HomeMy WebLinkAboutVCOD 2024-1 SPR Approval 811 Rte 28 061324 with AttachmentsJune 5, 2024
5:30 PM
VCOD SPR Rev. 12/12/12 Page 2 of 2
Brief Project Description: _________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
List (petition number and date) and attach copies of prior Board of Appeals Petitions
(This information can be obtained from the Board of Appeals Office)
______________________________________________________________________
______________________________________________________________________
Special Permit Relief Required from Zoning Board of Appeals, if applicable (Specify
Section and Relief Sought):
______________________________________________________________________
List of Hazardous Materials and Quantities (attach if necessary):
______________________________________________________________________
Signature of Applicant____________________________Date____________________
Signature of Owner______________________________Date____________________
(if not Applicant)
The Applicant is proposing to redevelop the property as multi-family housing, with a
total of eight, one-bedroom units. The existing single-family dwelling and shed will be
razed and a new multi-family townhouse building will be constructed. The project also
includes reconfiguration of a shared-access drive, utility connections, a new sewage
disposal system, stormwater management and landscaping.
N/A
No on-site storage of hazardous materials will be permitted.
3/17/2024
OWNERS:
Roseanna Nikolaidis
4 Vineyard Cir
Sagamore Beach, MA 02562
Lambros Nikolaidis
812 Main St. Rt 28
South Yarmouth, MA 02664
Engineers
Environmental Scientists
Software Developers
Landscape Architects
Planners
Surveyors
349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 / 508-778-8919
MARCH 18, 2024 www.bscgroup.com
Town of Yarmouth
Department of Community Development
1146 Route 28
South Yarmouth, MA 02664
RE: 811 Route 28, Multi-family development, VCOD
To Whom It May Concern,
BSC Group, Inc. (BSC) Is pleased to present the following application package for a multi-family residential development
at 811 Route 28, pursuant to Section 414 of the Town of Yarmouth Zoning Bylaws, for a VCOD development. The following
summary has been prepared to assist the Town in its review of the proposed development, as outlined in the Operational
Regulations of the Yarmouth Planning Board.
Existing Site
The site exists today as a developed single-family residence. The parcel contains 25,500± square feet of uplands and is
located on Route 28 In the B2 Zoning District and the HMOD1, VC2 Overlay Districts.
The site currently has two curb cuts near the northeast and northwest corners of the property. The more westerly curb
cut Is a shared driveway, which Is also used by 807 Route 28, a commercial property. The dwelling Is served by municipal
water, gas, overhead electric & telecommunication utilities. The site includes an on-site sewage disposal system for
sanitary sewage disposal.
In addition to the single-family dwelling, the site also contains a large shed that Is located in the southwest corner of the
property. The front yard contains a large gravel open space, as well as portions of a parking lot, which serves the
adjacent commercial property at 807 Route 28.
Proposed Development
The Applicant Is proposing to construct a 2-story townhouse-style apartment building in the center of the property,
containing eight (8), one-bedroom, townhouse-style apartment units. Prior to construction of the proposed site
improvements, erosion & sedimentation controls will be established and the existing dwelling and shed will be
demolished.
Site Access
The site is located on Main Street (Route 28), which is a State Highway. Therefore, an Access Permit is required by
MassDOT prior to construction. The Applicant is proposing to reconstruct the existing sidewalk that runs along Route 28
in front of the property, which will likely be required by MassDOT. In addition, the easterly curb cut will be closed, and the
shared driveway on the western side of the property will be reconfigured to serve the proposed development, as well as
the adjacent site at 807 Route 28. The proposed driveway is 230 feet long and will provide access to each of the units. A
paved turnaround is included for Fire Department access and turnaround. Each unit will have Its own parking space in
front of the unit.
349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 / 508-778-8919
Wastewater
The design includes a septic system that is located on the western side of the building, underneath the common
driveway. Soil testing was performed by BSC and witnessed by the Yarmouth Health Division Staff In November 2023.
Five (5) test pits were excavated, evaluated and logged. Site soils are comprised of fine sand with generally 2-3 feet of
overburden consisting of loamy sand topsoil and subsoil. Groundwater was observed in Test Pits 3, 4 & 5 at depths of 120,
120 and 115" below the existing ground surface, respectively. Percolation testing was performed in Test Pits 3 and 5,
yielding a result of less than 2 minutes per inch.
Stormwater Management
Stormwater management facilities have been designed in accordance with the Massachusetts Stormwater Handbook.
Catch basins located at the northern and southern end of the driveway will collect stormwater runoff from the driveway
and surrounding pervious areas. Collected stormwater from these areas will be treated via water quality structure and
then conveyed to a subsurface Infiltration system consisting of twenty-one (21) Cultec R-330XLHD leaching chambers
for attenuation and groundwater recharge. Stormwater runoff from the building roof will be collected by gutters and
conveyed via roof drains to an Infiltration system located on the eastern side of the building, consisting of ten (10) Cultec
R-150XLHD leaching chambers. In addition to these systems, the stormwater design for this facility also includes a bio-
retention area (rain garden) in the southeast corner of the site, which will manage stormwater runoff from the eastern
side yard. Each of these systems has been designed in accordance with the Massachusetts Stormwater Management
Standards, as is capable of attenuating peak runoff associated with a 100-year storm.
Utility Services
Other utility services required to support this project include domestic water, electric, telecommunications and natural
gas. The existing water service will be upgraded to a 2" domestic water service and reconfigured to serve the proposed
building. Existing electrical service to the house is provided by overhead wire to a riser pole located along the eastern
boundary of the site, approximately 75 feet away from Route 28. The applicant is proposing to maintain the overhead
electrical service to this pole but will provide a new underground service to the building from this point. The final design
will ultimately be as approved by Eversource.
The site Is also served by natural gas. The existing service will be decommissioned, and a new gas service will be
installed to serve the new building. This design will ultimately be as approved by National Grid.
We look forward to presenting this project to the Town. In the interim, please feel free to contact us, should you have
any questions or concerns.
Sincerely,
BSC Group, Inc.
Brian G. Yergatian, P.E., LEED AP
Senior Civil Engineering Manager, Senior Associate
PRODUCT SPECIFICATION SHEET
1-Light Black Wall Sconce
Black
Item No:LDOD4039BK
Silver
Item No:LDOD4039S
Available Finishes
7.88inches
4.25inches
6.5inches
Engineers
Environmental Scientists
Software Developers
Landscape Architects
Planners
Surveyors
349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 / 508-778-8919
APRIL 30, 2024 www.bscgroup.com
Kathy Williams, P.E.
Yarmouth Town Planner
1146 Route 28
South Yarmouth, MA 02664
RE: DRC Application, 811 Route 28
Dear Kathy,
BSC Group, Inc. (BSC) has revised the site plans for the proposed multi-family development at 811 Route 28 in
South Yarmouth. The plans were revised based on the comments that we received during the VCOD Site Plan
Review meeting on April 16, 2024. The following summarizes the plan modifications that have resulted in the current
site plans, revised April 26, 2024:
· Added a sidewalk connection to the existing sidewalk on Route 28.
· Moved the bike rack further away from the fire lane and added protective bollards.
· Added a 3’ x 3’ concrete pad to the rear of each unit for a condenser. The hot water heater will be located in
the closet below the stairs of each unit.
· Modified the design of the septic system. The previous design included 500-gallon precast concrete
chambers. These were replaced with Cur-tech CTL-12 chambers, which have a shallower profile.
· Swapped the location of Infiltration System #1 and the reserve area to provide greater separation to
between the infiltration and soil absorption systems.
· Modified the grading of the access drive to ensure more effective drainage of stormwater runoff.
· Decreased the overall length of the access drive and moved the dumpster out of the 20-foot buffer to the
residentially zoned properties to the south.
· Added four (4) new trees at intervals of 30 feet, along the southern boundary of the site to comply with the
VCOD buffer requirements.
· Modified site landscaping by replacing invasive species with non-invasives.
· Combined driveways of Units 1 & 2, Units 3 & 4, Units 5 & 6 and Units 7 & 8. This allowed us to increase the
width of the landscaped islands between Units 2 & 3 and Units 6 & 7, in order to provide larger canopy trees
in those locations.
· Added plantings to the proposed Rain Garden.
· Replaced English Yew with Holly throughout the site.
349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 / 508-778-8919
I look forward to presenting them to the Design Review Committee next week. If you have any questions or
comments in the interim, please feel free to reach out at your convenience.
Sincerely,
BSC Group, Inc.
Brian G. Yergatian, P.E., LEED AP
Manager of Civil Engineering, Senior Associate
Engineers
Environmental Scientists
Software Developers
Landscape Architects
Planners
Surveyors
349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 / 508-778-8919
MAY 23, 2024 www.bscgroup.com
Kathy Williams, P.E.
Yarmouth Town Planner
1146 Route 28
South Yarmouth, MA 02664
RE: DRC Application, 811 Route 28
Dear Kathy,
BSC Group, Inc. (BSC) has revised the site plans for the proposed multi-family development at 811 Route 28 in
South Yarmouth. The plans were revised based on the comments that we received from Staff during the Design
Review meeting on May 7, 2024. The following summarizes the plan modifications that have resulted in the current
site plans, revised May 22, 2024:
· Moved the bicycle rack closer to the building.
· Relocated Infiltration System #1 several feet to the east and slightly south to allow more space to relocate
the proposed street trees.
· Moved the proposed trees along Route 28 further away from the street. The trees are now set back a
minimum of 16 feet from the edge of the right-of-way.
· Moved the dumpster 3-4 feet closer to the southern boundary (and into the 20-foot buffer to make it easier to
back out the driveway at the southern end of the building.
· Modified the proposed plantings in the southern buffer to meet the requirements of Section 414.8.9.3.
· Moved the four (4) proposed red maple shade trees several feet closer to the access drive and extended the
length of the two (2) landscaped medians by a distance of 2 feet to reduce pavement area and increase tree
canopy coverage.
· Reduced the number of shrubs around the perimeter of the paved turnaround. These areas have been
replaced with lawn.
I look forward to presenting the Project to the Planning Board at the June 5, 2024 public hearing. If you have any
questions or comments in the interim, please contact me at your convenience.
Sincerely,
BSC Group, Inc.
Brian G. Yergatian, P.E., LEED AP
Manager of Civil Engineering, Senior Associate
MULTI-FAMILY DEVELOPMENT
811 MAIN STREET (ROUTE 28)
SOUTH YARMOUTH, MASSACHUSETTS
MARCH 18, 2024
REVISED: MAY 22, 2024
T-100 TITLE SHEET
G-100 EXISTING CONDITIONS PLAN
C-100 EROSION & SEDIMENT
CONTROL PLAN
C-200 SITE PREPERATION &
DEMOLITION PLAN
C-300 LAYOUT & MATERIALS PLAN
C-400 GRADING & DRAINAGE PLAN
C-500 SEPTIC & UTILITIES PLAN
L-100 PLANTING PLAN
C-600 - 602 DETAILS
CHRISTINA MEGGISON
693 RUSSELLS MILLS ROAD
SOUTH DARTMOUTH, MA 02748
LOCUS
LOCUS MAP
ISSUED FOR PERMITTING
NOT FOR CONSTRUCTION
INDEX OF DRAWINGS
349 Main Street - Route 28
West Yarmouth, Massachusetts
02673
508 778 8919
GOH
W
OH
W
SSSGGGGGGGWWS
S
G
G
G
G
G
S SSGOH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
G
G
G
G
G
PUBLI
C
W
A
Y --
4
0'
WI
D
E
ROUT
E
2
8 OHWOHWOHWWWWWWWWWWOHWOHWOHWOHWGGGGGGGGGIN
PLAN OF LAND
811 ROUTE 28
YARMOUTH
MASSACHUSETTS
(BARNSTABLE COUNTY)
EXISTING CONDITIONS
PLAN
MARCH 18, 2024
LOCUS
G-100
349 Main Street - Route 28
West Yarmouth, Massachusetts
02673
508 778 8919
WWWWWGGGWWPUBLI
C
W
A
Y --
4
0'
WI
D
E
ROUT
E
2
8 WWWWWWWWWISSUED FOR PERMITTING
NOT FOR CONSTRUCTION
C-100
MULTI-FAMILY
RESIDENTIAL
811 ROUTE 28
SOUTH YARMOUTH
MASSACHUSETTS
(BARNSTABLE COUNTY)
EROSION & SEDIMENT
CONTROL PLAN
MARCH 18, 2024
349 Main Street - Route 28
West Yarmouth, Massachusetts
02673
508 778 8919
WWWWWGGGGOH
W
OH
W
OH
WW
WG
G
G
G
G
S SSGOH
W
OH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
OH
W
G
G
G
G
G
GOH
W
OH
W
OH
W
G
G
G
G
G
PUBLI
C
W
A
Y --
4
0'
WI
D
E
ROUT
E
2
8 OHWOHWOHWWWWWWWWWWOHWOHWOHWOHWGGGGGGGGG349 Main Street - Route 28
West Yarmouth, Massachusetts
02673
508 778 8919
ISSUED FOR PERMITTING
NOT FOR CONSTRUCTION
C-200
MULTI-FAMILY
RESIDENTIAL
811 ROUTE 28
SOUTH YARMOUTH
MASSACHUSETTS
(BARNSTABLE COUNTY)
SITE PREPARATION
& DEMOLITION PLAN
MARCH 18, 2024
PUBLI
C
W
A
Y --
4
0'
WI
D
E
ROUT
E
2
8 FIRELANE
ISSUED FOR PERMITTING
NOT FOR CONSTRUCTION
C-300
MULTI-FAMILY
RESIDENTIAL
811 ROUTE 28
SOUTH YARMOUTH
MASSACHUSETTS
(BARNSTABLE COUNTY)
LAYOUT & MATERIALS
PLAN
MARCH 18, 2024
349 Main Street - Route 28
West Yarmouth, Massachusetts
02673
508 778 8919
S SS
PUBLI
C
W
A
Y --
4
0'
WI
D
E
ROUT
E
2
8 RDRDRDRDDDDDDDDDDD
DISSUED FOR PERMITTING
NOT FOR CONSTRUCTION
C-400
MULTI-FAMILY
RESIDENTIAL
811 ROUTE 28
SOUTH YARMOUTH
MASSACHUSETTS
(BARNSTABLE COUNTY)
GRADING & DRAINAGE
PLAN
MARCH 18, 2024
349 Main Street - Route 28
West Yarmouth, Massachusetts
02673
508 778 8919
WWWWWGGGGSSSGGGGGGGWS
S
G
G
G
G
G
S SSGG
G
G
G
G
GG
G
G
G
G
GG
G
G
G
G
GG
G
G
G
G
GG
G
G
G
G
GG
G
G
G
G
GG
G
G
G
G
GG
G
G
G
G
GG
G
G
G
G
GG
G
G
G
G
GG
G
G
G
G
PUBLI
C
W
A
Y --
4
0'
WI
D
E
ROUT
E
2
8 OHWOHWOHWWWWWWWWWWOHWOHWOHWOHWGGGGGGGGGRDRDRDRDWFWW WWFFFFGGG GE
S
SSS
S
SC-500
MULTI-FAMILY
RESIDENTIAL
811 ROUTE 28
SOUTH YARMOUTH
MASSACHUSETTS
(BARNSTABLE COUNTY)
SEPTIC & UTILITIES
PLAN
MARCH 18, 2024
349 Main Street - Route 28
West Yarmouth, Massachusetts
02673
508 778 8919
ISSUED FOR PERMITTING
NOT FOR CONSTRUCTION
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
OH
W
PUBLI
C
W
A
Y --
4
0'
WI
D
E
ROUT
E
2
8 OHWOHWOHWOHWOHWOHWOHWWFWW WWFFFFGGG GE
(3) - QU
(3) - AC
(1) - If
(2) - Id
(6) - Ig
(6) - Ig
(3) - Ca
(3) - Ca
(5) - Ro
SS(10) - Ig
(3) - Ca
(2) - Ir
(2) - Ir
(2) - Ca
(8) - TO
(38) - Sis a
(84) - Car s
(51) - Sis a
(79) - Car m
LAWN
LAWN
LAWN
LAWN
LAWN
LAWN
LAWN
LAWN
LAWN
S
S
S(2) - Id
(2) - Id
(54) - Lir s
(54) - Lir s
(5) - Aa2
(2) - Id
(1) - Re
(2) - Ry
(2) - Ry
(2) - Ry
(1) - AC
R=15'
R=15'
R=15'
R=15'
LAWN
LAWN
LAWN
440 SF
530 SF
530 SF
290 SF
(6) - Is
(1) - Pj
(1) - Pj
(7) - Pj
(4) - Re
(5) - Ig
(1) - Id
(3) - Is
(1) - AA
(1) - AA
(1) - AA
(1) - AA
(5) - Ca
CODE QTY BOTANICAL / COMMON NAME NOTES SIZE
EVERGREEN
TO 8 THUJA OCCIDENTALIS
AMERICAN ARBORVITAE
B & B 6-7` HT
FLOWERING / SMALL TREES
AC 4 AMELANCHIER CANADENSIS
CANADIAN SERVICEBERRY
B & B 7-8` HT.
SHADE TREESAA5 ACER RUBRUM 'AUTUMN FLAME'
AUTUMN FLAME RED MAPLE
B & B 3-3.5" CAL
QU 3 QUERCUS PALUSTRIS
PIN OAK
B & B 3-3.5" CAL
CODE QTY BOTANICAL / COMMON NAME SIZE SIZE
SHRUBS
Aa2 8 ARONIA MELANOCARPA `AUTUMN MAGIC`
AUTUMN MAGIC BLACK CHOKEBERRY
5 GAL
Ca 16 CLETHRA ALNIFOLIA
SUMMERSWEET
5 GAL
Hv 2 HAMAMELIS VIRGINIANA
COMMON WITCH HAZEL
B & B 5-6' HT.
Ig 27 ILEX GLABRA
INKBERRY HOLLY
5 GAL
Ir 4 ILEX VERTICILLATA 'FARROWBPOP'
BERRY POPPINS® WINTERBERRY
5 GAL
If 1 ILEX VERTICILLATA 'FARROWMRP'
MR. POPPINS® WINTERBERRY
3 GAL
Is 9 ILEX X CRENATA 'SOFT TOUCH'
SOFT TOUCH HOLLY
3 GAL
Id 18 ILEX X MESERVEAE 'BLUE PRINCE' & 'BLUE PRINCESS'
BLUE PRINCE AND PRINCESS HOLLY
3-4` HT
Pj 9 PIERIS JAPONICA
JAPANESE PIERIS
5 GAL
Ro 5 RHODODENDRON X `OLGA MEZITT`
OLGA MEZITT PJM RHODODENDRON
3-4` HT
Re 8 RHODODENDRON X 'ENGLISH ROSEUM'
ENGLISH ROSEUM RHODODENDRON
3-4` HT
Ry 6 RHODODENDRON YEDOENSE POUKHANENSE
'COMPACTA'
COMPACT KOREAN AZALEA
24-30" HT.
SYMBOL QTY BOTANICAL / COMMON NAME CONT SIZE SPACING
GROUND COVERS
79 CAREX MORROWII 'ICE DANCE'
ICE DANCE JAPANESE SEDGE 1 GAL 12" o.c.
84 CAREX SIDEROSTICHA 'SNOW CAP'
SNOW CAP BROADLEAF SEDGE 1 GAL 12" o.c.
108 LIRIOPE SPICATA
CREEPING LILYTURF 4" POT 10" o.c.
89 SISYRINCHIUM ANGUSTIFOLIUM 'LUCERNE'
LUCERNE BLUE-EYED GRASS 1 GAL 18" o.c.
PLANT SCHEDULE
ISSUED FOR PERMITTING
NOT FOR CONSTRUCTION
L-100
MULTI-FAMILY
RESIDENTIAL
811 ROUTE 28
SOUTH YARMOUTH
MASSACHUSETTS
(BARNSTABLE COUNTY)
PLANTING PLAN
MARCH 18, 2024
349 Main Street - Route 28
West Yarmouth, Massachusetts
02673
508 778 8919
NOTE:
RKING AREA: 5,205 SF
TREE CANOPY COVERAGE AT PARKING AREA: 1,790 SF, 34%
ISSUED FOR PERMITTING
NOT FOR CONSTRUCTION C-600
MULTI-FAMILY
RESIDENTIAL
811 ROUTE 28
SOUTH YARMOUTH
MASSACHUSETTS
(BARNSTABLE COUNTY)
DETAILS
MARCH 18, 2024
349 Main Street - Route 28
West Yarmouth, Massachusetts
02673
508 778 8919
ISSUED FOR PERMITTING
NOT FOR CONSTRUCTION
12" MIN.
C-601
MULTI-FAMILY
RESIDENTIAL
811 ROUTE 28
SOUTH YARMOUTH
MASSACHUSETTS
(BARNSTABLE COUNTY)
DETAILS
MARCH 18, 2024
349 Main Street - Route 28
West Yarmouth, Massachusetts
02673
508 778 8919
6.0" [152 mm] MIN.
18.5" [470 mm]
6.0" [152 mm] MIN.
39.0" [991 mm]
CENTER TO CENTER33.0" [838 mm]12.0" [305 mm] MIN.
6.0" [152 mm] MIN.12.0' MAX.
COVER DEPTH
CULTEC NO. 410 NON-WOVEN GEOTEXTILE
AROUND STONE. TOP AND SIDES ARE
MANDATORY; BOTTOM PER ENGINEER'S DESIGN
PREFERENCENATURALLY COMPACTED FILL
FINISHED GRADE
1-2 INCH [25-50 mm] WASHED, CRUSHED STONECULTEC HVLV FC-24
FEED CONNECTOR WHERE SPECIFIED
RECHARGER 150XLHD
HEAVY DUTY CHAMBER
PROJECT ENGINEER OF RECORD OR GEOTECHNICAL CONSULTANT IS RESPONSIBLE FOR
ENSURING THAT THE REQUIRED BEARING CAPACITY OF SUB-GRADE SOILS HAS BEEN MET
CULTEC NO. 4800 WOVEN GEOTEXTILE TO BE PLACED
BENEATH INTERNAL MANIFOLD FEATURE AND BENEATH
ALL INLET/OUTLET PIPES (FOR SCOUR PROTECTION)
7.5' [2.29 m] MIN.
CULTEC NO. 4800
WOVEN GEOTEXTILE
PLACED BENEATH
FEED CONNECTORS
10.0' [3.0 m] MIN.
CULTEC NO. 4800
WOVEN GEOTEXTILE
PLACED BENEATH
INLET PIPES
PIPE PER ENGINEER DESIGN.
PIPE TO BE INSERTED 12.0 INCHES [305 mm] MIN. INTO CHAMBER.
MAXIMUM PIPE SIZE:
12.0" [300 mm] HDPE
15.0" [375 mm] PVC
FINISHED GRADE
NATURALLY COMPACTED FILL
CULTEC NO. 410 NON-WOVEN GEOTEXTILE
AROUND STONE. TOP AND SIDES MANDATORY,
BOTTOM PER ENGINEER'S DESIGN PREFERENCE
CULTEC HVLV FC-24 FEED CONNECTOR
WHERE SPECIFIED
CULTEC RECHARGER 150XLHD
HEAVY-DUTY CHAMBER
6.0 INCH [152 mm] MIN. DEPTH OF
1-2 INCH [25-50 mm] WASHED, CRUSHED
STONE ABOVE CHAMBERS
12.0 INCH [305 mm] MIN. WIDTH OF 1-2 INCH
[25-50 mm] WASHED, CRUSHED STONE BORDER
SURROUNDING ALL CHAMBERS
6.0 INCH [152 mm] MIN. DEPTH OF
1-2 INCH [25-50 mm] WASHED, CRUSHED
STONE BELOW CHAMBERS
FINISHED GRADE
6.0" [152 mm] [150mm] MIN.
15.0"
[375mm]
6" [150mm] SDR-35 BELL END
CUT FOR 6" OF INSERTED PIPE
6" [150mm] SDR-35 RISER (LENGTH VARIES)
6" [150mm] PVC SCREW IN CAP
AASHTO HS-25 RATED CAST IRON
FRAME AND SOLID COVER
12" X 6" [300mmX150mm] CULTEC INLINE
DRAIN / CLEAN-OUT BASIN w/ GASKETED
SDR-35 CONNECTION
6.25" [160mm] HOLE TO BE CUT w/ HOLE
SAW CENTERED ON CORRUGATION CREST
NATURALLY COMPACTED FILL
CULTEC NO. 410 NON-WOVEN GEOTEXTILE AROUND STONE.
TOP AND SIDES MANDATORY, BOTTOM PER ENGINEER'S
DESIGN PREFERENCE
CULTEC RECHARGER 360HD
HEAVY-DUTY CHAMBER
CULTEC HVLV FC-48 FEED CONNECTOR
WHERE SPECIFIED
FINISHED GRADE
NATURALLY COMPACTED FILL
PIPE PER ENGINEER DESIGN
PIPE TO BE INSERTED 12.0 INCHES [305mm] MIN. INTO CHAMBER
MAXIMUM PIPE SIZE:
24" [600mm] HDPE
30" [750mm] PVC
6.0 INCH [152mm] MIN. DEPTH OF
1-2 INCH [25-50mm] WASHED, CRUSHED
STONE BENEATH CHAMBERS
12.0 INCH [305mm] MIN. WIDTH OF 1-2 INCH
[25-50mm] WASHED, CRUSHED STONE
BORDER SURROUNDING ALL CHAMBERS
6.0 INCH [152mm] MIN. DEPTH OF
1-2 INCH [25-50mm] WASHED, CRUSHED
STONE BENEATH CHAMBERS
12.0' [3.66m] MIN.
CULTEC NO. 4800
WOVEN GEOTEXTILE
PLACED BENEATH
INLET PIPES 7.5' [2.29m] MIN.
CULTEC NO. 4800
WOVEN GEOTEXTILE
PLACED BENEATH
FEED CONNECTORS
CULTEC RECHARGER 360HD
HEAVY DUTY CHAMBER
CULTEC HVLV FC-48 FEED CONNECTOR
WHERE SPECIFIED
1-2 INCH [25-50mm] WASHED, CRUSHED STONE
SURROUNDING CHAMBERS FINISHED GRADE
CULTEC NO. 410 NON-WOVEN GEOTEXTILE AROUND
STONE. TOP AND SIDES MANDATORY, BOTTOM PER
ENGINEER'S DESIGN PREFERENCE
NATURALLY COMPACTED FILL
6.0" [153 mm] [152mm] MIN.
36.0" [915 mm] [914mm]
12.0" [304 mm] [305mm] MIN.
6.0" [153 mm] [152mm] MIN.
12.0' [3.66m] MAX.
COVER DEPTH
60.0" [1524 mm]
[1525mm]
69.0" [1752 mm] [1753mm] MIN.
CENTER TO CENTER12.0" [306 mm] [305mm] MIN.
PROJECT ENGINEER OF RECORD OR GEOTECHNICAL CONSULTANT IS RESPONSIBLE FOR
ENSURING THAT THE REQUIRED BEARING CAPACITY OF SUB-GRADE SOILS HAS BEEN MET
CULTEC NO. 4800 WOVEN GEOTEXTILE TO BE PLACED BENEATH INTERNAL MANIFOLD
FEATURE AND BENEATH ALL INLET/OUTLET PIPES (FOR SCOUR PROTECTION)
9.0" [228 mm] [229mm] MIN.
NOTES:
1. THE CHAMBERS SHALL BE DESIGNED AND TESTED IN ACCORDANCE WITH ASTM F2787 "STANDARD PRACTICE FOR STRUCTURAL DESIGN OF THERMOPLASTIC CORRUGATED WALL STORMWATER
COLLECTION CHAMBERS." THE LOAD CONFIGURATION SHALL INCLUDE:
1.a. INSTANTANEOUS AASHTO DESIGN TRUCK LIVE LOAD AT MINIMUM COVER
1.b. MAXIMUM PERMANENT (50-YEAR) COVER LOAD
1.c. 1-WEEK PARKED AASHTO DESIGN TRUCK LOAD
2. THE CHAMBERS SHALL MEET THE REQUIREMENTS OF ASTM F3430-20 "STANDARD SPECIFICATION FOR CELLULAR POLYPROPYLENE (PP) CORRUGATED WALL STORMWATER COLLECTION CHAMBERS"
3. THE INSTALLED CHAMBER SYSTEM SHALL PROVIDE RESISTANCE TO THE LOADS AND LOAD FACTORS AS DEFINED IN THE AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS SECTION 12.12, WHEN INSTALLED
ACCORDING TO CULTEC'S RECOMMENDED INSTALLATION INSTRUCTIONS. THE STRUCTURAL DESIGN OF THE CHAMBERS SHALL INCLUDE THE FOLLOWING:
3.a. THE CREEP MODULUS SHALL BE 50-YEAR AS SPECIFIED IN ASTM F3430
3.b. THE MINIMUM SAFETY FACTOR FOR LIVE LOADS SHALL BE 1.75
3.c. THE MINIMUM SAFETY FACTOR FOR DEAD LOADS SHALL BE 1.95
FINISHED GRADE
6.0" [150 mm] SDR-35 / SCH 40 PVC
(INSERTED 8.0" [203 mm] INTO CHAMBER)
TRIM CHAMBER INSPECTION PORT KNOCK-OUT TO
MATCH O.D. OF 6.0" [150 mm] INSPECTION PORT PIPE
6.0" [150 mm] SDR-35 / SCH. 40 PVC COUPLING
6.0" [150 mm] SDR-35 / SCH. 40 PVC RISER
6.0" [150 mm] SDR-35 / SCH. 40 PVC ENDCAP
CLEAN-OUT ADAPTER W/ SCREW-IN CAP
ISSUED FOR PERMITTING
NOT FOR CONSTRUCTION C-602
MULTI-FAMILY
RESIDENTIAL
811 ROUTE 28
SOUTH YARMOUTH
MASSACHUSETTS
(BARNSTABLE COUNTY)
DETAILS
MARCH 18, 2024
349 Main Street - Route 28
West Yarmouth, Massachusetts
02673
508 778 8919