Loading...
HomeMy WebLinkAbout9 Equipment Layout Plan Maintenance-Sheet No. EQ1.01i 2 3 4 S 6 o 6.5 8 8.2 o 00 I � I EXISTING LIFT TO BE RELOCATED I I RADIANT FLOOR HEATING EQUIPMENT LOCATED IN THIS AREA BY CONTRACTOR (ERC). SEE SPEC I VEHICLE AND EQUIPMENT STORAGE SECTION 14 45 DO - VEHICLE LIFTS ° VEHICLE PROFILE I ° ° ! 0 136 MB-34 ° ° o° oM MB-35b .,.. MB-1 MB-27 M-10"rh MB-7. rJ PB-21 VIB MB-3 MB-26 �; MB-26 I,1 PB-15 I3-3ra N�o-ov I MB-8 I N PB-6 I I j MB-21 MB-27 ti a PB-12 o-FMB.22 MB-2 MB-17 m i -o of I WASH BAY � PB-7 �`= MB-37 CENTER SUMP AND TRENCH I e �� PB-11 �`� DRAIN. SEE STUCTURAL PLANS 144 ` MB-1 MB-36 I I � �I I - VW-3 �z-�. � ; MB-28 - I FOR DETAILS I` ( � � o � _ I I MB-8 MB-8 m 1 ( _ - - uMB-6 M o9 10" m VEHICLE EXHAUST REEL--�-PB-4 gHj{v C FSB CONTRACTOR LE EXHAUST REEL�IT__ MB-11 I I BY HVAC FSB CONTRACTOR I� DPW VEHICLE 0-Fs-7VW-7j II I I a �-I MB-S MB-27 MB-27 J _B-39 MAINTENANCE EXISTING ONTRACTOR ERC SEE SPEC II'o L� PB-18 (ERC). 141 SECTION 14 45 00 -VEHICLE LIFTS a r ml E VW-4 FS-66 0 �� I I `.r. I MB-27 MB-27 8-2 I � PB-19 I rc - _ - - - - - - - r• ---- -- - 7,11 IT, J 5 o PB-11 MB-23 L_ - - - - - - _ - --- i `APB-20 8'-O" MB-20, \ u o o ii ii u u iia `• PB-14 a ii a I, ii �x I VW-s I I L 1 1 I V VW-12 VW-9B I I ... FS-9 - �- FS-6A _ M_B-42 - -. FS-1 -MB-3o- ---- - TOILE--� CoK �� ----- --.-- -_- - __-_ __ - - - --- _ - o 1 � MB 29A 3, _ 0" PB-23 MB-40 M8-9 MB-29- I �. � _ _ _ 1/V1t-9A MB-4 B-44 MB-42 FS-9 i it X W-8 VW-1A BID ALT N0.1 V� FS-2 FLUIDS ROOM ! -/ PREFABRICATED TRENCHES VW-8� FOR UNDERCARRIAGE WASH BY VW-10'I I I I I - MECHANICS PLUMBING FSB. (SEE NOTE 7) OFFICM IF 4 +- VW-10 VW-5A-� I' ]=+PB-10( _ _ o = - _ MB-24 140 FS-5 l 8-I VW-� k-VW-8 _ r; o , i I o ff, o VEHICLE EXHAUST REEL MB-28 BY WAG FSB CONTRACTOR , / = FS--9 FS-3 I , - I ° vw-6 ° ° ° ° j ° ° j fi - - � V NT PIPING FOR TIGHT TANK AND OILWATER SEPARATOR r- -► E } - I I I VW-13 I I LOOP DETECTOR SHALL BE FURNISHED: AND INSTALLED LOCATED AGAINST WALL IN THIS AREA I I BY THE VEHICLE WASH CONTRACTOR. LOOP L _ _ J DETECTOR SHALL BE CONNECTED TO THE, AUTOMATIC HEAUTOMATIC UNDERCARRIAGE WASH SYSTEM TO ARM THE PHOTOEYES. I I i I I I 1 2 3 4 6 6.5 8 0 8.2 0 EQUIPMENT LAYOUT PLAN MAINTENANCE GENERAL NOTES: ABBREVIATIONS: 1. EQUIPMENT LAYOUTS ARE SCHEMATIC. GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING EXACT LOCATIONS WfTH OWNER'S MECHANICS AND N NEW EQUIPMENT TO BE SUPPLIED AND INSTALLED BY THE CONTRACTOR. MANUFACTURER REQUIREMENTS. COORDINATE ALL UTILITY REQUIREMENTS WITH SUB -CONTRACTORS. FINAL EQUIPMENT LOCATIONS SHALL BE CONFIRMED BY THE OWNER'S MECHANICS PRIOR TO RUNNING UTILITIES AND INSTALLATION EQUIPMENT. ERC EXISTING EQUIPMENT TO BE RELOCATED AND INSTALLED BY THE CONTRACTOR. 2. GENERAL CONTRACTOR SHALL COORDINATE UTILITY REQUIREMENTS OF EXISTING EQUIPMENT PRIOR TO INSTALLATION OF SERVICES. UTILITIES FOR ERC EQUIPMENT TO BE PROVIDED BY THE FILED SUB -BID CONTRACTORS 3, PRIOR TO RUNNING UTILITIES, GENERAL CONTRACTOR SHALL MARK OUT ALL EQUIPMENT LOCATIONS ON THE FLOOR USING TAPE OR ANOTHER ACCEPTABLE MEANS, AND SHALL REVIEWIREVISE FINAL EQUIPMENT LOCATIONS AS DIRECTED BY THE OWNER, OWNER'S MECHANICS AND THE ENGINEER. ERO EXISTING EQUIPMENT TO BE RELOCATED AND INSTALLED BY THE OWNER. 4. PB-11, PB-23, MB-40, MB-9 AND MS-30 SHALL ALL BE CENTERED IN THE MAINTENANCE BAYS AS DEFINED BY THE OVERHEAD DOOR OPENING. CONFIRM INSTALLATION UTILITIES FOR ERO EQUIPMENT TO BE PROVIDED BY THE FILED SUB -BID CONTRACTORS. LAYOUT DIMENSIONS WITH THE MANUFACTURER. ALSO SEE OWNER'S MANUALS. NIC NEW EQUIPMENT (PROVIDED AND INSTALLED BY THE OWNER (NOT IN CONTRACT), 5. ELECTRICAL, MECHANICAL, AND PLUMBING FSBs SHALL PROVIDE AND CONNECT UTILITIES TO ALL EQUIPMENT AS SHOWN ON THE ELECTRICAL, MECHANICAL AND HOWEVER UTILITIES FOR THIS EQUIPMENT SHALL BE PROVIDED BY THE FILED SUB -BID PLUMBING DRAWINGS AND SPECIFICATIONS, AND IN ACCORDANCE WITH THE MANUFACTURERS REQUIREMENTS IN ORDER TO PROVIDED A COMPLETE AND OPERABLE CONTRACTORS. SYSTEM. 6. THE ELECTRICAL CONTRACTOR SHALL HAVE A MASSACHUSETTS LICENSED ELECTRICIAN CONFIRM THE VOLTS, PHASE, AMPS, AND NEMA PLUG CONFIGURATION FOR FSB FILED SUB -BID SUBCONTRACTOR EACH PIECE OF EQUIPMENT (INCLUDING EXISTING EQUIPMENT TO BE RELOCATED) IN ADVANCE OF ORDERING MATERIALS AND INSTALLATION. 7. THE TRENCH DRAINS SHALL BE INSTALLED BY THE PLUMBING FSB HOWEVER THE H2O WHEEL LOAD RATED STEEL COVERS FOR TRENCHES SHALL BE FURNISHED BY NIA NOT APPLICABLE VEHICLE WASH CONTRACTOR. COVERS FOR TRENCH SHALL BE STAINLESS STEEL AND SHALL COVER THE ENTIRE LENGTH OF TRENCHES, INSIDE AND OUTSIDE OF THE GUIDE RAILS. 8. UNDERCARRIAGE SPRAY BAR MANIFOLD LOCATED IN UNDERCARRIAGE TRENCHES SHALL BY FURNISHED AND INSTALLED BY THE GENERAL CONTRACTORS VEHICLE WASH SUBCONTRACTOR, SEE SECTION 111126. II ' JUL '1 5 2021 HEALTH( DEPT. Industrial Equipment Schedule Equipment EQ Number Description Count Type Spec Number Notes FS-1 120 gal Fluid Storage Tank (15W-40) 1 N 111129 FS-2 120 gal Fluid Storage Tank (5W 20) 1 N 111129 FS-3 120 gal Fluid Storage Tank (Hydraulic Oil) 1 N 111129 FS-4 60 gal Fluid Storage Tank (Waste Antifreeze) 1 N 111129 FS-5 1000 gal Fluid Storage Tank (Waste Oil) 1 N 111129 FS-6A Lube Reel Bank 1 N 111129 FS-613 Lube Reel Bank 1 N 111129 FS-7 Waste Oil Caddy 2 N 111129 FS-8 Waste Antifreeze Caddy 1 N 111129 FS-9 Fluid Pumps 3 N 111129 MB-1 Tire Changer 1 ERO N/A MB-2 Welder 1 ERO N/A MB-3 Plasma Cutter 1 ERO NIA MB-4 Hose Crimper 1 ERO N/A On Mezzanine MB-5 Small Drawer 1 ERO NIA MB-6 Maintenence Torch Cart 1 ERO N/A MB-7 Bottle Jack 1 ERO N/A MB-8 Parts Storage 3 ERO NIA MB-9 18K 2 Post Lift 1 ERC 14 45 00 MB-10 Flammable Storage 45 Gal 3 ERO, N/A MB-11 Shop Press 1 ERO N/A MB-12 Chop Saw 1 ERO N/A On Mezzanine MB-13 Small Bin 1 ERO N/A MB-14 Hose Parts Bin 1 ERO N/A On Mezzanine MB-15 Hose Storage 1 ERO N/A On Mezzanine MB-16 Hose Parts Drawers 1 ERO N/A On Mezzanine MB-17 Floor Jack 1 ERO N/A MB-18 MB Battery Charger 1 ERO N/A MB-19 Old Welder 1 ERO N/A MB-20 Small Parts Washer 1 ERO N/A MB-21 Maintenance Tool Box 1 ERO N/A MB-22 Drill Press 1 ERO N/A MB-23 Portable Grease Caddie 1 ERO N/A MB-24 Power Washer 1 ERO N/A MB-25 10 Ton Bottle Jack 2 ERO N/A MB-26 Parts Shelving (4ft) 2 NIC N/A MB-27 Parts Shelving (6ft) 10 NIC NIA MB-28 Cantilever Rack (Level) 3 N 12 40 00 BID ALT NO.1 MB-29A Waste Oil Pumpout 1 N 111129 MB-29B Waste Antifreeze Pumpout 1 N 111129 MB-30 70,000lbs Inground Lift 1 N 14 45 00 MB-30a Inground Lift Control (Wall Mounted) 1 N 14 45 00 MB-31 Refrigerant Recovery Machine 1 N 12 40 00 BID ALT NO.1 MB-32 Tire Rack 3 N 12 40 00 BID ALT NO.1 On Mezzanine MB-33 Welding Screen 2 N 12 40 00 BID ALT NO.1 MB-34 Oil Bar 1 N 111129 Vehicle Storage Garage MB-35a Steel Work Bench (72inx36in) 4 N 12 40 00 BID ALT NO.1 One Located on Mezzanine MB-35b Steel Work Bench w/ Electric Shelf (72inx36in) 1 N 12 40 00 BID ALT N0. 1 One n ( 1 ) with Electric Shelf MB-36 Weld Table 1 N 12 40 00 BID ALT NO.1 MB-37a Bench Vise 2 N 12 40 00 BID ALT NO.1 MB-37b Big Weld Vise 1 N 12 40 00 BID ALT NO.1 MB-38 Band Saw 1 N 12 40 00 BID ALT NO.1 MB-39 Bench Grinder on Pedestal 1 N 12 40 00 BID ALT NO.1 MB-40 18K 2 Post Lift 1 N 14 45 00 MB-41 5 Ton Bridge Crane 1 N 142213 MB-42 High Level Alarm 2 N 111129 MB-43 Bottle Jack 1 N 12 40 00 BID ALT NO.1 MB-44 Fluid Storage Sump Alarm 1 N 111129 MB-45 Tight Tank High Level Alarm 1 N 132170 PBA Police Torch Cart 1 ERO N/A PB-2 Floor Jack 2 ERO NIA PB-3 Brake/Rotor Machine 1 ERO NIA PB-4 Tire Changer 1 ERO N/A PB-5 Tire Balancer 1 ERO NIA PB-6 Bench Grinder 1 ERO N/A PB-7 Bench Vise 1 ERO N/A PB-8 Bench Tool Box 1 ERO N/A PB-9 Metal Parts Drawers 1 ERO NIA PB-10 Battery Charger 1 ERO NIA PB-11 10K 2 Post Lift 1 ERC 14 45 00 PBA 2 Gun Cabinet 1 ERO NIA Wall Mounted PB-13 Tool Box 1 ERO NIA PB-14 OEM Cart 1 ERO N/A PB-15 Parts Drawers 1 ERO NIA PB-16 Not Used 1 NIA NIA P13-17 Police Tire Rack 1 ERO NIA PB-18 12 Ton Shop Press 1 ERO NIA PB-19 Portable Grease Caddie 1 ERO ILIA PB-20 Shop Vacuum 1 ERO N/A PB-21 Police Drill Press 1 ERO NIA PB-22 Steel Work Bench wl Casters (72inx36in) 2 N 12 40 00 BID ALT NO.1 PB-23 16K 2 Post Lift 1 N 14 45 00 BID ALT NO.1 VW-1 Pressure Washer 1 N 111126 VW-1A Manual Wash Pump Control Panel 1 N 111126 VW-2 Vehicle Wash - Hot Water Heater 1 N 111126 VW-3 Vehicle wash Boom 1 N 111126 VW-4 Vehicle Wash Mobile Platform 1 N 111126 VW-5 Automatic Undercarriage Pump Skid 1 N 11 1126 VW-5A Under Carriage Wash Control Panel 1 N 11 1126 VW-6 Automatic Undercarriage Photo Eye 2 N 111126 VW-7 Vehicle Wash Pressure Washer Controls 1 N 111126 VW-8 Rocker Panel/ Wheel Washer 1 N 111126 VW-9 Water Reclaim System 1 N 111126 BID ALT NO.1 VW-9A Water Reclaim (Controls/Enzyme) 1 N 111126 BID ALT NO.1 VW-913 Water Reclaim (Ozone Generator) 1 N 111126 BID ALT NO.1 VW-10 Undercarriage Wash Manafold Pre -Fab Trench Drains 2 N Div 22 VW-11 Vehicle Wash Guide Rails 1 N 111126 VW-12 Vehicle Wash Pre -Treatment Tank (1500gal) 1 N 11 11 26 VW-13 Loop Detector 1 N 111126 LEGEND HATCHES LINE TYPES CEILING MOUNTED _ + MEZZANINE LIMITS WALL NIC/ERO EQUIPMENT WM MOUNTED Project: NEW DPW FACILITY Y. 0„ C." MATTACH 5. H�oRPORNIVO (90 TOWN OF YARMOUTH, MA 507 BUCK ISLAND ROAD YARMOUTH, MA 02673 Weston @sampso n­ Weston & Sampson Engineers, Inc. 100 Foxborough Boulevard Suite 250 Foxborough, MA 02035 (508) 698-3034 (800) SAMPSON www.westonandsampson.com Consultants: Seal: c7` JAMcS x >`okI CIVIL y No, 46434 'o?4At 1aG ;� Revisions: Rev Date Description Issued For: BIDDING PROJECT TRUE SCALE: AS NOTED Date: SEPTE:MBER,13 2019 Drawn By: TJC Reviewed By: TJC Approved By: JRF Vi Project No: 2170117-E Drawing Title: EQUIPMENT LAYOUT PLAN MAINTENANCE Sheet Number: EQ1 01 e W ESTON & SAMPSON COPYRIGHT 2019