HomeMy WebLinkAboutCOC request 7.18.2024 Shorefront Consulting
Professional Services on Land or At Sea
290 Center St., Dennis Port, MA 02639 www.shorefrontconsulting.com
508-280-8046 shorefrontconsulting@gmail.com
Yarmouth Conservation Commission July 17, 2024
Attn: Brittany DiRienzo
1146 Route 28
South Yarmouth, MA 02664-4492
By hand delivery and email
Re: Request for Certificate of Compliance and Statement of Compliance
Proposed Bulkhead and Pier Replacement and Landscaping
Jason Lilly
143 Mayflower Terrace
South Yarmouth, MA 02664
Map 120, Parcel 5
On behalf of my client Jason Lilly, please accept this request for a Certificate of Compliance for the above
referenced project. A site inspection was performed by Shorefront Consulting on July 17, 2024, with the
results communicated to Existing Grade, the P.E. for the project. The proposed dock reconstruction and stair
reconstruction work is complete, and the plantings have been installed and are stabilized. The buffer strip was
measured and found to be in compliance with the order of conditions, special condition #16. The float stops
were observed and photographed. An as-built plan was not required as part of the order. In addition, the
bulkhead work was not performed. The order has since expired and the applicant would like to close it out.
Photographs are included in this request. The project was monitored and inspected by Shorefront Consulting
during the 2013 construction process. The dock and stairs were re-constructed according to the permit, with no
modifications or deviations noted. There are no deviations from the plan observed during the time of
inspection.
Therefore, the project has been completed in accordance with the Order of Conditions, and all Special Conditions
contained in SE-83-1961 issued on 4/2/2013. Attached please find Yarmouth form WPA-8A Request for
Certificate of Compliance, photos of the completed project, and a check for $75 made payable to the Town of
Yarmouth. The work results have been reviewed by Existing Grade, and below is their certification of this request
letter.
Please include this request in your next public hearing. The original Certificate of Compliance should be mailed
to Shorefront Consulting for recording. If there are any questions or concerns regarding this request, please
contact me as soon as possible.
Sincerely,
Mark Burgess
Shorefront Consulting
Enclosures: As Stated Ed Gless, P.E., Existing Grade
cc: Jason Lilly (Applicant)
wpaform8a.doc •• rev. 5/29/14 Page 1 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
SE83-1961
Provided by DEP
A. Project Information
Important:
When filling out
forms on the
computer, use
only the tab
key to move
your cursor -
do not use the
return key.
1. This request is being made by:
Jason Lilly
Name
P.O. Box 75
Mailing Address
South Dennis
City/Town
MA
State
02660
Zip Code
774-836-4375
Phone Number
2. This request is in reference to work regulated by a final Order of Conditions issued to:
Jason Lilly
Applicant
4/2/2013
Dated
SE83-1961
DEP File Number
Upon completion
of the work
authorized in
an Order of
Conditions, the
property owner
must request a
Certificate of
Compliance
from the issuing
authority stating
that the work or
portion of the
work has been
satisfactorily
completed.
3. The project site is located at:
143 Mayflower Terrace
Street Address
South Yarmouth
City/Town
Map 120
Assessors Map/Plat Number
Parcel 5
Parcel/Lot Number
4. The final Order of Conditions was recorded at the Registry of Deeds for:
Jason Lilly
Property Owner (if different)
Barnstable
County
27291
Book
275
Page
Certificate (if registered land)
5. This request is for certification that (check one):
the work regulated by the above-referenced Order of Conditions has been satisfactorily completed.
the following portions of the work regulated by the above-referenced Order of Conditions have
been satisfactorily completed (use additional paper if necessary).
The dock and stair reconstruction and plantings have been completed. The bulkhead
reconstruction was not performed.
the above-referenced Order of Conditions has lapsed and is therefore no longer valid, and the
work regulated by it was never started.
wpaform8a.doc •• rev. 5/29/14 Page 2 of 2
Massachusetts Department of Environmental Protection
Bureau of Resource Protection - Wetlands
WPA Form 8A – Request for Certificate of Compliance
Massachusetts Wetlands Protection Act M.G.L. c. 131, §40
Town of Yarmouth Wetland By-law, Chapter 143
DEP File Number:
SE83-1961
Provided by DEP
A. Project Information (cont.)
6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain
an approval of any plans stamped by a registered professional engineer, architect, landscape
architect, or land surveyor?
Yes If yes, attach a written statement by such a professional certifying substantial
compliance with the plans and describing what deviation, if any, exists from the plans
approved in the Order.
No
B. Submittal Requirements
Requests for Certificates of Compliance should be directed to the issuing authority that issued the final
Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit
this request to that Commission. If the project was issued a Superseding Order of Conditions or was the
subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional
Office (see http://www.mass.gov/eea/agencies/massdep/about/contacts/find-the-massdep-regional-office-
for-your-city-or-town.html).
143 Mayflower Terrance; Lilly COC pictures taken 7/17/24 showing existing mitigation and landscape plantings
Buffer strip looking south Buffer strip looking north
143 Mayflower Terrance; Lilly COC pictures taken 7/17/24 showing existing mitigation and landscape plantings
Existing mitigation and landscape plantings; back yard
Existing access steps and dock
Existing pier, ramp, and float
143 Mayflower Terrance; Lilly COC pictures taken 7/17/24 showing existing mitigation and landscape plantings
Existing mitigation and landscape plantings; back yard
Existing float stops installed
Existing shorefront; bulkhead not replaced