Loading...
HomeMy WebLinkAboutEngineer PlanGENERAL NOTES: A.) NEITHER DRIVEWAYS NOR PARKING AREAS ARE ALLOWED OVER SEPTIC SYSTEM UNLESS H-20 COMPONENTS ARE USED. B.) THE DESIGNER WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UNLESS CONSTRUCTED AS SHOWN. ANY CHANGES SHALL BE APPROVED IN WRITING. C.) CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. CONSTRUCTION NOTES: 1.) ALL CONSTRUCTION SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE, TITLE 5, AND THE REQUIREMENTS OFTHE LOCAL BOARD OF HEALTH. 2.) SEPTIC TANK(S), GREASE TRAP(S), DOSING CHAMBER(S) AND DISTRIBUTION BOX(ES) SHALL BE SET ON A LEVELSTABLE BASE WHICH HAS BEEN MECHANICALLY COMPACTED, OR ON A 6 INCH CRUSHED STONE BASE. 3.) SEPTIC TANK(S) SHALL MEET ASTM STANDARD C1127-93 AND SHALL HAVE AT LEAST THREE 20" DIAMETER MANHOLES. THE MINIMUM DEPTH FROM THE BOT- TOM OF THE SEPTIC TANK TO THE FLOW LINE SHALL BE 48". 4.) SCHEDULE 40 PVC INLET AND OUTLET TEES SHALL EXTEND A MINIMUM OF 6" ABOVE THE FLOW LINE OF THE SEPTICTANKAND SHALL BE INSTALLED ON THE CENTERLINE OF THE TANK DIRECTLY UNDER THE CLEANOUT MANHOLE. 5.) RAISE COVERS OF THE SEPTIC TANK AND DISTRIBUTION BOX WITH PRECAST CONCRETE WATER TIGHT RISERS OVER INLET AND OUTLET TEES TO WITHIN 6" OF FINISH GRADE, OR AS APPROVED BY THE LOCAL BOARD OF HEALTH AGENT. 6.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT. PIPE SHALL BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN 1%. 7.) DISTRIBUTION LINES FOR SOIL ABSORPTION SYSTEM (AS REQUIRED) SHALL BE 4" DIAMETER SCHEDULE 40PVC LAID AT0.005FT/FT. LINE SHALL BE CAPPED AT END OR AS NOTED. 8.) OUTLET PIPES FROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOR AT LEAST 2' BEFORE PITCHING TO SOILABSORPTION SYSTEM. WATERTEST DISTRIBUTION BOX TO ENSURE EVEN DISTRIBUTION. 9.) DISTRIBUTION BOX SHALL HAVE A MINIMUM SUMP OF 6" MEASURED BELOW THE OUTLET INVERT. 10.) BASE AGGREGATE FOR THE LEACHING FACILITY SHALL CONSIST OF 3/4" TO 1-1/2" DOUBLE WASHED NATIVE STONE FREE OF IRON, FINES AND DUST AND SHALL BE INSTALLED BELOW THE CROWN OF THE DISTRIBUTION LINE TO THE BOTTOM OF THE SOIL ABSORPTION SYSTEM. BASE AGGREGATE SHALL BE COVERED WITH A LAYER OF FILTER FABRIC OR APPROVED EQUIVALENT. 11.) VENT SOIL ABSORPTION SYSTEM WHEN DISTRIBUTION LINES EXCEED 50 FEET; WHEN LOCATED EITHER IN WHOLE OR IN PART UNDER DRIVEWAYS, PARKING AREAS, TURNING AREAS OR OTHER IMPERVIOUS MATERIAL; OR WHEN PRESSURE DOSED. 12.) SOIL ABSORPTION SYSTEM SHALL BE COVERED WITH A MINIMUM OF 9" OF CLEAN MEDIUM SAND (EXCLUDING TOPSOIL). 13.) FINISH GRADE SHALL BE A MAXIMUM OF 36" OVER THE TOP OF ALL SYSTEM COMPONENTS, INCLUDING THESEPTiCTANK, DISTRIBUTION BOX, DOSING CHAMBER AND SOIL ABSORPTION SYSTEM. SEPTICTANKSSHALL HAVE AMINIMUM COVER OF9". 14.) FROM THE DATE OF INSTALLATION OF THE SOILABSORPTION SYSTEM UNTIL RECEIPT OF A CERTIFICATE OF COMPLIANCE, THE PERIMETER OF THE SOIL ABSORPTION SYSTEM SHALL BE STAKED AND FLAGGED TO PREVENT THE USE OF SUCH AREA FOR ALL ACTIVITIES THAT MIGHT DAMAGE THE SYSTEM. SAS DETAIL: SCALE 1" = 10' D-Box SO L TEST LOGS: TEST HOLE 1: EL=28.7± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-16 Ap LOAMY FINE SAND 10YR 212 NONE 16-36 B LOAMY FINE SAND 10YR 5/6 NONE 36-144 CI I FINE SAND lOYR 7/3 1 NONE TEST HOLE 2: EL--28.7± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-15 Ap LOAMY FINE SAND 10YR 2/2 NONE 15-34 B LOAMY FINE SAND 10YR 5/6 NONE 34-145 CI FINE SAND 10YR 7/3 NONE TEST HOLE 3: EL=29.2± DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING OTHER 0-18 A LOAMY FINE SAND 10YR 2/2 NONE 18-38 8 LOAMY FINE SAND 10YR 5/6 NONE 38-125 CI FINE SAND 10YR 7/3 NONE TEST HOLE 4: EL=29.2± SYSTEM DESIGN CALCULATIONS: SEWAGE DESIGN FLOWi 4 BEDROOM DWELLING @ 110 GPD = 440 GPD LEACHING CAPACITY REQUIREM (MAX.)11 =440 GPD REQUIRED SEPTIC TANK CAPACITY REQUIRED DAILY FLOW =440GPD @ =880GAL.REQUIRED SEPTICTANK CAPACITY PROVIDEM 1 GALLON 1 LLOWED) LEACHING CAPACITY PROVIDEDi ONE (1) 33.5' X 12.83' X 2.0' LEACHING CHAMBER CAN LEACH: Vt=[(33.5 X 12.83) + (33.5 X 2.0)2 + (12.83 X 2.0)2) X 0.74 GPD/SF = 455.10 GPD 455 GPD > 440 GPD REQUIRED NOTE: A GARBAGE DISPOSAL IS NOT PERMITTED WITH THIS DESIGN. INSTALU ONE (1)- 1500 GALLON SEPTICTANK ONE (1)- 3 OUTLET DISTRIBUTION BOX (H-20 RATED) THREE (3)- 500 GALLON LEACH CHAMBERS WITH 4' OF NATIVE STONE ALL AROUND PERC 62" 15 min DATE OF TESTING: 09/13/23 PERC @ 62" 15 min PERCOLATION RATE: LESS THAN 5 MIN/INCH IN "C" LAYERS. WITNESSED BY: MATT FARRELL, EIT, J.M. O'REILLY & ASSOCIATES, INC. OTHER BARRY LEWIS, AGENT, YARMOUTH HEALTH DEPARTMENT NO WATER ENCOUNTERED US OA RA 0 S 0 DEPTH FROM SURFACE (INCHES) SOIL HORIZON SOIL TEXTURE (USDA) SOIL COLOR (MUNSELL) SOIL MOTTLING 0-22 A LOAMY FINE SAND 10YR 22-40 B LOAMY FINE SAND 10YR 40-127 CI FINESAND 10YR M m W N Chambers Stone 33.5' INSPECTION NOTE: PRIORTO FINAL INSPECTION BY THE ENGINEER, SYSTEM NEEDS TO BE COMPLETE INCLUDING BUILDUP FOR COVERS. FLOW PROFILE: NOT TO SCALE 21" DIAMETER CONCRETE COVERS RAISED TO WITHIN 6" OF TOP OF FOUNDATION FINISH GRADE (OR AS NOTED) (SEE NOTE #5) EL=33.5 Proposed EL=29.5± Ln 1.6 10" 14"" 3, T 1 4'0" I GAS BAFFLE - 1500 GALLON SEPTIC TANK W LLcc W �z Q O 0 z I 31.8 r-�- -- 31.6 " 3�9 2/2 NONE E A L DING TE OF .74 GPD/ F F R SIZING OF SOIL ABSORPTION SYSTEM. X 32.0 5/6 NONE 7/3 NONE / �,X 31.9 �x3.5 LOT 1 $ 31.6 � �sq AREA = 21,114 SF±e w / G04 / I 31.7 // / s x 3 .7 I RES. I m 0 31,E / 1 x 30.5 I ' �.- o � � .� 'mob _�,n..�,��✓� w 31.5 \ _ _ '� PROPOSED DRIVEWAY f _ I 29.2 30.5 r 11.9, 31.7 31.2 ✓' ~' 12 SA$ ^�.� ~ 31.i 3.6' x 30.4 2.4 ROp 31.2 46.3' SFD q"y ie 30 do 31.9 RSFRI w. 31.4 O O 1.4 1, x PROPOSED N 31.4 31 __._ x} 31.8 _ m DROOM y-, " 21.4' 1 4 N W- DWELLING ' x 29.8 TOP OF FOUNDATION TP3 x30.5 1 V EL=33.5 ; INSTALL A TOTAL OF FOUR (4) 24" DIA CONCRETE COVERS TO WITHIN 6" OF FINISH GRADE: TWO FOR SEPTIC TANK, ONE FOR D-BOX AND ONE FOR THE S.A.S. 26.50 / -- 29' DB-3 D-BOX H-20 2" DROP EL=29.8± 26.5± PLAN SCALE ' THIS AREA IS SERVED BY TOWN WATER. BENCHMARK TOP OF CONCRETE BOUND EL=30.0± (NAVD 1988 DATUM) .-Proposed EL= 29.5 36" Proposed (9" Min- 36" Max) FILTER FABRIC 3/4"-1-1/2" NATIVE STONE x 29.7 f / 2�� �in x .7 2X0 x 29.6 r 31 r r Yarmou Ith Department QV.� Ll Date 23.75 USE THREE (3) SHOREY PRECAST 500GALLON LEACH CHAMBERS 7.1'± Longest Run WITH 4' OF NATIVE STONE AROUND - 16' (END VIEW) LEACHING CHAMBER - EL=16.6± BOTTOM OFTH4 33.0'x 12.83'x 2.0' X 28.5 X 29.1 • 29.6 28.7 T 0 O 0 L=i�Ub2D a ti JUL 2 3 2024 HEALTH DEPT. REVISED 4-15-2024: RELOCATED DWELLING TO THE SOUTH AND EAST, ADJUSTED GRADING AND SETBACKS. REVISED 3-27-2024: RELOCATED DWELLING 15 FEET TO THE EAST, ADJUSTED GRADING AND SETBACKS. REVISED 11-27-2023: ADDED AVERAGE GRADE CALCULATION. 0 20 40 60 SCALE 1"=20' G:\/WOBS\THE DAVENPORT CO.\9538\DWG\9538 SITE & SDS PLAN.dwg SOUTH YARMOUTH, MA NOT TO SCALE PLAN BOOK 349 PAGE 32 DEED BOOK PAGE _ ASSESSORS' MAP 80 PARCEL 130 LEGEND ---. -3z EXISTING CONTOUR 32 PROPOSED CONTOUR x12.34 EXISTING SPOT GRADE 24x5 PROPOSED SPOT GRADE -w- WATER SERVICE LINE -OH- OVERHEAD UTILITY SERVICE -E- ELECTRIC/COMM. SERVICE LINE -G- GAS SERVICE LINE ® TEST HOLE / BORING LOCATION ST SEPTIC TANK DB DISTRIBUTION BOX SAS SOIL ABSORPTION SYSTEM Reserve RESERVED FOR FUTURE � UTILITY POLE ® CATCH BASIN `L7 FIRE HYDRANT ® WELL Q DRAINAGE MANHOLE ® CONCRETE BOUND, FOUND -x-*- LIMIT OF WORK -o---d- FENCE ti EDGE OF CLEARING ZONING CLASSIFICATION ZONE R40 (RESIDENTIAL) MINIMUM AREA 40,000 SF MINIMUM FRONTAGE 150 FEET ROAD SETBACK 30 FEET ABUTTER SETBACK 20 FEET MAXIMUM BUILDING COVERAGE 25% MAXIMUM BUILDING HEIGHT 30 FEET PROPOSED BUILDING COVERAGE CALCULATION: DWELLING AREA 1,474 SF± DECKS+STEPS+BULKHEAD 198 SF± TOTAL 1,672 SF± LOT AREA 21,114 (BUILDING AREA) x100= BUILDING COVERAGE (LOT AREA) (1,672 / 21,114) x 100 = 7.9 %± 7.9% < 25.OS6 AVERAGE STREET GRADE: EXISTING: (31.8 + 31.6 + 31.5) / 3 = 31.6 The Davenport Companies 20 NORTH MAIN STREET, YARMOUTH, MA SITE & SEWAGE DISPOSAL SYSTEM PLAN 150 NORTH MAIN STREET, YARMOUTH, MA 60 J.M. O'REILLY & ASSOCIATES, INC. Professional Engineering & Land Surveying Services 1573 Main Street - Route 6A P.O. Bog 1773 (508)896-6601 Office Brewster, MA 02631 (508)896-6602 Fax E: SCALE: BY: rECK: [JOB NUMBER: 10-20-23 As Noted JMO/gbMO JMO-9538