Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST _ocation: AM //2 LOT 0 ' Date of Subdivision Ap rov Street . " !L �,c> i9fa� / z. Zone of Contribution. Out Village � k'-T / Commercial Residential Owner: C�� /�9?��-TJ� ,��_ '�`"�` Installer z l 5 .32 2- �'o2- 62 5'7 Builder: Engineer A.z%� ./ S'. .3---at __)/77 N/A YES NO 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) ,k. 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. \ 6. Benchmark indicated and shown - NGVD if near wetlands. '' 7. Building sewer does not exit center of house. >' 8_Septic tank a minimum of 10 feet from house and deck. k 9. ;.eaching a minimum of 20 feet from house and 10 feet from deck. ' 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. 12. System meets all other setback requirements. 13. Uses adjustment for maximum high groundwater. 'K 14..Leaching 4 -5 feet above adjusted water table or bottom of test pit. •,, 15. System not in top or subsoil or 5 foot removal. 16. Proposed contours are suitable. \ 17. System meets slope requirements - min. 1/8", 1/4" preferred. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. 19. Specified tee sizes are proper, gas baffle on outlet tee. k 20. Sewage flow under 10,000 apd for parcel. - 21.'No garbage disposal. 22. System adequately sized for its intended use. ,i,. 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. 'Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box, alarm on separate circuit. X 27. Septic tank and pump chamber to be Factory waterproofed. )( 28. Vent provided if leaching below 3 feet or under driveway or parking. V 29. Engineer to inspect and certify : a. clay removal b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. 31. H2O loading when system subject to vehicular traffic. 32. Title V application and fee signed by a licensed installer. 33. Foundation footing 2 feet above adjusted water table, 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading. 35. Subdivided prior to April 7,1989 - Phosphorus Zone 300'. Plan reviewed by: s.