HomeMy WebLinkAboutReview Checklist 7
TOWN OF YARMOUTH % C-' .r / L' � Ijl , 2cti�
SEWAGE PLAN REVIEW CHECKLIST /v
Location: A.M. Lot 7-'>(, Zone of Contribution: In (yOut_ Acreage
Commercial: Residential:
Street ! A'.z ,< t_ 1;
Village: Floor Plan: l_, - #Bedroom •
i I
Owner: ` ' ; /" •c" i '; / ,J Installer: b <=2C c,, ,;s41;,.-\
Address: Phone: -,; - y j 7 - c 4 c 3
Phone:
Builder: Engineer: ( ; >j ;, a i5
Address: Phone: S L s 3)D ceisp _ '/
Phone:
N/A YES NO
1.Required#of copies received
2. Date of soils exam and percolation test not older than 2 years V
3. 4-5 ft of naturally occurring pervious material,above water table
4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: /
5. Water line 10 ft from septic components Var.: ✓
6. Benchmark indicated and shown-NGVD if near wetlands
7. Septic tank minimum 10 ft from foundation,deck Var.: i'
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: v
9. Leaching minimum 100 ft from wetlands Var.:
10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: _ �✓
11. Tank/leaching minimum 10 ft from property line Var.:
12. System meets all other setback requirements Var.:
13.Uses adjustment for maximum high groundwater Var.:
14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.:
15. System not in top or subsoil(A,B horizons)or 5' removal
16. Proposed contours are suitable
17. System meets slope requirements-min. 1/8", 1/4"preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specified tee sizes are proper,gas baffle on outlet tee /
20. Sewage is under 10,000 gpd for parcel v
21.No garbage disposal V
22. System adequately sized for its intended use ;/
23. Minimum 6"stone or compacted below tank and dbox
24.Manhole covers within 6"of grade,pump chamber cover to grade
25.Inspection port on plastic chambers/leach field
26.Electrical permit for pump chamber/Separate meter for duplexes
27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size v'"
28. Septic tank/pump chamber to be factory waterproofed .,
29.Vent provided if leaching below 3 feet,under driveway/parking
30.Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: .,/
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature .;/
33.H-20 loading is subject to vehicular traffic,groundwater 1/
34. Title V Application and permit fee, installer signature
35. Foundation footing min.2 feet above adjusted ground water for new house v
36. Deed Restriction required max. #bedrooms: max. flow:3,2 . gpd v/
37. Check area lots for groundwater/Label groundwater-in-Ass,ssor's Map L./
Plan reviewed by: 7 C9. , c � _ 6/03/O3