HomeMy WebLinkAboutCOC request 6.13.2024Engineers
Environmental Scientists
Software Developers
Landscape Architects
Planners
Surveyors
349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 / 508-778-8919
JUNE 12, 2024 www.bscgroup.com
Yarmouth Conservation Commission
1146 Route 28
South Yarmouth, MA 02664
Attn: Brittany DiRienzo, Conservation Administrator
RE: Request for Certificate of Compliance, DEP File #83-1632, 49 and 51 South Shore Drive,
South Yarmouth, MA, BSC Job #100985.00
Dear Members of the Conservation Commission,
BSC Group, Inc. (BSC) is pleased to submit this Request for Certificate of Compliance (RCOC) on behalf of Dawn
Karol (the Applicant), for the property located at 49 South Shore Drive and 51 South Shore Drive, (the Site) in South
Yarmouth. The permitted project at the Site included the construction of a stone revetment wall across both
properties, grading above the stone revetment, and a stairway over the wall in front of 51 South Shore Drive. This
application is being submitted in accordance with the Massachusetts Wetlands Protection Act and the Town of
Yarmouth Wetlands Protection By-law and associated Regulations.
BSC survey staff conducted an inspection to confirm the current condition of the Site. All work associated with the
Order of Conditions (OOC), DEP File #SE083-1632, issued on 5/19/2003 was not completed. Similar work was
completed on the Site, but under a subsequent OOC (DEP File #SE 83-1774). Attached please find the WPA Form
8A and RCOC Application Checklist.
If you have any questions or require additional information, please contact our office at (508) 778-8919 or via email at
hraddatz@bscgroup.com or byergatian@bscgroup.com.
Sincerely,
BSC Group, Inc.-
Brian G. Yergatian, P.E., LEED AP
Manager of Civil Engineering, Senior Associate
cc: Dawn Karol, 424 Adams Street, Milton, MA 02186
Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492
Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 • bdiriezno@yarmouth.ma.us
Rev 03/2024
Administrative Checklist
Certificate of Compliance
General Information:
• All filings must be made on Town of Yarmouth forms.
• All applications must be submitted two weeks prior to the next scheduled Conservation
Commission meeting. Refer to Meeting Schedule.
• Failure to follow the Administrative Checklist shall result in an Administrative Incomplete
Application and will not be scheduled for a Public Hearing.
• Contact the Conservation Office if you need assistance.
Submitting an Application:
1 complete hardcopy of the COC application, plan/sketch, and other supporting
information to the Conservation Office - mailed to or dropped off at Town Hall.
1 complete pdf of the COC application, plan/sketch, and other supporting information
emailed to bdirienzo@yarmouth.ma.us and fkelley@yarmouth.ma.us
______ Signed statement from an Engineer or similar professional to who prepared the
approved plan. – Include in hardcopy and digital submission.
______ As-Built plan – Include in hardcopy and digital submission. Refer to 310 CMR
10.05(9)(d). *Refer to issued Order of Conditions: Special Conditions to determine if
required*.
Local filing fee. Refer to Fee Schedule. Make check payable to “Town of Yarmouth”
and include property address in memo.
All forms, Fee Schedule and Meeting schedule can be found at
https://www.yarmouth.ma.us/696/Filing-Forms.
*Click Yarmouth Street Index for parcel-related Conservation documents.
CONSERVATION
OFFICE
wpaform8a.doc rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
83-1632
Provided by DEP
A. Project Information
1. This request is being made by:
Dawn Karol
Name
424 Adams Street
Mailing Address
Milton
City/Town
MA
State
02186
Zip Code
617-543-7022
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Dawn Karol
Applicant
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
5/19/2003
Dated
83-1632
DEP File Number
3. The project site is located at:
49 & 51 South Shore Drive
Street Address
Yarmouth
City/Town
19
Assessors Map/Plat Number
9 & 10
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Dawn Karol
Property Owner (if different)
Barnstable
County
15764 (49) & 15765 (51)
Book
275 (49) &
25 (51)
Page
Certificate (if registered land)
5. This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorilycompleted.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
83-1632
Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).