Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot Zone of Contribution: In Out L./Acreage Commercial: Residential: Street: ft 19 12 Village: c. Floor Plan: #Bedrooms: d Owner: O Installer: 5 r Address: �' 2�y�-J I\ue S. y: Phone: ,,, ' Phone: 57_,$ - 37 5, ion, Builder: Engineer: Wei kep-ly C. -7 i Address: Phone: 77t/- 95 y- f(,[6 Phone: N/A YES NO 1.Required#of copies received 2.Date of soils exam and percolation test not older than 2 years t./ 3.4-5 ft of naturally occurring pervious material,above water table 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic components Var.: ,/ 6.Benchmark indicated and shown-NGVD if near wetlands i/ 7. Septic tank minimum 10 ft from foundation,deck Var.: ✓ 8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: ✓ 14. Leaching set 4-5 ft above adj.water or bottom of test hole Var.: 15. System not in top or subsoil(A,B horizons)or 5' removal t� 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", %"preferred 18. System meets breakout requirements PVC liner: Wall: ✓ 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal ✓ 22. System adequately sized for its intended use 23.Minimum 6"stone or compacted below tank and dbox v 24.Manhole covers within 6"of grade,pump chamber cover to grade 25. Inspection port on plastic chambers/leach field 26. Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed ,l/ 29. Vent provided if leaching below 3 feet,under driveway/parking 30.Buoyancy calculations for tank/pump chamber ✓ 31.Engineer to inspect and certify soils: wall: commercial: 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature ✓ 33.H-20 loading is subject to vehicular traffic, groundwater ✓ 34.Title V Application and permit fee,installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd V 37.Check area lots for groundwater/Label groundwater in 's Map Plan reviewed by: �/- b'�C/ 6/03/03