Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AM 5 LOT 3 Date of Subdivision Approval Street 8 2- C'L .� r. Zone of Contribution: In Out )o Village . , -_7Commercial Residential Owner: er,e,l c Jl' ��q /_ Installer /3 /� _ Builder: Engineer ,//7 �a 4 /rye 7 4--,j13 N/A YES NO 1. Required number of copies received. 2. Date of soils exam and percolation test not older than 2 years. 3. 4 feet of naturally occurring pervious material, above water table(new construction) 4. Foundation 2 feet above high point of fronting road for new construction. 5. Water availability letter from Water Department for new construction. ,/ 6. Benchmark indicated and shown -NGVD if near wetlands. 1./ 7. Building sewer does not exit center of house. 8. Septic tank a minimum of 10 feet from house and deck. L/ 9. Leaching a minimum of 20 feet from house and 10 feet from deck. ✓' 10. Leaching a minimum of 100 feet from wetlands. 11. Leaching a minimum of 150 feet from drinking wells/25 feet from irrigation wells. t.l 12. System meets all other setback requirements. it 13. Uses adjustment for maximum high groundwater. 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. t/ 15. System not in top or subsoil or 5 foot removal. 16. Proposed contours are suitable. 7/ 17. System meets slope requirements - min. 1/8", 1/4" preferred. 18. System meets breakout requirements- peastone elevation carried out 15 feet minimum. / 19. Specified tee sizes are proper. gas baffle on outlet tee. o/ 29. Sewage flow under 10,000 grid for parcel. _ 21. No garbage disposal. 22. System adequately sized for its intended use. )l 23. Minimum 6" stone or mechanically compacted below the tank and d-box. 24. Manhole covers within 6" of grade - septic tank and pump chamber. 25. Electrical permit for pump chamber. :l 26. Pump system - 2" line, weep hole, check valve, sanitary in d-box, alarm on separate circuit. 27. Septic tank and pump chamber to be Factory waterproofed. '/ 28. Vent provided if leaching below 3 feet or under driveway or parking, 29. Engineer to inspect and certify : a. clay removal L./' b. wall construction schedule c. commercial system 30. Engineer and Land Surveyor stamp and signature. IZ 31. H2O loading when system subiect to vehicular traffic. L/' 32. Title V application and fee signed by a licensed installer, LZ 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31, 1986 - Nitrate Loading, 35. Subdivided prior to April 7, 1989 - Phosphorus Zone 300'. Plan reviewed by: i • • a