Loading...
HomeMy WebLinkAbout12-Equipment Details and Utility Schedules-Sheet No. EQ2.02POWER SUPPLY LINE RUN TO CONTROL CONSOLE (BY ELECTRICAL FSB) CONTROL CABINET (MB-30A) MOUNTED ON WALL 2 - 95 REBAR TOP -- -------------- (FINAL LOCATION OF CABINET TO BE DETERMINED IN AND BOTTOM (TYP.) FIELD WITH OWNERS MECHANICS) MANHOLE OPENING i i N TANK CONCRETE INSTALL CONTROL JOINTS AS COMPRESSED AIR SUPPLY LINE RUN TO r ! REQUIRED BY THE ENGINEER TO CONTROL CONSOLE (BY PLUMBING FSB) ! i I COVER PAD PREVENT UNCONTROLLED CRACKING E 1 CHAMFER ON ALL 5,000 PSI CONCRETE PAD AIR ENTRAINED i t 6"x6" - W6xW6 WELDING ! I t EXPOSED EDGES (TYP.) WIRE FABRIC WITH SILANE MASTERPROTECT H 1000 FINAL LOCATION/ STUB UP CONFIGURATION �' i' TWO (2) - 2" ELECTRICAL CONDUITS PROVIDED BY ELECTRICAL CONTRACTOR (TYP) (SEE NOTE 4) SEALER OR EQUAL TO BE COORDINATED IN THE FIELD WITH ,' !' I - ONE FOR POWER WIRING VEHICLE LIFT MANUFACTURER r t - ONE FOR INTRINSICALLY SAFE CONTROL WIRE AND AIRLINES PAVEMENT/FINISHED 3" GRADE r ! I NOTE: REBAR SHALL HAVE 2"-3" OF CONCRETE COVER PER t t INDUSTRY STANDARDS f! i a o ae' 0 c o a a o po 0 a 'UpOppp apOpapppUpapOpOpC Or,O 3 0 0 0 0 0 0 C G !L. 1/2" COMPRESSED AIR LINE (TYP) FOR ! , EVACUATION KIT PROVIDED BY PLUMBING 70,000 LBS INGROUND VEHICLE LIFT , r FSB. FINAL QUANTITY AND LAYOUT SHALL BE I , COORDINATED WITH VEHICLE LIFT INSTALLER. it / 1 i NOTES: 7oc,5-M oca o00000000$-0 0 Op[7.8pCpCpOpUpVpOpOpDpOpC ,OaGp6pOpOpOpDaGpOpO QQCOpO ,n on anon uC)o C)c<lc �oC)a(�of cr ,(�y(2. /�.(,on a()e C)o()ehen i{\\l.�()!•) Q 1. SEE PLUMBING DRAWINGS FOR THE DRAIN LINE CONNECTION TO SELECT BACKFILL BUILDING. COMPACTED TO 95% TIGHT TANK COVER PAD MANHOLE OPENING DETAIL MAX DENSITY 5,000 PSI CONCRETE TANK COVER PAD DETAIL !i i i !i i 41 2" DRAW LINES (BY PLUMBING FSB) FOR EVACUATIONS KITS. DRAIN LINES SHALL CONNECT TO FLOOR DRAIN PIPING SYSTEM, TO DIRECT WASTE WATER TO INDUSTRIAL WASTE WATER TIGHT TANK. FINAL LOCATION TO BE CONFIRMED BY VEHICLE LIFT MANUFACTURER. n fl"4M r^ A\A ILIf. AI . ATI/1AI 1-r-Un I f iTll Y711 f1A►1►fCATIAlI POCIT PEA GRAVEL POST HOUSING BACKFILL (TYP.) CONCRETE FLOOR INGROUND LIFT NOTES: 1. GEOTECHNICAL ENGINEER SHALL OBSERVE SUBGRADE SOILS BENEATH VEHICLE LIFT BEFORE CONCRETE IS POURED FOR THE LIFT. 2. CONCRETE MIX DESIGN SPECIFICATIONS: A. MIN 28 DAY COMPRESSIVE STRENGTH = 4500 PSI B. SLUMP = 4" ( MAYBE 6" WITH SUPERPLASTZCERS) C. MAX WATER/CEMENT RATIO = 0.50 D. MAX AGG. SIZE - 314" 3. GENERAL CONTRACTOR SHALL PROVIDE TEMPORARY PLUGS OR CAPS FOR ALL SERVICE CONDUIT OPENINGS. 4. THE ELECTRICAL CONDUITS RUNNING BETWEEN THE LIFT AND CONTROL CONSOLE SHALL BE INSTALLED IN ACCORDANCE WITH LOCAL ELECTRICAL CODES. A MAXIMUM OF FOUR 90 DEGREE BENDS MAY BE USED. 5. THE ELECTRICAL CONTRACTOR SHALL PROVIDE A FUSED ELECTRICAL DISCONNECT AND THE PLUMBING FSB SHALL PROVIDE AIR FILTER/REGULATOR/LUBRICATOR AND INSTALL THEM AT THE CONTROL PANEL FOR INCOMING POWER AND AIR, COORDINATE INSTALLATION REQUIREMENTS WITH VEHICLE LIFT MANUFACTURER. 6. INTRINSICALLY SAFE CONTROL WIRING MUST BE SEPARATED FROM NON -INTRINSICALLY SAFE WIRES BY A MINIMUM OF 2". T. THE ABOVE DETAIL IS SCHEMATIC ONLY AND FINAL, POWER, AIR AND UNDERGROUND CONDUIT REQUIREMENTS SHALL BE VERIFIED AND INSTALLED PER THE REQUIREMENTS OF THE APPROVED VEHICLE LIFT SUBMITTAL AND LIFT MANUFACTURER. FINAL SIZE, QUANTITY AND CONFIGURATION OF CONDUITS SHALL BE APPROVED BY THE VEHICLE LIFT MANUFACTURER PRIOR TO POURING THE SLAB. 8. VEHICLE LIFT MANUFACTURER SHALL CONFIRM THE MINIMUM AND MAXIMUM WHEELBASE REQUIREMENTS WITH THE OWNERS MECHANICS PRIOR TO PURCHASING EQUIPMENT. THE OWNER SHALL HAVE THE OPTION TO CHOOSE BETWEEN THE 18FT, 21FT AND 24FT TRACK DIMENSIONS. 9. SEE STRUCTURAL DRAWINGS FOR THICKENED TOP AND BASE SLAB REQUIREMENTS. CONCRETE SLAB DETAILS TO BE VERIFIED BY MANUFACTURER. 10. VEHICLE LIFT INSTALLATION TO CONFORM TO APPROVED SHOP DRAWINGS IN COORDINATION WITH LIFT MANUFACTURER. 70,000 LBS INGROUND LIFT CONDUIT DETAIL (MB-30) 1 /4" = 11-011 1 �2 I I i 4 ! I j ill SUMP OVERFLOW DRAIN (BY PLUMBING FSB) 3" SCH. 80 PVC Ji ( BACKWASH ENZYME LINE (BY GC) PENETRATE SUMP CENTER - ABOVE WATER LEVEL SUMP 1,500 GALLON CONCRETE WASH BAY WATER RECOVERY SYSTEM TANK WITH BAFFLE (VW12) (BY GC} -� (VW-9) (SEE NOTE 1) (BID ALT. NO. 1) 311" EMPTY ELECTRICAL CONDUITS �(Tw O TOTAL) (BY ELECTRICAL FSB) -- ---- - - j- - - K �II PRESSURE PUMP CONTROL PANEL TANK OVERFLOW J TOTIGHTTANK } L(VW_1A) (BY PLUMBING FSB} PRESSURE PUMP r I TWO (2) 2" SCH. 80 PVC + (VW-1) G� L _ 7CDD H 0 SUCTION LINES (BY GC) I HOT WATER HEATER JUL 1 `5 2021 r----r. AUTOMATIC UNDERCARRIAGE HEALTH DEPT. PUMP CONTROL PANEL (VW-5A) m I AUTOMATIC UNDERCARRIAGE PUMP 0 (VW5) - L 1 2 VEHICLE WASH PROCESS PIPING NOTES: 1. FOR VEHICLE WASH WATER RECLAIM SYSTEM (VW-9), THE PROCESS PIPING QUANTITY, SIZING AND STUB UP CONFIGURATION SHALL BE COORDINATED WITH APPROVED WATER RECLAIM SUBMITTAL. FINAL STUB UP LOCATIONS SHALL BE VERIFIED IN THE FIELD BY THE VEHICLE WASH EQUIPMENT INSTALLER. PROCESS PIPING AND UNDERGROUND CONDUITS FOR WATER RECLAIM SYSTEM SHALL BE INLCUDED AS PART OF THE BASE BID, THE ABOVEGROUND EQUIPMENT FOR THE WATER RECLAIM SYSTEM SHALL BE PART OF BID ALTERNATE NO.1. 2. OZONE, SUCTION AND BACKWASH PROCESS PIPING LINES SHALL BE PITCHED TO THE PRE-TREATMENT TANK (VW-12), 3. THE PRE-TREATMENT TANK SHALL BE VENTED PER LOCAL CODE REQUIREMENTS, BYTHE PLUMBING FSB CONTRACTOR, AS SHOWN ON THE PLUMBING DRAWINGS. 4. NOTE THAT INFORMATION ON THIS DRAWING IS SCHEMATIC ONLY AND THE CONTRACTOR SHALL BE REQUIRED To PROVIDE ALL EQUIPMENT, LABOR AND MATERIALS AS NEEDED TO PROVIDE A COMPLETE AND OPERABLE SYSTEM. CONTRACTOR SHALL MAKE MODIFICATIONS AS NECESSARY IN ACCORDANCE WITH MANUFACTURER AND STATE BUILDING CODE REQUIREMENTS, VEHICLE WASH UNDERGROUND PROCESS PIPING DETAIL 1 /8" if.041 TANK VENT BY PLUMBING FSB SUCTION TUBE TO EMPTY TANK. TANK INTERSTITIAL SPACE MONITORING PORT, RUN SEE SECTION 13 2170 2.02 FOR DETAILS ALARM TO MONITORING SYSTEM ALARM PANEL PAD SLOPE (TYP.) CROWN PAD TANK CONTAINMENT SUMPIMANHOLE ASSEMBLY WITH CROWNED AREA SURROUNDING COVER (TYP. SLIGHTLY AT CENTER TO SHED WATER TIGHT COVER (TYP.) COVER SHALL BE 441/44NCH FOR ALL TIGHT TANK COVER PAD OPENINGS) WATER, COORDINATE WITH DIAMETER COMPOSITE H-20 WHEEL LOAD RATED ENGINEER 8" CONCRETE PAD COVER MANHOLE FRAME AND o TIGHT TANK BELOW (BY GC) 42"MINIMUM WATER TIGHT TANK SUMP `•4 a = GRATE � CAST IRON DRAIN LINE FROM FLOOR DRAINS WET INTERSTITIALCONCRETE HYDROSTATIC SENSOR a (BY PLUMBING FSB} COVER PAD 42" CONTAINMENT COLLAR AROUND 22" MANWAY : , 4° o8 V-6" MIN. (TYP.) WITH 4-4" NPT FITTINGS ci LIQUID FLOAT SENSOR FOR HIGH LEVEL ALARM. SET � d � � 1'-6" MIN. {TYP.) I--� _ - �-"-� 1'-6"MIN. (TYP.) ALARM 1 AT 75% TANK CAPACITY � TANK LENGTH (Lj ALARM 2 AT 90% TANK CAPACITY TANK STRAP LOCATION (TYP. I OF 4) 12-Mv a ° $� 4m s- 1-bs $ g�go R$ a PLAN VIEW FILL DROP TUBE WITH PVC T FITTING SHALL EXTEND TO 5" FROM BOTTOM OF TANK 10,000 GALLON TIGHT TANK (TYP.) FACTORY FURNISHED DEADMAN 12-INCH MIN. PEAGRAVEL FILL ALL AROUND TIGHT CONSTRUCTION NOTES: TANK PER MANUFACTURERS RECOMMENDATIONS 10,000 GALLON TIGHT TANK SECTION DETAIL 1. CONCRETE COVER PAD SHALL BE Y-0" WIDER AND T-O" LONGER OVERALL THAN TANK SIZE AS SHOWN. 2. INSTALL 12" MIN PEA GRAVEL UNDER TANK, AND BACKFILL WITH 12° MIN PEA GRAVEL ALL AROUND TANK. 3. AREA TO BE RESTORED TO MATCH PROPOSED CONDITIONS. 4. TANK INSTALLATION SHALL BE RATED FOR H-20 WHEEL LOADING. TIGHT TANK DETAIL N.T.S. Industrial Equipment Power Schedule EQ Number Count Type Equipment Type I VOLTAGE PHASE AMPS HORSE POWER PLUG TYP CS-1 1 Bench Drill Press ERO 120 1 6 5-20 CS-2 1 Belt/Disk Sander ERO 110 1 14 1 5-20 CS-3 1 Standing Band Saw ERO 120 1 7 3/4 5-20 CS-5 1 Bench Grinder ERO 120 1 2.8 115 5-20 CS-6 1 Bench Planer ERO 120 1 15 5-20 CS-9 1 Table Saw N 220 1 18 5 1.6-30 CS-10 1 Miter Saw N 120 1 15 5-20 CS-12b 3 Wood Top Work Bench With Cabinet & E1ec Shelf (72inx36in) N 120 1 20 5-20 CS-13 1 Dust Collector N 208 3 7.5 Hardwire FS-6A 1 Lube Reel Bank N 120 1 20A BREAKER 5-20 FS-68 1 Lube Reel Bank N 120V 1 20A BREAKER 5-20 GS-1 1 Blade Sharpener ERO 115 1 6 1/2 5-20 GS-2 1 Chainsaw Sharpener ERO 120 1 4.3 5-20 GS-5 1 Bench Grinder ERO 120 1 4.2 5-20 GS-6 1 2 Ton Bridge Crane N 208 3 Starting 45 Nominal 14 Hardwire GS-8b 3 Steel Work Bench wl Casters & Eiec Shelf (72inx36in) N 120 1 20 5-20 MB-1 1 Tire Changer ERO 115 1 15 5-20 MB-2 1 Welder ERO 2001230 1 50/44 6-50* MB-3 1 Plasma Cutter ERO 2081240 1 46140 6-50* MB-4 1 Hose Crimper ERO 115 1 0.9Kw 5-20 MB-9 1 18K 2 Post Lift ERC 208 1 19 4 Hardwire MB-12 1 Chop Saw ERO 120 1 15 5-20 MB-18 1 MB Battery Charger ERO 120 1 14.9 5-20 MB-19 1 Old Welder ERO 208 1 110 6-50* MB-20 1 Small Parts Washer ERO 120 1 1.1 5-20 MB-22 1 Drill Press ERO 115 1 11.2 314 5-20 MB-24 1 Power Washer ERO 1 120 1 20 5-20 MB-30 1 70,000lbs Inground Lift N 208 3 33 Hardwire MB-31 1 Refrigerant Recovery Machine N 115 12 5-20 MB-35b 1 Steel Work Bench wl Electric Shelf (72inx36in) N 120 1 20 5-20 MB-38 1 Band Saw N 120 1 12 5-20 MB-39 1 Bench Grinder on Pedestal N 1 115 1 4.8 5-20 MB-40 1 18K 2 Post Lift N 208 1 1 22.5 4 1 Hardwire MB-41 1 5 Ton Bridge Crane N 208 3 Starting 117 Nominal 30.8 Hardwire MB-42 2 High Level Alarm N 120 1 6.6 Hardwire MB-44 1 Fluid Storage Sump Alarm N 120 1 6.6 Hardwire MB-45 1 Tight Tank High Level Alarm N 120 1 6.6 Hardwire PB-3 1 Brake/Rotor Machine ERO 115 1 15 5-20 PB- 4 1 Tire Changer ERO 115 1 12 5-20 PB-5 1 Tire Balancer ERO 115V 1 15A 5-20 PB-6 1 Bench Grinder ERO 115 1 3.7 1/3 5-20 PB-10 1 Battery Charger I ERO 120 1 14.9 5-20 PB-11 1 10K 2 Post Lift ERC 208 1 10.2 Existing Plug PB-20 1 Shop Vacuum ERO 120 1 8.5 5-20 PB-21 1 Police Drill Press ERO 115 1 7.6 112 5-20 PB-23 1 16K 2 Post Lift N 203 1 22.5 4 Plug Provide By Manufacturer SE-1 1 Bench Belt/Disk Sander ERO 120 1 4.5 5-20 SE-3 1 Chainsaw Sharpener ERO 120 1 4.3 5-20 SE-5 3 Steel Work Bench w/ Casters & Eiec Shelf (72inx36in) N 120 i 1 20 5-20 SE-9 1 Small Parts Washer ! N J 115 1 1.4 5-20 SS-1 1 Sign Plotter 1 ERO 115 1 25OW 5-20 SS-2 1 Computer ► ERO 120 j 1 20 5-20 SS-7 1 Computer Desk N 120 1 20 5-20 SS-10 1 Wood Top Work Bench With Cabinet & Elec Shelf (72inx36in) E N 120 1 20 5-20 SS-11 1 Existing Sign Shop Computer I ERO 120 1 1 20 5-20 VW-1 1 Pressure Washer N 208 3 40 7.5 Hardwire VW-1A 1 Manual Wash Pump Control Panel N 120i 1 20 Hardwire VW-2 1 Vehicle Wash - Hot Water Heater N 123 ' 1 15 Hardwire VW-5 1 Automatic Undercarriage Pump Skid ( N 230 3 90 40 Hardwire VW-5A 1 Under Carriage Wash Control Panel N 120 1 20 Hardwire VW-6 2 Automatic Undercarriage Photo Eye N ! 24VDC FROM VW-5A Hardwire VW-7 1 Vehicle Wash Pressure Washer Controls N 24VDC FROM VWA A Hardwire VW-9 1 Water Reclaim System N 208 3 30 3 Hardwire VW-9A 1 Water Reclaim (Controls/Enzyme) N 120 1 20 Hardwire VW-9B 1 Water Reclaim (Ozone Generator) N 120 1 20 Hardwire NOTE: • POWER AND PLUMBING SCHEDULES PROVIDED FOR COORDINATION PURPOSES ELECTRICAL CONTRACTOR SHALL CONFIRM RECEPTICAL REQUIREMENTS FOR EXISTING WELDERS AND PLASMA CUTTERS PRIOR TO ORDERING RECEPTACLES, Industrial Equipment Plumbing Schedule (Plumbing By Plumbing FSB) ** Equipment EQ Number Count Type Type VENT AIR WATER FS-1 1 120 gal Fluid Storage Tank (15W-40) N Vent Through Roof FS-2 1 120 gal Fluid Storage Tank (5W-20) N Vent Through Roof FS-3 1 120 gal Fluid Storage Tank (Hydraulic Oil) N Vent Through Roof FS-4 1 60 gal Fluid Storage Tank (Waste Antifreeze) N Vent Through Roof FS-5 1 1000 gal Fluid Storage Tank (Waste Oil) N Vent Through Roof FS-6A 1 Lube Reel Bank N Shop Air (1/2" connection) FMB 1 Lube Reel Bank N Shop Air (1/2" connection) FS-9 3 Fluid Pumps N 0.7 scfm @ 100 psi or 0,5 scfm @ 70 psi for 6:1 pumps (FS-2, FS-3).1.1 scfm @ 100 psi or 0.8 scfm @ 70 psi for 12:1 pump (FS-1) MB-1 1 Tire Changer ERO 5 scfm @ 150 PSI MB-3 1 Plasma Cutter ERO 8 bar 120 psi max MB-23 1 Portable Grease Caddie ERO 140 psi MB-29A 1 Waste Oil Pumpout N 60-120 psi MB-29B 1 Waste Antifreeze Pumpout N 60-120 psi MB-30 1 70,000lbs Inground Lift N 5 CFM @ 90 -110 PSI MS-1 1 Mower Lift N Shop Air (90-100psi) SE-7 1 Mower Lift N Shop Air (90-100psi) VW-1 1 Pressure Washer N 1/2" 6cfm 90 psi 1" water supply (from hot water heater) VW-2 1 Vehicle Wash - Hot Water Heater N 4" 4" air inlet 314" gas 2" water supply VW-5 1 Automatic Undercarriage Pump Skid N 1/2" 6 cfm 80-100 psi air 100 GPM Water, from 1.5-inch supply (pump skid shall comes with 250 gallon buffer tank) VW-9A 1 Water Reclaim (Controls/Enzyme) N Shop Air (1/2' connection) Project: NEW DPW FACILITY o� .Y�� o ..... . . . . . . . . . . ;.. MATTAGH E5 �NeORPORPAV0 �g G" TOWN OF YARMOUTH, MA 507 BUCK ISLAND ROAD YARMOUTH, MA 02673 Weston @sampso h Weston & Sampson Engineers, Inc. 100 Foxborough Boulevard Suite 250 Foxborough, MA 02035 (508) 698-3034 (800) SAMPSON www.westonandsampson.com Consultants: Seal: 014kCfk4.r � $o? JAM cS R, FAIR - v CIVIL -4 No.46434 N #L Revisions: Rev Date Description Issued For: BIDDING PROJECT TRUE SCALE: AS NOTED Date: Drawn By: Reviewed By: Approved By: SEPTEMBER, 13 2019 Author Checker Approver W&S Project No: 2170117-E Drawing Title: EQUIPMENT DETAILS AND UTILITY SCHEDULES Sheet Number: 11 1