HomeMy WebLinkAbout24-A093 76 Strawberry Lane ApprovedTOWN OF YARMOUTH` RECEIVED
9 x 1146 ROUTE 28, SOUTH YARMOUTH, MA 026644451 1 J U N 2 4 2024
Telephone (508) 398-2231 Ext 1292-Fax (508) 398-0836 f
OLD KING'S HIGHWAY HISTORIC DISTRICT CO IM II
ipRHOUTH SOWN CLERK RE APPLICATION FOR
JUL 22'24 AH9:38 CERTIFICATE OF APPROPRIATENESS
Application is hereby made for issuance of a Certificate of Appropriateness under Section 6 of Chapter 470, Acts of 1973 as
amended, for proposed work as described beiow & on plans, draw,ngs, photographs. & other supplemental info accompanying this
application. PLEASE SUBMIT 4 COVIe5 OF SPEC SHEET(S), ELEVATIONS, PHOTOS, & SUPPLEMENTAL INFORMATION.
Check All Categories That Apply: Indicate type of Building: _ Commercial X Residential
1) Exterior Building Construction: ,New Building Addition _Alterations Reroof X Garage
Shed Solar Panels X Other: Storm Door
2) Exterior Painting: Siding Shutters Doors _Trim Other:
3) Signs/Billboards: New Sign Change to Existing Sign
4) Miscellaneous Structures: X Fence Wall Flagpole Pool Other:
Please type or print legibly:
Address of proposed work: 76 Strawberry Lane, Yarmouth Port Map/Lot #
11417
Owner(s)- Humberto Cordero and Heather McElroy Phone #: 508-367-4113
All applications must be submitted by owner or accompanied by letter from owner approving submittal of application.
Mailing address: 76 Strawberry Lane,.Yarmouth Port Yearbuilt: 1942
Email: heatherleemcelroy@gmail.com Preferred notifcation method: Phone X Email
Agenticoniractor:
Mailing Address:
Phone #:
Email: Preferred notification method: Phone Email
Description of Proposed Work:
Replace overhead garage doors with hinged 4" bead -board doors: paint to match front door in Benjamin Moore Kensington Green
(previously approved by OKH committee). Drawing photo simulation and paint chips included.
Replace picket fence along front of house with split rail fence along entire road frontage, natural finish, no paint (site plan drawing included)
Replace front storm door with Anders aluminum storm door, in black to match window sash (brochure copy included).
Signed (Owner or agent): 'Ve4irlier 7alcEli-oy Date: Jrne 24, 202.4
> Owner/contractortagent is aware that a permit is required from the Building Department. (Check other departments, also.)
v If application is approved, approval is subject to a 10-day appeal period required by the Act
> This certificate is good for one year from approval date or upon date of expiration of Building Permit, whichever dale shall be later
All new construction will be subject to inspection by OKH. OKH-approved plans MUST be available on -site for framing & final inspections
Rcvd Date: (Of 2,11A/
Amount AIA
Cash/CK #: Nt
Rcvd by: L51
45 Days: 71-112
Date Signed:
Approved Approved with Modifications Denied
Reason for Denial:
Signed: rt
r
I Jul-
YAHMUi. I H
OLD KIN�:�
APPLICATION #:
TOWN OF YARMOUTH
OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE
1146 ROUTE 28, SOUTH YARMOUTH, MASSACHUSETTS 02664-4451
Telephone (508) 398-2231 Ext.1292 Fax (508) 398-0836
STATEMENT OF UNDERSTANDING
CHANGES TO AN OLD KING'S HIGHWAY APPROVED PLAN
As property owner/contractor/agent for construction at -110 SAIIVZ W�41� Lloly�
Map/Lot 1 L47 CIA # 4, 3 Approval Date:
I certify that I understand the following requirements regarding any changes that may
be required for this project:
In accordance with paragraph 2(a) of section 1.03(General Procedures) of the OKH 972
CMR Rules and Regulations: Only minor changes may be approved by the Committee
without the filing of a new application and a new hearing. Minor changes include
alterations that can be done without a detrimental impact on the overall appearance of
the project such as altering a single window or door change or a minor change of
colors. All minor changes by amendment will require the local Committee's or its
designee's approval.
All changes to previously OKH approved plans require notification to and approval
from the local OKH Committee. Change requests must be submitted to the Committee
in writing on the appropriate request form, which may be obtained from the OKH office.
All change approvals must be obtained before incorporating the change into the
project.
If the change has been implemented prior to receipt of OKH approval, a Minor Change
approval or Certificate of Appropriateness application for the revised plans is still
required and will result in a doubled filing fee for the appropriate category of work.
Failure to comply with the above statements will result in the Building Department
issuing a stop -work order or delaying the issuance of an Occupancy Permit or final
inspection approval.
I have read and understand the above statements.
Date: OV Signed:
"Wm
�- (Owner) ntractor/Agent)
APPROVED
Signed:
� UL 2 2 2424
(Chairman, Old King's Highway Committee)
�ARMOUI K,,,.dv
Updated M112024
GENERAL SPECIFICATION SHEET
RECEIVED
.III'' 9 .,1 )"i-),A
FOUNDATION: Material: Exposure (N toowl NG'S l"
CHIMNEY: Material/Color: GUTTERS: Material/Color:
ROOF: Material: Pitch (7/12 min) Height to Ridge: Color:
SIDING: Material/Style: Front:
Sides/Rear: COLOR CHIPS
Color: Front:
Sides/Rear:
TRIM: All windows & doors to be trimmed with:
1x 4 1 x5 (Circle one.)
Material:
Color:
DOORS: Qty: Material:
Color:
Style/Size (if not listed/shown on elevations):
STORM DOORS: Qty: 1 Material: Aluminum
Color: Black
GARAGE DOORS: Qty: 2 MatT WOOD
Style: Beadboard Color: Kensington Gm
WINDOWS: !side:: Front: Left: Right:
Rear: Color:
Manufacturer/Series:
Material:
Grilles (Required): Pattern (6/6, 211, etc.) Grille Type: True Divided Lite:
Snap -In: Between Glass: Permanently
Applied: Exterior Interior
STORM WINDOWS: Qty: Material:
Color:
SHUTTERS: Mat'I: Style: Paneled
Louvered Color:
SKYLIGHTS: Qty: Fixed Vented
Size Color:
DECK: Size: Decking Mat'I: Color: APPROVED
Railing Mat'I: Style: Color : JUL 2 2 2024
WALLS/FENCES* (Max 6' height): Height: 3'.0" MatT CEDAR f
Style: PICKET Color: UNFINISHED I+ (AAMOUTH
ty OLD K'NG'S HIGHWAY
(Show running footage & location on plot plan.) *Finished side of fence must face out from fence in a
UTILITY METERSIHVAC UNITS: Location: Screening:
LIGHTS: Qty: Style: Color:
Location(s):
LIGHT POSTS: Qty: _
Location(s):
Additional information:
Material:
Color:
2-General '
APPLICATION #:Vq-A" r3
V"� TOWN OF YARMOUTH
0 1146 ROUTE 28, SOUTH YARNIOUl'H, 1NIASSACHUSETTS 02664-4451
Telephone (508) 398.2231 Ext. 1292 Fax (508) 398 0836
-�-~' OLD KING'S HIGHWAY HISTORIC DISTRICT CONINUTTEE
45-DAY TIMEFRAME
WAIVER
Application #-
Project Address: 76 Strawberry Lane, Yarmouth Port
Application Received Date: June 25, 2024
45 Day Decision Deadline: T" 12Y
REca vED
JUN 2 5 2024
r+n,v�vu f n
I/We, the undersigned owner, contractor, or agent, do hereby waive the
45-day timeframe for a determination on our application for a Certificate
of Appropriateness/Demolition/Exemption by the Old King's Highway
Historic District Committee for the following project:
�j irto eu- 1�icu- emu. ► �pti��- rz� + avxy-
3' feel eUl'- .5-
Date: _June 25, 2024 Signed: _Meaaer maky
Owner
Heather McElroy
Owner
Contractor/Agent
APPROVE®
JUL 2 2 2024
�AAMOU TH 22
0LQ KING'S HIGHWAY f
qq1M3
TOWN OF YARMOUTH
OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE
ABUTTERS' LIST
Applicant's (Owner) Name: yVu ? 'i��lMGn_b,
Property Address/Location:
Hearing Date: '71221,2q
Notices must be sent to the applicant and abutters (including owners of land on any
public or private street or way) whose property directly abuts or is across the street from
the applicant. The OKH Office will send out notices using the addresses as they appear
on the most recent applicable tax list.
Note: Instructions for obtaining the abutters Map and Lot numbers can be found on the Old King's
Highway Department page on the Town website: www.yarmouth.ma us
Applicant Information:
Abutter Information:
FjCFjVF
JUN 2 4 2024
YAI-IVIOUIi
OLD KINGS HIGHWAY
i� FtOV E
jU,,_ 2 2 2024
AHIU10�1I h
pLD KINGS
8.2018
Map Number
Lot Number
i ;Q
'i"- 1.
4�3 1
I L4
gyy3
013
153.1
lv105-7
r2
ql
153
Application #: �q_A M3
1141 61 r
BUTLER CHARLES B Please use this signature to certify this list of properties
BUTLER MARILYN S directly abutting and across the street from the parcel located at:
86 STRAWBERRY LN 76 Strawberry Ln., Yarmouth Port, MA 02675
YARMOUTH PORT, MA 02675 Assessors P4ap_114, Lot 7 ,
1221 84.1.11 1 1 Andy MacWdo, Director of Assessing
PERERA LAWRENCE T
P O BOX 238
YARMOUTH PORT, MA 02675
1221 911 ! 1
HISTORICAL SOCIETY OF OLD YARM
PO BOX 11
YARMOUTH PORT, MA 02675-0011
1231 153.11 1 r � �a 1 C V
TOWN OF YARMOUTH RFr _V
LAND BANK PURCHASE
SOUTH Y ARMOUTH, MA 02664 jut 2024
I Hrilviv+1 I r: .. .
�^z
APPROVED
.Il..! 2 2 2024
NHMOiIH
4011- �
2
Lr, , a
L!1
N
4
0 1�«
c
3r
Ln
� ry
�i
jO
N
fV
N
r-4
O
M
n y^,
c a
o
Si
n
u
U
K
1y
3
17
y
"
�
C
M Z
U
Z �
RECFIVF—D
JUN 2 4 2024
-(ARNIC)UTFi
I'APPROVFol
JUL 2 2 2024
E
rARMOu r h
OZb KIN 'S H! ;HWAY
g{,A-M3
NA
!r*.W,+;ow}k
�d,I�rar�M
v`
�:�"•%- .. .�� '" :1 �' �� i , : j•..,s �" � - ''-'��' �++ e'� ar.•...�� sir � ' � ,,� '.:.
i�� � � Aim ,r .� l�� ff' �* �.' ' • ��'wx`�. , . �` �:�''�,�,�,# �� � : t � * '�'+' �i�t � �`.i-
r �"!�•.
� 4 0
76 Strawberry Lane
4 4
Aft-
tz,
%.A d
y it
OL
41
:ZIA lt'jr
PYFg
..............
Lv
J
RECEIVED
MAY 0 6 2024
Wp-P-R-0-V-E-6'j
*ni 0 KING`$
VENTILATION OPERATION
Ow bmnvattve Quick Change System maids you to go For advanced operation, this door irrchrdes our new
tram fu l venti3alm with our Spk*Lo& Insect Screen SmwthCantrol Phu Close System- The built-in dual
to tul glass in less than a minute with a smrple flip at closer system allows for more cawastenl 1ak-F and a
the handy wrwother close moban. It also has an easy --use
holden feature and simple close speed adjustazent.
• CONTROL+ TN
• 50% stronger than standard dual closers
• Cornarercial-grade steel closer arm
. More consistent latch
Easy to use hold -open feature
a l • sin�le close speed adjustrnent
Ftj
coy We���P7r�
JUN 2 4 20?�� 1
I Hr1YYlVV ++ ax�pk�doar cbsurcr�bsd etc Hai :a•x*x
OLD KING'S HIGHWAY
RECFIVFl
IMAY 0 6 20''4
r rsnrrix„r5,r i
SECURITY OI-D K1NG'S HIG
Built-in tined deadbolt tar added securdy
Choose laminated glass for added security Doors with
lamnated glass include a 3-point lack burs#. into the toq
muddle and bottom of the frame and 1kites-resistant
laminated glass.
HARDWARE OPTIONS'
AWAT=4M ft�*.
end HcA,
e3cros6.a Faa,choali r
. nlaece�"
v�seaz
■
.- E
erg~ aU-rva
ar,s,m )"tM
mhxdef
Rold GAP BLDC -
TRanureaaeAL
erer`
N
■
PFjuE1D
mrat*ea
�,
Vq!— is,
BMW
-,s„ 9. 9. 2024
COLOR OPTIONS
■
wfft
NONE
a.
M=k
e:NNW=
GLASS OPTIONS
Clear Glass
Low-E Clear Glass
• isulating.Glass >
• Lau-E Insulating Glass
• Laminated
11
RFCFlVF[)
JUN 2 4 2024
OLD KINGS HIGHWAY
PERFORMANCE
Thick ahuni ium frame (I W) with recnlorced
corners helps the door stay square over time f
lare-Usttng smooth operation -
Premium double -layer weathessti7p provides
&TwthCOntrd Plus- close system perliormed
bettor in ward dtnbiEty dreg.
INSTALLATION
T—PNSTSTALL J00
See page 16 for c
!R
sos+a�s�.�ea�mw
M