Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
COC request 7.19.2024
CAPE COD ENGINEERING, I.NC. Robert M. Perry, P.E. P.O. Box 1517 East Dennis, MA 02641 Tel 508-385-1445 /Fax 508-385-1446 bobperry(a�capecod.net July 19, 2024 Town of Yarmouth Conservation Commission 1146 Route 28 South Yarmouth, MA 02664 RE: 7 Loon Lane - Yarmouth; SE 83-1154 - Certificate of Compliance To the Conservation Commission, Attached please find Form 8A and a check in the amount of $75 for a Request for Certificate of Compliance for SE 83-1154 issued in 1991 for driveway work, a garage, and a small deck addition. The consultant who administered the plan and permitting activities in 1991 is no longer with us and Sweetser Engineering is no longer in business. Cape Cod Engineering, Inc. has reviewed the file materials, the plan and made a site visit to inspect the project components. The ground condition is a well -developed mature, informal native fescue grass with no sign of erosion. After 33 years any roof runoff drywells that may have existed are no longer in use and the building downspouts are not causing any negative effects. The building is on a level crest and runoff dissipates well into the surrounding vegetation. Based on my knowledge, information, and belief, a suitable inspection of the site, the building and related permit plans, the completed project warrants issuance of a Certificate of Compliance. Thank you for your assistance and cooperation. Sincerely, Cape Cod Engineer' ,Inc. Robert M. , PE Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. return /-V Upon completion of the work authorized in an Order of Conditions, the property owner must request a Certificate of Compliance from the issuing authority stating that the work or portion of the work has been satisfactorily completed. Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands DEP Fi3© Number: WPA Form 8A —Request for Certificate of Compliance SE 83- 154 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information 1. This request is being made by: Marianne K Batgos & George Vozeolas Name 507 Doral Circle Mailing Address Berwyn PA 19312 City/Town State Zip Code 610-420-3897 mkbatgos@gmail.com Phone Number 2. This request is in reference to work regulated by a final order of Conditions issued to: Eletherios Vozeolas Applicant 11 /25/91 Dated 3. The project site is located at: 7 Loon Lane Street Address 49 Assessors Map/Plat Number SE 83-1154 DEP File Number West Yarmouth City/Town 233 Parcel/Lot Number 4. The final order of Conditions was recorded at the registry of Deeds for: Property Owner (if different) Barnstable County Certificate (if registered land) 5. This request is for certification that (check one): 8243 Book 246 Page Z the work regulated by the above -referenced Order of Conditions has been satisfactorily completed. ❑ the following portions of the work regulated by the above -referenced Order of Conditions have been satisfactorily completed (use additional paper if necessary). ❑ the above -referenced Order of Conditions has lapsed and is therefore no longer valid, and the work regulated by it was never started. wpaform$a.doc -- rev. 5/29114 page 1 of 2 Massachusetts Department of Environmental Protection DEP File Number: Bureau of Resource Protection - Wetlands ` � WPA Form 8A — Request for Certificate of Compliance SE 83-1154 Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by DEP Town of Yarmouth Wetland By-law, Chapter 143 A. Project Information (cont.) 6. Did the Order of Conditions for this project, or the portion of the project subject to this request, contain an approval of any plans stamped by a registered professional engineer, architect, landscape architect, or land surveyor? Yes If yes, attach a written statement by such a professional certifying substantial compliance with the plans and describing what deviation, if any, exists from the plans approved in the Order. ow B. Submittal Requirements Requests for Certificates of Compliance should be directed to the issuing authority that issued the final Order of Conditions (OOC). If the project received an OOC from the Conservation Commission, submit this request to that Commission. If the project was issued a Superseding Order of Conditions or was the subject of an Adjudicatory Hearing Final Decision, submit this request to the appropriate DEP Regional Office (see httl2://www.mass.gov/eea/a-qencies/massdep/about/contacts/find-the-massclep-regional-office- for-your-city-or-town.html). wpaform8a.doc -- rev. 5/29/14 Page 2 of 2