SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. Lot1/4)9 /p9 7 Zone of Contribution: In Out L7 Acreage
Commercial: Residential: (/
Street: /
Village: Floor Plan: �/ #Bedrooms:
Owner: L 1 Y1 g dS Installer: P1111 Ct g v e y S 1:)c C G.
Address: 33G T4 c y,e j Cr Phone:
Phone: !�
Builder: Engineer: �\/ U Ls (AO
I l �
Address: Phone:
Phone:
N/A YES NO
1. Required#of copies received v
2. Date of soils exam and percolation test not older than 2 years 04 ,/
3. 4-5 ft of naturally occurring pervious material,above water table ✓
4. Foundation 2 ft above high point of road H.P.: Fnd: Var.: v
5. Water line 10 ft from septic components Var.: V
6. Benchmark indicated and shown-NGVD if near wetlands V
7. Septic tank minimum 10 ft from foundation, deck Var.: V
8. Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.:
9. Leaching minimum 100 ft from wetlands Var.: i/
10. Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ✓
11. Tank/leaching minimum 10 ft from property line Var.: /
12. System meets all other setback requirements Var.: V
13.Uses adjustment for maximum high groundwater Var.: ✓
14.Leaching set 4-5 ft above adj. water or bottom of test hole Var.: ,/
15. System not in top or subsoil(A,B horizons)or 5'removal
16.Proposed contours are suitable ✓
17. System meets slope requirements-min. 1/8", %"preferred ,�
18. System meets breakout requirements PVC liner: Wall: V
19. Specified tee sizes are proper,gas baffle on outlet tee ✓
20. Sewage is under 10,000 gpd for parcel v
21.No garbage disposal ✓
22. System adequately sized for its intended use k/
23.Minimum 6"stone or compacted below tank and dbox ✓'
24. Manhole covers within 6"of grade,pump chamber cover to grade v
25. In ctionpartan antic chambers/leach field V
26. E ctrical permit for pum�chamber/Separate meter for duplexes
27. Pump sys - ' . e,weep hole,check valve,tee in dbox,pump size
28. Septic tank/pump chamber to be factory waterproofed l/
29. Vent provided if leaching below 3 feet,under driveway/parking ,�
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial: V
32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature v
33. H-20 loading is subject to vehicular traffic,groundwater
34. Title V Application and permit fee, installer signature ✓
35.Foundation footing min.2 feet above adjusted ground water for new house ✓
36. Deed Restriction required max. #bedrooms: max. flow: gpd tV
37. Check area lots for groundwater/Label groundwater in sor's Ma (/
Plan reviewed by: b -''o2'( - /" 6iO3iO3