HomeMy WebLinkAboutPermit plansALL WORK MUST COMPLY WITH STATE AND LOCAL BUILDING CODES AND REGULATIONS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, AND PROCEDURES. THE CONTRACTOR IS RESPONSIBLE FOR ALL ASPECTS OF BUILDING CONSTRUCTION AND MUST PROVIDE ADEQUATE SHORING AND BRACING FOR SAFETY. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING ALL DIMENSIONS AND SITE CONDITIONS. ANY DISCREPANCIES SHOULD BE PROMPTLY COMMUNICATED TO THE OWNER OR DESIGNER BEFORE COMMENCING WORK. IT IS THE CONTRACTOR'S RESPONSIBILITY TO LOCATE AND PROTECT ALL EXISTING UTILITIES FROM DAMAGE. DETAILS, SECTIONS, NOTES, OR REFERENCES TO OTHER DRAWINGS ARE INTENDED TO BE TYPICAL. BEFORE INCORPORATING ANY CHANGES, REVISIONS, MODIFICATIONS, OR DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS, THE CONTRACTOR MUST BRING THEM TO THE ATTENTION OF THE OWNER OR DESIGNER AND OBTAIN APPROVAL FROM THE BUILDING INSPECTOR BEFORE PROCEEDING. SPECIFIC NOTES AND DETAILS ON THE DRAWINGS TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. IN THE ABSENCE OF SPECIFIC DETAILS, CONSTRUCTION SHOULD CONFORM TO SIMILAR WORK ON THE PROJECT. THE GENERAL CONTRACTOR MUST VERIFY ALL DIMENSIONS BEFORE STARTING CONSTRUCTION. THE CONTRACTOR MUST PERFORM ALL WORK IN COMPLIANCE WITH THE FOLLOWING CODES: A) BUILDING: INTERNATIONAL RESIDENTIAL CODE (IRC) 2015 WITH ALL MASSACHUSETTS AMENDMENTS. ANY REFERENCE TO THE INTERNATIONAL RESIDENTIAL CODE IN 780 CMR SHOULD BE CONSIDERED AS A REFERENCE TO 780 CMR 51.00 THROUGH 120.00. B) ARCHITECTURAL ACCESS: MASSACHUSETTS ARCHITECTURAL ACCESS BOARD 521-CMR AND THE AMERICANS WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG) WHERE REQUIRED. C) MECHANICAL: INTERNATIONAL MECHANICAL CODE (IMC) 2015 WITH MASSACHUSETTS MECHANICAL AMENDMENTS IN 780 CMR. D) ELECTRICAL: 527 CMR 12.00 (2015) NATIONAL ELECTRICAL CODE. ANY REFERENCE TO THE INTERNATIONAL ELECTRICAL CODE IN 780 CMR SHOULD BE CONSIDERED AS A REFERENCE TO 527 CMR 12.0: MASSACHUSETTS ELECTRICAL CODE (AMENDMENTS). E) PLUMBING: 248 CMR MASSACHUSETTS PLUMBING REGULATIONS. ANY REFERENCE TO THE INTERNATIONAL PLUMBING CODE IN 780 CMR SHOULD BE CONSIDERED AS A REFERENCE TO 248 CMR, BOARD OF STATE EXAMINERS OF PLUMBERS AND GAS FITTERS. F) FIRE PREVENTION: THIS DESIGN HAVE BEEN DESIGNED IN COMPLIANCE WITH 780 CMR MASSACHUSETTS CODE, NFPA, AND INTERNATIONAL EXISTING BUILDING CODE (IEBC) 2015 WITH 527 CMR REGULATIONS AND AMENDMENTS. THE 2018 IECC (INTERNATIONAL ENERGY CONSERVATION CODE) WITH MASSACHUSETTS AMENDMENTS APPLIES TO ENERGY. GENERAL NOTES ALL STRUCTURAL LUMBER AND THEIR CONNECTIONS SHALL CONFORM TO THE LATEST EDITION OF NFPA NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION AND SUPPLEMENT "DESIGN VALUES FOR WOOD CONSTRUCTION" AS WELL AS THE AMERICAN FOREST AND PAPER ASSOCIATION GUIDE TO WOOD CONSTRUCTION IN HIGH WIND AREAS FOR ONE AND TWO FAMILY DWELLINGS. 1.UNLESS OTHERWISE NOTED ALL SAWN LUMBER FRAMING MEMBERS, JOIST, RAFTERS, STUDS, LINTELS, PLATES, SHALL BE SPRUCE-PINEFIR NO.1 OR BETTER, WITH THE FOLLOWING MINIMUM PROPERTIES: Fb=1250 PSI, Fv= 285PSI E=1,400.00 PSI 2.ALL "MICROLAM" AND "VL" VERSALAM MEMBERS SHALL HAVE THE FOLLOWING MINIMUM PROPERTIES: E =2,000.000 PSI Fb=2,800 PSI Fv=285 PSI 3.ALL "TRUS JOIST TJI" MEMBERS SHALL HAVE THE FOLLOWING MINIMUM PROPERTIES: Fb=2800 PSI Fv=280 PSI E =2,000.000 PSI 4.WOOD SILLS SUPPORTED ON CONCRETE OR CONCRETE MASONRY UNDER ALL INTERIOR OR EXTERIOR WALLS, AND ALL MEMBERS EXPOSED TO WEATHER OR MOISTURE, SHALL BE SOUTHERN PINE NO. 2 OR BETTER, PRESERVATIVE TREATED IN ACCORDANCE WITH THE "AMERICAN WOOD PRESERVERS ASSOCIATIONS STANDARD C1." 5.ALL STRUCTURAL LUMBER SHALL BE STAMPED IN ACCORDANCE WITH THE AMERICAN INSTITUTE OF TIMBER CONSTRUCTION'S "CONSTRUCTION MANUAL". 6.ADDITIONAL FLOOR JOISTS SHALL BE PROVIDED UNDER ALL PARTITIONS OVER 4'-0" LONG WHICH RUN PARALLEL TO THE SPAN OF THE FLOOR. 7.ADDITIONAL FLOOR JOISTS SHALL BE PROVIDED UNDER BATH TUBS. 8. PROVIDE CONTINUOUS 2X SOLID BLOCKING MATCHING THE STUD SIZE, BETWEEN STUDS AT STUD MID- HEIGHT. 9. UNLESS NOTED OTHERWISE, PROVIDE AT MINIMUM DOUBLE STUDS UNDER ALL HEADERS, OR BUILT UP BEAMS. ADDED STUDS AND ALL POSTS SHALL CONTINUE FROM THE POINT OF LOAD APPLICATION TO THE FOUNDATION. 10. ALL POST TO BEAM CONNECTIONS SHALL HAVE METAL POST BASE AND POST CAP. 11. ALL FLUSH FRAMING CONNECTIONS SHALL HAVE BEAM OR JOISTS HANGERS CAPABLE TO SUPPORT THE MEMBER REACTION. 12. ALL METAL CONNECTORS FOR WOOD CONSTRUCTION, JOISTS AND BEAM HANGERS, POST AND COLUMN CAPS AND BASES, BRIDGING, HOLDOWNS, HURRICANE TIES, STRAPPING AND ANY OTHER METAL CONNECTORS, SHALL BE HOT-DIPPED GALVANIZED AS PER MANUFACTURED BY "SIMPSON STRONG-TIE COMPANY" OR EQUAL. ALL METAL CONNECTORS SHALL BE ATTACHED BY THE GENERAL CONTRACTOR AS PER MANUFACTURERS SPECIFICATIONS. NAILS SHALL BE FULLY DRIVEN IN ALL HOLES OF THE HANGERS OR ANCHORS. 13. FRAMING MEMBERS SHALL NOT BE NOTCHED, CUT OR ALTERED WITHOUT IN FIELD THE APPROVAL OF THE ENGINEER. REFER TO TYPICAL DETAILS FOR ALLOWED NOTHING AND HOLES IN 2X WOOD JOISTS. 14. UNLESS OTHERWISE NOTED ON DRAWINGS, ALL STUD WALLS SHALL BE CAPPED WITH DOUBLE TOP PLATES WITH OVERLAPPING CORNERS AND INTERSECTIONS. SPLICE IN TOP PLATES SHALL BE ON TOP OF STUDS AND BE OFFSET MINIMUM 4 FEET. 15. ALL TOP MOUNTED JOIST SHALL HAVE MINIMUM 3 INCH BEARING. 16. ALL EXTERIOR AND INTERIOR WALL SHEATHING SHALL BE 15/32 APA RATED SHEATHING. AT EXTERIOR WALLS USE EXPOSURE 1 PANELS AND USE EXTERIOR GRADE SHEATHING WHEN LONG CONSTRUCTION DELAYS ARE EXPECTED. PROVIDE 2X HORIZONTAL BLOCKING AT LEAST EQUAL THE SIZE OF JOIST, AT ALL UNSUPPORTED PANEL EDGES. SHEATHING SHALL BE PROPERLY FASTENED TO THE WALL STUDS, SOLE PLATES, TOP PLATES AND BLOCKING AS REQUIRED BY CODE, OR SHOWN ON DRAWINGS. PANEL JOINTS SHALL OCCUR OVER STUDS AND BLOCKING. 17.ALL ROOF SHEATHING SHALL BE 5/8" APA RATED SHEATHING EXPOSURE 1, EXCEPT USE EXTERIOR GRADE PANELS WHEN LONG CONSTRUCTION DELAYS ARE EXPECTED. APPLY PANELS WITH LONG DIMENSIONS PERPENDICULAR TO THEIR SUPPORT OVER TWO OR MORE SPANS. UNLESS OTHERWISE SHOWN ON PLANS, SHEATHING SHALL BE NAILED WITH 8D NAILS @ 6 INCHES ON CENTER AT EACH SIDE OF EDGE JOINTS, AND 8D NAILS @12 INCHES ON CENTER AT INTERMEDIATE SUPPORTS. 18.FLOOR SHEATHING SHALL BE 3/4 INCH APA RATED EXPOSURE 1, TONGUE AND GROOVE PLYWOOD PANELS. APPLY PANELS WITH THE LONG DIMENSION PERPENDICULAR TO FLOOR JOISTS, CONTINUOUS OVER TWO OR MORE SPANS. PANELS SHALL HAVE STAGGERED END JOINTS IN EACH SUCCEEDING ROW AND SHALL BE GLUED AND NAILED TO FLOOR JOISTS AS REQUIRED BY CODE AND LEAVING 1/8 INCH SPACE BETWEEN ALL END AND EDGE JOINTS. WOOD 1.THIS STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH: ·INTERNATIONAL RESIDENTIAL CODE (IRC); ·ASCE MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES; ASCE/SEI 7-10; ·AF&PA-AWC NATIONAL DESIGN SPECIFICATIONS (NDS) FOR WOOD CONSTRUCTION; ·STEEL CONSTRUCTION MANUAL, AMERICAN INSTITUTE OF STEEL CONSTRUCTION, INC. AISC 13TH EDITION, 2005.; AND ·APPLICABLE LOCAL REGULATIONS AND ORDINANCES, AND ALL REFERENCED CODES. ROOF: DEAD LOAD: 10.0 PSF GROUND SNOW LOAD (Pg) = 30.0 PSF (Pf) = 25.0 PSF FLOOR: LIVE LOAD = 40 PSF DEAD LOAD = 15 PSF WIND LOAD 140 MHP (CATEGORY II) WIND EXPOSURE B LATERAL LOAD RESISTING SYSTEM ORDINARY MOMENT FRAMES LIGHT GAGE SHEAR WALLS RMF = 3.5 / DAF = 3.0 DESIGN CRITERIA 1. THE FOUNDATION HAS BEEN DESIGNED FOR 2,000 PSF A ALLOWABLE SOIL BEARING CAPACITY. 2. ANY STRUCTURAL FILL OR BACKFILL FOR FOOTINGS, PIERS AND/OR FOUNDATION WALLS SHALL BE PLACED IN UNIFORM HORIZONTAL LIFTS HAVING A MAXIMUM LOOSE THICKNESS OF 9-INCHES AND COMPACTED TO AT LEAST 95% OF MAXIMUM STANDARD DRY DENSITY IN ACCORDANCE WITH ASTM D1557, UNLESS OTHERWISE INDICATED OR SPECIFIED. 3. LOOSE, SOFT, WET, FROZEN, OR OTHERWISE UNSUITABLE SOILS SHOULD EITHER BE RE-COMPACTED OR OVER- EXCAVATED TO A SUITABLE SUBGRADE, AS APPROVED BY THE ON-SITE GEOTECHNICAL ENGINEER. NO FOUNDATIONS SHALL BE PLACED ON TOP OR UNSUITABLE SOILS. 4. VERIFY LOCATIONS AND REQUIREMENTS FOR INSERTS, SLEEVES, CONDUITS, EMBEDMENT AND PENETRATIONS WITH RESPECTIVE TRADES BEFORE PLACING CONCRETE. 5. DOWELS FROM FOUNDATIONS INTO PIERS, COLUMNS, BUTTRESSES OR WALLS SHALL BE THE SAME SIZE AND NUMBER AS REINFORCEMENT IN PIERS, COLUMNS, BUTTRESSES OR WALLS ABOVE, EXCEPT AS OTHERWISE SHOWN. 6. CONTRACTOR SHALL PROVIDE CONTINUOUS DRAINAGE BY MECHANICAL METHODS TO CONTROL SURFACE AND UNDERGROUND WATER, AS REQUIRED DURING CONSTRUCTION. 7. CONTRACTOR SHALL ENSURE THAT GROUND WATER LEVELS UNDER ADJACENT STRUCTURES AND PROPERTIES ARE NOT ALTERED. 8. ALL FOUNDATION UNITS (PIERS) SHALL BE CENTERED SUPPORT MEMBERS, UNLESS OTHERWISE NOTED ON PLANS. 9. ALL BEARING MATERIALS SHALL BE INSPECTED BY THE GEOTECHNICAL ENGINEER PRIOR EXECUTION AS REQUIRED BY CODE. 10. BOTTOM OF ALL EXTERIOR FOOTINGS SHALL BEAR A MINIMUM OF 4'-0" BELOW FINAL FINISHED GRADE FOR FROST PROTECTION. 11. FOUNDATION WALLS THAT RETAIN EARTH SHALL BE BRACED AGAINST BACKFILLING PRESSURES UNTIL FLOOR SLABS AT TOP AND BOTTOM ARE IN PLACE. 12. WHERE FOUNDATION WALLS ARE TO HAVE EARTH PLACED ON EACH SIDE, PLACE FILL SIMULTANEOUSLY SO AS TO MAINTAIN A COMMON ELEVATION ON EACH SIDE OF THE WALL. 13. ALL FOOTING EXCAVATIONS ARE TO BE FINISHED BY HAND. 14. PROTECT IN-PLACE FOUNDATIONS, SLABS AND ADJACENT STRUCTURES, NEW CONSTRUCTION, STREET UTILITIES FROM FROST PENETRATION OR DAMAGE FROM CONSTRUCTION ACTIVITIES UNTIL THE PROJECT IS COMPLETED. 15. SLAB ON GRADE SHALL BEAR DIRECTLY ON A MIN. 12" THICK LAYER OF COMPACTED STRUCTURAL FILL, OR 6" THICK LAYER OF CRUSHED STONE, PLACED ABOVE PROOF-ROLLED UNDISTURBED NATURAL SOIL. IF BEDROCK IS ENCOUNTERED, IT SHOULD BE EXCAVATED A MIN. OF 12" BELOW THE BOTTOM OF PROPOSED FOOTING. LOOSE ROCK PIECES SHOULD BE REMOVED WITHIN THE FOOTING BEARING ZONE, AND OPEN BEDROCK JOINTS SHOULD BE CHOKED WITH CRUSHED STONE OR FILLED WITH CONCRETE PRIOR TO PLACING THE SOIL CUSHION. FOUNDATIONS • • 1. ALL CONCRETE WORK SHALL CONFORM TO THE LATEST EDITIONS OF THE ACI BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE (ACI 318); DETAILS AND DETAILING OF CONCRETE REINFORCEMENT (ACI-315); GUIDE TO CONCRETE FLOOR AND SLAB CONSTRUCTION (ACI-302); STANDARD SPECIFICATION FOR DEFORMED AND PLAIN CARBON STEEL BARS FOR CONCRETE REINFORCEMENT (ASTM A615); AND APPLICABLE LOCAL CODE. 2. ALL CONCRETE SHALL BE CONTROLLED CONCRETE, MIXED AND PLACED UNDER THE SUPERVISION OF AN APPROVED CONCRETE TESTING AGENCY. CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR DESIGN OF CONCRETE MIXES AND FOR MAINTAINING STRENGTH AND PROPER SLUMP DURING CONSTRUCTION. 3. CONCRETE SHALL BE NORMAL WEIGHT CONCRETE WITH FINE AND COARSE AGGREGATE, TYPE I OR II PORTLAND CEMENT AND WITH A MINIMUM 28-DAYS STRENGTH OF 4,000 PSI. 4. ALL CONCRETE EXPOSED TO THE WEATHER OR POSSIBLE FREEZE/THAW ACTION SHALL CONTAIN AIR-ENTRAINING ADMIXTURE WITH 6% (±1%) AT POINT OF DELIVERY. 5. CONCRETE MAY CONTAIN A WATER REDUCING, PLASTICIZING OR ANY APPROVED ADMIXTURE. THE MAXIMUM WATER-CEMENT RATIO OF ALL CONCRETE SHALL BE 0.5 (U.N.O.). 6. NO CALCIUM CHLORIDE SHALL BE USED IN ANY CONCRETE. 7. CONCRETE COVER PROTECTION FOR REINFORCEMENT SHALL BE AT LEAST: 3" WHEN CAST AGAINST OR PERMANENT EXPOSED TO EARTH 2" CONCRETE EXPOSED TO WEATHER 8. ALL CONCRETE FOOTINGS AND WALL SECTIONS SHALL BE PLACED WITHOUT HORIZONTAL CONSTRUCTION JOINTS. HORIZONTAL WALL REINFORCEMENT SHALL BE CONTINUOUS THROUGH VERTICAL CONSTRUCTION JOINTS. WIRE BRUSH AND CLEAN CONSTRUCTION JOINTS PRIOR TO POURING NEW CONCRETE. 9. NO BARS SHALL BE CUT OR OMITTED IN THE FIELD BECAUSE OF SLEEVES, DUCT OPENINGS OR RECESSES. BARS MAY BE ADJUSTED WITHOUT CHANGE IN LEVEL. 10. NO CHASES, RECESSES, OPENINGS OR SLEEVES SHALL BE INSTALLED IN CONCRETE WITHOUT APPROVAL OF THE DESIGN ENGINEER. 11. KEYS SHALL BE A MINIMUM OF 2"x4" BEVELED SIDES. 12. CHAMFER EXPOSED EDGES 3/4 INCH UNLESS OTHERWISE NOTED. 13. DETAILS NOT SHOWN SHALL BE IN ACCORDANCE WITH THE ACI DETAILING MANUAL. ALL FORMWORK SHALL BE CONSTRUCTED SO CONCRETE MEMBERS AND STRUCTURES ARE OF SIZE, SHAPE, ALIGNMENT, ELEVATION, AND POSITION INDICATED WITHIN TOLERANCE LIMITS OF ACI 117. 14. REINFORCING BAR SHALL CONFORM TO ASTM A615 GRADE 60 UNLESS OTHERWISE INDICATED ON THIS DRAWINGS. 15. WELDED WIRE FABRIC (WWF) SHALL CONFORM TO ASTM A1064 WITH A MINIMUM ULTIMATE TENSILE STRENGTH OF 10,000-PSI. 16. ALL REINFORCING SPLICES SHALL BE CLASS C TENSION SPLICES IN ACCORDANCE WITH ACI 318, UNLESS OTHERWISE NOTED. 17. WHERE REQUIRED, PROVIDE DOWELS TO MATCH SIZE AND SPACING OF MAIN REINFORCING. 18. REINFORCING SHALL BE CONTINUOUS THROUGH ALL CONSTRUCTION JOINTS. THE CONTRACTOR SHALL LOCATE CONSTRUCTION JOINTS AT POINTS OF MINIMUN SHEAR. CAST-IN-PLACE (CIP) CONCRETE FRAMING: REFER TO THE ROOF FRAMING PLANS FOR SPECIFIC DETAILS. TIES: ENSURE HURRICANE TIES ARE INSTALLED ON EACH TRUSS AND RAFTER WITH A MINIMUM UPLIFT CAPACITY OF 365 POUNDS (E.G., SIMPSON'S 18 GA. H2.5 HURRICANE TIES OR EQUIVALENT). SHEATHING: USE "EXTERIOR GRADE PLYWOOD SHEATHING" AND NAIL IT ACCORDING TO TABLE R602.3(1) FASTENER SCHEDULE FOR STRUCTURAL MEMBERS. ALONG GABLE ENDS, NAIL THE EDGES AT 6" INTERVALS ON CENTER. ALTERNATIVELY, YOU MAY USE ZIP ROOF SHEATHING WITH A JOINT TAPE SYSTEM. ROOF SHINGLES: UTILIZE LIFETIME "ARCHITECTURAL" ASPHALT SHINGLES OR 3-TAB SHINGLES WITH 30# FELT PAPER AS AN UNDERLAYMENT. CONFIRM THAT THE SHINGLE COLOR MATCHES THE EXISTING ROOF, AND CHECK THE MANUFACTURER'S WARRANTY. ICE & WATER SHIELD: APPLY ICE AND WATER SHIELD IN VALLEYS AND OVER THE LOWER 3 FEET OF ROOF EDGES FOR SLOPES WITH A PITCH LESS THAN 4 IN 12. ALSO, EXTEND IT A MINIMUM OF 12 INCHES UP THE FACE OF THE CHEEK WALL. TRIM: MATCH THE EXISTING TRIM AND VERIFY THE SELECTION WITH THE OWNER. SOFFITS AND PORCH CEILING: USE COMPOSITE TRIM BOARDS, PANELS, OR BEADBOARD BASED ON THE OWNER'S PREFERENCE FOR BOTH SOFFITS AND THE PORCH CEILING. INSULATION: INSULATE THE ROOF WITH CLOSED-CELL SPRAY FOAM INSULATION TO ACHIEVE A MINIMUM R-VALUE OF 49. FINISH: INSTALL 1X3 STRAPPING AT 16" INTERVALS, PLACE A 4- MILL POLY VAPOR BARRIER, AND APPLY "BLUEBOARD & VENEER PLASTER." PREP AND PRIME THE SURFACE BEFORE APPLYING TWO FINISH COATS OF PAINT. COLORS SHOULD BE SELECTED BY THE OWNER ROOF CONSTRUCTION INSTALL JOISTS AS NOTED ON FRAMING/STRUCTURAL PLANS. GALVANIZED JOIST AND BEAM HANGERS FOR FLUSH FRAMING. BRIDGING OR SOLID BLOCKING ROWS BETWEEN JOISTS EVERY 6 FT.(MAXIMUM). (REFER TO TABLE R602,3(1) FASTENER SCHEDULE FOR STRUCTURAL MEMBERS). HANGERS DESIGNED BY OTHERS. 3/4" T&G CDX PLYWOOD OR "ADVANTEK" DECKING GLUED AND NAILED TO FRAMING. USE 1/2" UNDERLAYMENT BOARD UNDER THIN-SET TILE AND VCT. GLUE AND NAIL UNDERLAYMENT TO SUBFLOOR; FLOORS ABOVE UNCONDITIONED SPACE TO BE INSULATED TO MIN R-30 USING CLOSED CELL SPRAY FOAM OR PER HERS RATER SPECIFICATIONS. FINISHES AS PER PLAN OR OWNER'S SELECTION. FLOOR CONSTRUCTION FOR SYSTEMS CONTAINING 12 OR FEWER UNITS, THE SMOKE, HEAT, AND CARBON MONOXIDE DETECTION SYSTEM MUST BE HARDWIRED AND INTERCONNECTED WITH BATTERY BACKUP. SYSTEMS WITH MORE THAN 13 UNITS SHOULD BE INTERCONNECTED LOW-VOLTAGE SETUPS WITH BATTERY BACKUP. SMOKE ALARMS MUST BE OF THE PHOTOELECTRIC TYPE AND ARE REQUIRED AS FOLLOWS: ONE SMOKE ALARM ON EVERY HABITABLE LEVEL OF THE RESIDENCE. ONE SMOKE ALARM AT THE BASE OF EACH STAIRWAY. ONE SMOKE ALARM OUTSIDE OF EACH SEPARATE SLEEPING AREA. ONE SMOKE ALARM INSIDE EVERY SLEEPING AREA. INSTALL A MINIMUM OF ONE SMOKE ALARM FOR EVERY 1,200 SQUARE FEET OF LIVING SPACE PER LEVEL. CARBON MONOXIDE ALARMS ARE REQUIRED AS FOLLOWS: INSTALL ON EVERY LEVEL OF THE RESIDENCE, INCLUDING BASEMENTS AND HABITABLE PORTIONS OF ATTICS. LOCATE THEM WITHIN 10 FEET OF EACH BEDROOM DOOR. PLACE THEM WITHIN 10 FEET OF ALL FOSSIL FUEL BURNING EQUIPMENT (GAS WATER HEATERS, OIL OR GAS FURNACES, WOOD OR GAS FIREPLACES, WOOD PELLET STOVES, GAS CLOTHES DRYERS, OR GAS COOKING STOVES). COMBINATION SMOKE/CO ALARMS ARE ALLOWED WHEN LISTED ACCORDINGLY WITH NFPA 270. HEAT ALARMS MUST BE POSITIONED IN EACH BAY OF GARAGES AND OTHER AREAS WITH HIGH LEVELS OF FUMES, SMOKE, OR DUST. MOUNT HEAT ALARMS AS CLOSE TO THE CENTER OF THE CEILING AS POSSIBLE. IF NOT PRACTICAL, PLACE THEM NO CLOSER THAN 4 INCHES FROM A WALL OR CORNER. SMOKE, HEAT & CO2 DETECTORS INSTALLATION GUIDELINES Engineering Design +1 (978) 870-6327 | info@buildoneeng.com DRAWN BY CHECKED BY DATE SHEET SHEET Nº No.REVISION DATE FHFS PROJECT NAME: DRAWING TITLE: 36 Constance Ave WEST YARMOUTH - MA PERMIT SET GENERAL NOTES S-001 MAY 14 2024 1 OF 9 SHEET LIST NO.SHEET NAME 1 OF 9 S-001 GENERAL NOTES 2 OF 9 EX-100 EXISTING BASEMENT AND FIRST FLOOR 3 OF 9 EX-101 EXISTING ROOF, 3D VIEW 4 OF 9 A-100 PROPOSED FIRST FLOOR PLAN VIEW 5 OF 9 A-200 PROPOSED ROOF PLAN VIEW 6 OF 9 A-300 SECTION AND ELEVATIONS 7 OF 9 S-100 FOUNDATION AND FIRST FLOOR FRAME PLAN VIEW, TYP. DETAILS 8 OF 9 S-200 CEILING AND ROOF FRAME PLAN VIEW, TYP. DETAILS 9 OF 9 S-300 NOTES AND TYP. DETAILS    36' - 4"24' - 2"4' - 0"21' - 11"14' - 5" 36' - 4"28' - 2"                        7"8' - 6"5"13' - 2"7"9' - 9"5"5' - 2"7"6' - 0"7"5' - 5"7" 23' - 3"15' - 3"7' - 2"6' - 0" 51' - 8" 7"14' - 7"7"17' - 2"5"7' - 4"5"10' - 1"7"7"11' - 8"7"21' - 2"7"34' - 7"7"14' - 7"7"18' - 2"5"2' - 10"7"13' - 5"7" 15' - 2"21' - 11"14' - 7" 51' - 8"7"13' - 8"5"1' - 8"5"11' - 1"7"5' - 0"7"28' - 4"5' - 7"33' - 11"        EXISTING DECK THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. KEY NOTES NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. Engineering Design +1 (978) 870-6327 | info@buildoneeng.com DRAWN BY CHECKED BY DATE SHEET SHEET Nº No.REVISION DATE FHFS PROJECT NAME: DRAWING TITLE: 36 Constance Ave WEST YARMOUTH - MA PERMIT SET EXISTING BASEMENT AND FIRST FLOOR EX-100 MAY 14 2024 2 OF 9 SCALE: 1/4" = 1'-0"  SCALE: 1/4" = 1'-0"  15' - 7"7' - 8"14' - 0"8' - 5"6' - 0" 23' - 3"28' - 5" 51' - 8"12' - 3"11' - 2"11' - 2"22' - 4"12' - 3"34' - 7"15' - 2"36' - 6" 51' - 8"14' - 2"14' - 2"5' - 11"6' - 4"12' - 3"28' - 4"40' - 7"0' - 4" / 1' - 0"0' - 7" / 1' - 0"0' - 6" / 1' - 0"0' - 6" / 1' - 0"0' - 3" / 1' - 0"0' - 6" / 1' - 0"0' - 6" / 1' - 0"THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. KEY NOTES NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. Engineering Design +1 (978) 870-6327 | info@buildoneeng.com DRAWN BY CHECKED BY DATE SHEET SHEET Nº No.REVISION DATE FHFS PROJECT NAME: DRAWING TITLE: 36 Constance Ave WEST YARMOUTH - MA PERMIT SET EXISTING ROOF, 3D VIEW EX-101 MAY 14 2024 3 OF 9 SCALE: 1/4" = 1'-0"   Washer Dryer 34' - 7"15' - 2"21' - 11"14' - 7" 51' - 8"        7"8' - 7"5"8' - 2"5"6' - 0"7"8' - 6"5"13' - 2"7"15' - 3"7"12' - 0"7"7"13' - 8"5"1' - 8"5"11' - 1"7"3' - 0"5"20' - 2"7"28' - 4"24' - 1"3' - 0"3' - 6"7"23' - 6"                      1 6 OF 9 1 6 OF 9 7"14' - 7"7"17' - 2"5"7' - 4"5"10' - 1"7"7"11' - 8"7"21' - 2"7"34' - 7"7"14' - 7"7"18' - 2"5"2' - 10"7"13' - 5"7" 15' - 2"21' - 11"14' - 7" 51' - 8" 23' - 3"15' - 3"13' - 2" 51' - 8" W1D3 W1 W2 D1D4 3' - 6"2' - 3"3' - 3"6"3' - 0" 3' - 6"  W1 SD CO 6' - 10" 3' - 0" EXISTING DECK THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. KEY NOTES NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. COMBINATION PHOTOELECTRIC SENSITIVE SMOKE/CARBON MONOXIDE DETECTORS [R315.4 PG. 68 AMENDED] • MAY BE USED WHERE SMOKE DETECTORS ARE LOCATED PER R315,3 LIFE SAFETY FIXTURES SD CO PHOTOELECTRIC SENSITIVE SMOKE DETECTORS [R314 PG. 67 AMENDED] • 1 IN EACH SEPARATE BEDROOM • 1 OUTSIDE EACH SEPARATE BEDROOM • 1 NEAR BASE OF EACH STAIRWAY • 1 IN EVERY BASEMENT & WALK UP ATTIC • 1 FOR EVERY 1,000 SQ. FT. SD NOTE: ALL SMOKE AND CARBON-MONOXIDE DETECTORS MUST BE HARD-WIRED. CARBON MONOXIDE DETECTOR [R315 PG. 68 AMENDED] • 1 IN EACH HABITAL STORY OF THE HOUSE AND WITHIN 10 FT. OF ALL BEDROOMS. SD HEAT DETECTORS • 1 IN EACH ATTACHED GARAGE, NEAR CENTER. SD C H BATH / LIGHT COMBO - EXHAUST FAN Engineering Design +1 (978) 870-6327 | info@buildoneeng.com DRAWN BY CHECKED BY DATE SHEET SHEET Nº No.REVISION DATE FHFS PROJECT NAME: DRAWING TITLE: 36 Constance Ave WEST YARMOUTH - MA PERMIT SET PROPOSED FIRST FLOOR PLAN VIEW A-100 MAY 14 2024 4 OF 9 SCALE: 1/4" = 1'-0"  WINDOW / OPENING SCHEDULE Level Mark SIZE SILL HEIGHT Qty.WIDTH HEIGHT FIRST FLOOR W1 2' - 10"4' - 9"1' - 11 1/2"3 FIRST FLOOR W2 2' - 7 1/2"3' - 0"3' - 8"1 DOOR SCHEDULE Level Mark SIZE QtyWIDTHHEIGH FIRST FLOOR D1 3' - 0"6' - 8"1 FIRST FLOOR D3 5' - 0"6' - 8"1 FIRST FLOOR D4 2' - 6"6' - 8"1 FIRST FLOOR D5 2' - 6"6' - 8"1 NOTE: NON-MARKED WINDOWS AND DOORS ARE EXISTING OPENINGS THAT WILL REMAIN THE SAME.  THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. KEY NOTES NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. 1 6 OF 9 1 6 OF 9 15' - 7"7' - 8" 23' - 3"14' - 7"13' - 10"8" 51' - 8"8"12' - 3"11' - 2"11' - 2"34' - 7"15' - 2"36' - 6" 51' - 8"14' - 2"14' - 2"24' - 5"28' - 4"52' - 8"0' - 4" / 1' - 0"0' - 7" / 1' - 0"0' - 6" / 1' - 0"0' - 6" / 1' - 0"0' - 6" / 1' - 0"0' - 6" / 1' - 0"0' - 7" / 1' - 0"0' - 7" / 1' - 0" Engineering Design +1 (978) 870-6327 | info@buildoneeng.com DRAWN BY CHECKED BY DATE SHEET SHEET Nº No.REVISION DATE FHFS PROJECT NAME: DRAWING TITLE: 36 Constance Ave WEST YARMOUTH - MA PERMIT SET PROPOSED ROOF PLAN VIEW A-200 MAY 14 2024 5 OF 9 SCALE: 1/4" = 1'-0"  THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. KEY NOTES NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. BASEMENT LEVEL E.L. -8' - 3" FIRST FLOOR E.L. 0' - 0" CEILING E.L. 8' - 3" BASEMENT LEVEL E.L. -8' - 3" FIRST FLOOR E.L. 0' - 0" CEILING E.L. 8' - 3" BASEMENT LEVEL E.L. -8' - 3" FIRST FLOOR E.L. 0' - 0" CEILING E.L. 8' - 3" BASEMENT LEVEL E.L. -8' - 3" FIRST FLOOR E.L. 0' - 0" CEILING E.L. 8' - 3" BASEMENT LEVEL E.L. -8' - 3" FIRST FLOOR E.L. 0' - 0" CEILING E.L. 8' - 3" Engineering Design +1 (978) 870-6327 | info@buildoneeng.com DRAWN BY CHECKED BY DATE SHEET SHEET Nº No.REVISION DATE FHFS PROJECT NAME: DRAWING TITLE: 36 Constance Ave WEST YARMOUTH - MA PERMIT SET SECTION AND ELEVATIONS A-300 MAY 14 2024 6 OF 9 SCALE: 1/4" = 1'-0"  SCALE: 3/16" = 1'-0"  SCALE: 3/16" = 1'-0"  SCALE: 3/16" = 1'-0"  SCALE: 3/16" = 1'-0"   4'-0"MIN. EMBEDMENTSIMPSON POST BASE OR SIMILAR FINISHED GRADE FOUNDATION SOIL 12"∅ SONOTUBE CONCRETE FORM OR SIMILAR JOIST DECK SHEATHING SIMPSON HANGER OR SIMILAR EACH JOIST BEAM SIMPSON POST CAP OR SIMILAR COLUMN TUBEBASE CONCRETE FORM OR SIMILAR AS REQ'D4' - 0"MIN. EMBEDMENTAS REQ'D9'-0" MAX.SIMPSON POST BASE OR SIMILAR FINISHED GRADE FOUNDATION SOIL 12"∅ SONOTUBE CONCRETE FORM OR SIMILAR JOIST FLOOR SHEATHING SIMPSON HANGER OR SIMILAR EACH JOIST BEAM SIMPSON POST CAP OR SIMILAR COLUMN THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. KEY NOTES NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY.3' - 4"9' - 0"14' - 11"9' - 0"9' - 0"5' - 11"6' - 3"6' - 3" 3" EXISTING FOUNDATION WALL EXISTING FOUNDATION WALL EXISTING FOUNDATION WALL EXISTING BASEMENT3' - 0"5' - 10"3' - 4" 12' - 7" CONCRETE FIRST STEP CONCRETE FIRST STEP 6x6 P.T. POST PIER FOUNDATION 6x6 P.T. POST PIER FOUNDATION - 20"Ø BASE 6x6 P.T. POST PIER FOUNDATION 6x6 P.T. POST PIER FOUNDATION - 20"Ø BASE 6x6 P.T. POST PIER FOUNDATION 6x6 P.T. POST PIER FOUNDATION 6x6 P.T. POST PIER FOUNDATION - 20"Ø BASE 5' - 7"6"8' - 6"6"8' - 6"6"(2x) 1 3/4" x 9 1/2" 2.0E Microllam® LVLFLOOR JOIST @16" O.C.2x10 SPF No.1/No.26"8' - 6"6"8' - 4"(2x) 1 3/4" x 9 1/2" 2.0E Microllam® LVL6' - 7"24' - 0"13' - 2"24' - 0"EXISTING FLOOR TO REMAIN EXISTING FLOOR TO REMAIN EXISTING FLOOR TO REMAIN 3' - 6"5' - 6"3' - 6" FIRST STEP: CONCRETEDECK JOIST @16" O.C.2x8 P.T.(2x) 2x8 P.T.6' - 10"6' - 4" DECK JOIST @16" O.C. 2x8 P.T. (2x) 2x8 P.T.3' - 0"3' - 6"Engineering Design +1 (978) 870-6327 | info@buildoneeng.com DRAWN BY CHECKED BY DATE SHEET SHEET Nº No.REVISION DATE FHFS PROJECT NAME: DRAWING TITLE: 36 Constance Ave WEST YARMOUTH - MA PERMIT SET FOUNDATION AND FIRST FLOOR FRAME PLAN VIEW, TYP. DETAILS S-100 MAY 14 2024 7 OF 9 SCALE: 1/4" = 1'-0"  SCALE: 1/4" = 1'-0"   SCALE: 12" = 1'-0"  RIDGE BOARD RAFTER TOENAIL WITH FOUR 16D (0.131" X 31/4") NAILS EACH SIDE, OR FOUR 16D (0.131" X 31/4") NAILS THROUGH RIDGE INTO RAFTER RIDGE CONNECTION RAFTER PITCH 10:12 to 11:1212:124:12 to 9:12 Ridge Board Sizes 2x8 2x10 16"14" 2x6 2x8 2x10 2x12 RAFTER SIZE MINIMUM RIDGE BOARD DEPTH HEEL CONNECTION (PLATFORM) RAFTER SHEATHING OR OTHER LATERAL BRACING AS REQUIRED CEILING JOIST ATTACH PLATE TO RIM WITH 16D (0.131" X 31/4") NAILS AT 12" ON-CENTER2X PLATE (CONNECTION DESIGN MAY BE REQUIRED, CONTACT YOUR WEYERHAEUSER REPRESENTATIVE) ATTACH BLOCKING TO RAFTER WITH TWO 16D (0.131" X 31/4") NAILS 3" MAXIMUM RAFTER SEAT CUT OVERHANG A23 OR SIMILAR CLIPS EACH SIDE. (ADDRESSES LATERAL LOAD ONLY, NOT INTENDED FOR WIND UPLIFT.) * LATERAL BLOCKING PER CODE OR FOR LATERAL WIND REQUIREMENTS HANGER TYPE SIMPSON STRONG TIE® ClipNailing A23 Top PlateRafter/Ceiling Joist 10d x 11/2"10d x 11/2" * ANGLE CLIPS 14" 2x12 2x10 14" 16" 2x12 2x10 14" THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. KEY NOTES NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY.CEILING JOIST @16" O.C.2x6 SPF No.1/No.224' - 1"13' - 2" EXISTING CEILING TO REMAIN 0' - 4" / 1' - 0"0' - 7" / 1' - 0"0' - 6" / 1' - 0"0' - 6" / 1' - 0"0' - 6" / 1' - 0"0' - 6" / 1' - 0"8' - 4"24' - 1"24' - 1"8' - 4"6' - 7"6' - 7" 13' - 2" EXISTING ROOF EXISTING ROOF EXISTING ROOF EXISTING ROOF ROOF RAFTER @16" O.C.2x6 SPF No.1/No.2ROOF RAFTER @16" O.C.2x6 SPF No.1/No.22x10 SPF No.1/No.22x10 SPF No.1/No.22x10 SPF No.1/No.22 x 1 0 S P F N o . 1 /N o . 2 Engineering Design +1 (978) 870-6327 | info@buildoneeng.com DRAWN BY CHECKED BY DATE SHEET SHEET Nº No.REVISION DATE FHFS PROJECT NAME: DRAWING TITLE: 36 Constance Ave WEST YARMOUTH - MA PERMIT SET CEILING AND ROOF FRAME PLAN VIEW, TYP. DETAILS S-200 MAY 14 2024 8 OF 9 SCALE: 1/4" = 1'-0"  SCALE: 1/4" = 1'-0"  SCALE: 12" = 1'-0"  PSPN516ZMSTC NS1 RPS28Z PSPN58Z NS2 NS2SS1.5 NS1 HSS2- SDS1.5 PSPN516Z ELECTRICAL WIRING HSS2-3-SDS3 LOAD BEARING WALL (WITH HVAC CHASE) RPS28 CTS218 1 4 4 3 2 4 6 4 5 2 7 8 1 HVAC CHASE (2) ADJACENT STUD BAYS 3-16d FASTENERS EVERY 16" 9 SUPPLY LINES WATER OR VENT PIPE TO 2ND FLOOR HEADER SCHEDULE AT INTERIOR BEARING WALLSHEADER SCHEDULE AT INTERIOR BEARING WALLS SPAN SUPPORTING ROOF SUPPORTING ROOF + 1 FLOOR HEADER JACK JAMB HEADER JACK JAMB 0'-0" TO 3'-0"3-2x8 1-2x6 1-2x6 5 1/4" x 7 1/4" LVL 1-2x6 1-2x6 3'-0" TO 6'-0"5 1/4" x 7 1/4" LVL 1-2x6 1-2x6 5 1/4" x 9 1/2" LVL 4x6 1-2x6 HEADER SCHEDULE AT EXTERIOR BEARING WALLSHEADER SCHEDULE AT EXTERIOR BEARING WALLS SPAN SUPPORTING ROOF SUPPORTING ROOF + 1 FLOOR HEADER JACK JAMB HEADER JACK JAMB 0'-0" TO 3'-0"3-2X8 1-2x6 1-2x6 3-2x8 2-2x6 1-2x6 3'-0" TO 6'-0"3-2x10 2-2x6 1-2x6 3-2x12 OR 3-1 1/4"x5 1/2" LVL 2-2x6 2-2x6 6'-0" TO 8'-0"3 -13/4" x 7 1/4" LVL 2-2x6 1-2x6 3 1/2" x 7 1/4" LVL 2-2x6 1-2x6 8'-0" TO 10'-0"3-1 3/4" x 9 1/2" LVL 2-2x6 1-2x6 3-1 3/4" x 9 1/2" LVL 2-2x6 2-2x6 NOTE: HEADER SIZES SHOWN AT FLOOR LEVELS ASSUME OPENING ABOVE IS ALIGNED OVER AND EQUAL TO OR LARGER THAN THE OPENING IN QUESTION, OTHERWISE THE SIZES MUST BE INCREASED. 4'-0" MIN. STUD SPLICE 15"16" TYP.15"16"TYP.1 1 HEADERHANGER HANGER SISTER JOIST (FULL LENGTH) WOOD JOIST SHEATHING SHEATHINGNOTES: 1.CONNECT SISTER TO ADJOINING JOIST WITH 2-ROWS OF 16d RING-SHANK NAILS AT 16" ON CENTER, FULL LENGTH. 2.CONNECT ENDS OF SISTER JOISTS TO SUPPORT TO MATCH ADJOINING JOISTS. 3.HEADER DEPTH AND NUMBER SHALL MATCH ADJOINING FRAMING. HEADERCRIPPLE STUDS DOUBLE 2x TOP PLATE 2x BLOCKING AT PLYWOOD EDGES JACK STUDS TYPICAL WALL STUDS JAMB STUDS P.T.1-2x SOLE PLATE NOTES: 1.REFER TO HEADER SCHEDULE FOR HEADER, JACK AND JAMB SIZES. 2.REFER TO ARCHITECTURE DRAWINGS FOR SIZE AND LOCATION OF OPENINGS. 3.FOR ANCHOR BOLT SIZE AND SPACING REFER TO NOTES AND SECTIONS. HEADERCRIPPLE STUDS DOUBLE 2x TOP PLATE 2x BLOCKING AT PLYWOOD EDGES JACK STUDS TYPICAL WALL STUDS JAMB STUDS P.T.1-2x SOLE PLATE NOTES: 1.FOR HEADER, JACK AND JAMB SIZE AND NUMBER REFER TO HEADER SCHEDULE. FOR # OF STUDS REFER TO PLAN AND/OR SECTIONS, TYP. SIMPSON HOLD DOWN OR SIMILAR 1/2" ANCHOR BOLT EMBEDDED IN CONCRETE MIN. 7" EACH COLUMN PLYWOOD SHEATHING REFER TO HEADER SCHEDULE FOR SIZE 2x6 STUD WALL 2x6 PLATE 1/2" PLYWOOD SPACERS 2x6 PLATE DOUBLE 2X TOP PLATE MINIMUM AT ALL WALLS STUD WALL, FOR SIZE AND SPACING REFER TO PLANS LAP TOP PLATE AT ALL CORNERS AND INTERSECTIONS 3 STUD MIN. AT ALL CORNERS WOOD FRAMING FOR DOOR OPENINGSFRAMING AROUND OPENINGSWOOD FRAMING FOR WINDOW OPENINGS HOLD DOWN AT SHEAR WALLCORNER STUD LAYOUT AND TOP PLATE SPLICE HEADER DETAIL FACE MOUNT HANGER TOP MOUNT HANGERPROTECT UNTREATED WOOD FROM DIRECT CONTACT WITH CONCRETE BEARING FOR DOOR OR WINDOW HEADER STRAP PER CODE IF TOP PLATE IS NOT CONTINUOUS OVER HEADER BEAM TO BEAM CONNECTION BEARING AT CONCRETE WALL COLUMN BEARING AT WALL 11/8" TJ® RIM BOARD OR11/4" R 11/2" TIMBERSTRAND® LSLOR BLOCKING FOR LATERAL SUPPORT STRAP PER CODE IF TOP PLATE IS NOT CONTINUOUS OVER COLUMN 3" MIN. WOOD BEAM WOOD COLUMN CONCRETE SIMPSON CBS POST BASE OR SIMILAR SIMPSON CC POST CAP OR SIMILAR WOOD COLUMN34" - 38"FROM STEP NOSING6FT MAXIMUM SPACING OPENING SHALL NOT PERMIT THE PASSAGE OF A 6" Ø SPHERE 34" - 38"TO STAIR NOSINGCORROSION-RESISTANT HANDRAIL HARDWARE 1 1/2" min. 1 1/2" min.13/4" min.13/4" min.1 1/2" min. MOUNTED TO POST MOUNTED TO WALL TYPE 1 - R311.7.8.5(1) PERIMETER: 4" - 6 1/4" TYPE 2 - R311.7.8.5(2) PERIMETER: > 6 1/4" NONCIRCULAR CIRCULAR RECESSED21/4" max.1 1/4" - 2" 1 1/4" - 2 3/4"13/4" min.5/16" min.3/8" min.7/8" max.3/4" max.2x BLOCKING 6FT MAXIMUM SPACING 36" MINIMUM36" MINIMUM1_2" Ø THROUGH-BOLTS AND WASHERS 1_2" Ø THROUGH-BOLTS AND WASHERS 2X4 TOP AND BOTTOM 2X2 BALUSTER 4X4 POST (DO NOT NOTCH) GUARD POST 1_2" Ø THROUGH-BOLTS AND WASHERS OUTSIDE-JOIST FRONT VIEW SIDE VIEW OPENING SHALL NOT PERMIT THE PASSAGE OF A 4" Ø SPHERE THE DRAWING REPRESENT CONSTRUCTION IN SCALE BUT DO NOT "SCALE" DRAWINGS TO OBTAIN MISSING INFORMATION OR TO INTERPRET ANY INFORMATION NOT SPECIFICALLY DIMENSIONED FOR EXACT DETAILING, FABRICATION OR CONSTRUCTION PURPOSES. CONTACT THE DESIGN ENGINEER FOR ANY REQUIRED MISSING DIMENSIONS. THE CONTRACTOR SHALL OBTAIN ALL PERMITS FROM THE BUILDING DEPARTMENT PRIOR TO THE START OF WORK. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE FIELD PRIOR TO COMMENCING WORK. VERIFY AND CONFIRM ALL DIMENSIONS, ELEVATIONS AND LOCATIONS OF EXISTING BUILDINGS AND OTHER STRUCTURES PRIOR COMMENCING THE WORK. DISCREPANCIES SHALL BE REPORTED TO THE DESIGN ENGINEER IMMEDIATELY, BEFORE PROCEEDING. THE CONTRACTOR ARE RESPONSIBLE FOR ACCURATE COORDINATION OF ALL RELATED PROJECT DRAWINGS, INCLUDING BUT NOT LIMITED TO ARCHITECTURAL, STRUCTURAL, CIVIL AND UTILITIES DRAWINGS. THE CONTRACTOR SHALL VERIFY ALL DETAILS, DIMENSIONS AND SYSTEMS PRIOR WORK OR ORDERING ANY ITEM AND COORDINATE WITH THE ARCHITECT OR THE RELATED ENGINEER. DO NOT COMMENCE WORK UNTIL CONDITION IS RESOLVED AND MODIFICATION IF NEEDED IS APPROVED. ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES THAT MAY EXIST PRIOR TO COMMENCING THE WORK. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY SHORING AND BRACING REQUIRED FOR PLUMPNESS, STRUCTURAL STABILITY AND SAFETY WHENEVER REQUIRED TO SUPPORT LOADS AS MAY BE IMPOSED UPON THE STRUCTURE AND ITS COMPONENTS DURING CONSTRUCTION. THE CONTRACTOR SHALL BE COMPLETELY RESPONSIBLE FOR THE SAFETY OF ADJACENT STRUCTURES, PROPERTY, HIS WORKMEN, AND THE PUBLIC, AS AFFECTED BY THE CONSTRUCTION OF THIS PROJECT. THESE DRAWINGS ARE INTENDED TO BE USED ONLY BY EXPERIENCED CONTRACTOR WITH KNOWLEDGE ON THIS TYPE OF WORK. CONTRACTOR SHALL UNDERSTAND THE COMPLEXITIES OF THE PROJECT AND THE CONSTRUCTION SEQUENCE . THE CONTRACTOR ASSUMES TOTAL RESPONSIBILITY FOR ANY CONSEQUENCE OF THAT ACTION. KEY NOTES NOTE: SOME FEATURES ARE NOT SHOWN FOR CLARITY. SEE ALL PROJECT PLANS, SECTIONS AND DETAILS FOR COMPLETE UNDERSTANDING. CONTACT ENGINEER FOR CLARIFICATIONS IF NECESSARY. NOTE: 1.RPS28 (16 GAUGE) TO REINFORCE TOP PLATE, AND RPS28Z (16 GAUGE ZMAXTM/) TO REINFORCE SILL PLATE. INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6.1. INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8. 2.PSPN516Z (16 GAUGE ZMAXTM/) AT TOP OR BOTTOM PLATES INTERNATIONAL RESIDENTIAL CODE- 2015/2018 P2603.2.1, R602.6.1 AND M1308.2. INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8. INTERNATIONAL PLUMBING CODE - 2015/2018 305.8. INTERNATIONAL MECHANICAL CODE - 2015/2018 305.5. 3.PSPN58Z (16 GAUGE ZMAXTM/) AT TOP OR BOTTOM PLATES INTERNATIONAL RESIDENTIAL CODE - 2015/2018 P2603.2.1 AND M1308.2. INTERNATIONAL PLUMBING CODE - 2015/2018 305.8. INTERNATIONAL MECHANICAL CODE - 2015/2018 305.5. 4.NS - NAIL STOPS TO PROTECT PIPING FROM DRYWALL NAILS OR SCREWS. INTERNATIONAL RESIDENTIAL CODE - M1308.2 AND P2603.2.1. NATIONAL ELECTRIC CODE - 2014/2017 300.4. INTERNATIONAL PLUMBING CODE - 2015/2018 305.8. INTERNATIONAL MECHANICAL CODE - 2015/2018 305.5. 5.SS1.5 (16 GAUGE) STUD SHOES REINFORCE AND PROTECT PLUMBING IN 2X. INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6 AND M1308.2 INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8, 2308.5.9 AND 2308.5.10 INTERNATIONAL PLUMBING CODE - 2015/2018 305.8. INTERNATIONAL MECHANICAL CODE - 2015/2018 305.5. 6.HSS2-SDS1.5 (16 GAUGE) HEAVY STUD SHOES TO REINFORCE AND PROTECT SINGLE 2X STUDS WHERE PIPE IS LOCATED. USES (12) SDS 1/4" x 11/2" SCREWS (INCLUDED). INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6 AND M1308.2 INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8, 2308.5.9 AND 2308.5.10 INTERNATIONAL PLUMBING CODE - 2015/2018 305.8 IINTERNATIONAL MECHANICAL CODE - 2015/2018 305.5. 7.HSS2-3-SDS3 (16 GAUGE) HEAVY STUD SHOE FOR TRIPLE 2X STUD. USES (12) SDS 1/4" x 3" SCREWS (INCLUDED). INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6 AND M1308.2. INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8, 2308.5.9 AND 2308.5.10. INTERNATIONAL PLUMBING CODE - 2015/2018 305.8. INTERNATIONAL MECHANICAL CODE - 2015/2018 305.5. 8.MSTC (16 GAUGE) AT TOP PLATE INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6.1. INTERNATIONAL BUILDING CODE - 2015/2018 2308.5.8. 9.CTS218 (14 GAUGE) TO REINFORCE TOP-PLATE FOR BOTH COMPRESSION AND TENSION FORCES SPECIAL DESIGN PROVISIONS FOR WIND AND SEISMIC-2015 4.1.4. INTERNATIONAL RESIDENTIAL CODE - 2015/2018 R602.6.1. INTERNATIONAL BUILDING CODE - 2015/2018 2308.9.8 9" MIN.4" TO 8 1/4"Engineering Design +1 (978) 870-6327 | info@buildoneeng.com DRAWN BY CHECKED BY DATE SHEET SHEET Nº No.REVISION DATE FHFS PROJECT NAME: DRAWING TITLE: 36 Constance Ave WEST YARMOUTH - MA PERMIT SET NOTES AND TYP. DETAILS S-300 MAY 14 2024 9 OF 9       