SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. 51 Lot / (, Zone of Contribution: In_ Out Acreage
Commercial: Residential: W-
Street: 7,A S ,'
Village: .045 , li'Ls'I1 /j, Floor Plan: ✓ #Bedrooms:_
Owner: L/C(&Q (ó7 I Installer: e/z � .
Address: J Phone: � V7 75- - .3 s f 5
Phone:
n
Builder: Engineer: n// isr/
Address: Phone: 7 7 - 0 -2-71
Phone:
N/A YES NO
1.Required#of copies received 1../7
2. Date of soils exam and percolation test not older than 2 years l./.;
3. 4-5 ft of naturally occurring pervious material,above water table l
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.:
5. Water line 10 ft from septic components Var.:
6. Benchmark indicated and shown-NGVD if near wetlands -t./!
7. Septic tank minimum 10 ft from foundation, deck Var.: V
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: -�'-
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: tom..
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13. Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: C�
15. System not in top or subsoil(A,B horizons)or 5' removal !^
16. Proposed contours are suitable t/
17. System meets slope requirements-min. 1/8", 1/4"preferred l�
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel 1�
21.No garbage disposal
22. System adequately sized for its intended use '✓
23. Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade _./
25. Inspection port on plastic chambers/leach field `/'-
26. Electrical permit for pump chamber/Separate meter for duplexes �/
27.Pump system-2" line,weep hole,check valve,tee in dbox, pump size �_.--
28. Septic tank/pump chamber to be factory waterproofed -..---'
29. Vent provided if leaching below 3 feet,under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. #bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
CPlan reviewed by: 6/03/03