./ 31. H2O loading when system subject to vehicular traffic. 32. Title V application and fee signed by a licensed installer. %._.-- - 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. `� 35. Subdivided prior co April 7. 1989 - Phosphorus Zone 300'. -/- Plan reviewed by: (....0