Loading...
HomeMy WebLinkAboutPresentation Slides 08-15-2024August 15, 2024 Conservation Commission Yarmouth Phase 1 Collection System Phase 1 Collection System 2 Phase 1 Contracts 5 and 6 Pumping Stations 3 ▪Notice of Intent (NOI) – DEP File No. 083-2442 ▪PS1 located at 156 Route 28 (outside of Con Com jurisdiction) ▪PS2 located at 316 Route 28 ▪PS3 located by Riverwalk Park ▪Parker River Crossing Double Sewer Siphon using Horizontal Directional Drill (HDD) Limited Project per 310 CMR 10.53 (3)(d) – Public utilities ▪Land Subject to Coastal Storm Flowage (LSCSF)(elevation 11 ft) Locus Map 4 PS 2 ▪Location is paved and packed gravel parking lot ▪Submersible wet well and meter vault accesses via hatches/manholes ▪11.5’ by 17’ building (control room) ▪Small meter vault below ground ▪Standby natural gas generator on 5’ by 12’ concrete pad ▪Raise existing grade to 13 ft to allow FFE to be 3 ft above BFE of 11 ft ▪Finish graded with 4-inch deep gravel surface ▪Overall increase of 390 sf of impervious area 5 PS 2 – Site Plan 6 PS 2 – Compliance with Mass Stormwater Standards (New Development) ▪BMPs will provide water quality treatment (90 %TSS), peak attenuation, and recharge to groundwater: ▪4-inch gravel surface (northern half of the site, section of driveway, wet well , and generator pad) ▪Bioretention Area along Rte 28 (southern half of the site, access drive, and flow meter vault) ▪Coastal – peak attenuation not applicable ▪Overflow from the bioretention area will flow into the cranberry bogs to the north of the site 7 PS 3 – Previously approved under DEP File No. 83-2372 Site Summary: ▪Location is off Riverwalk Access Road ▪Submersible wet well and meter vault accesses via hatches/manholes ▪40’ by 24’ building (control room) ▪Raise existing grade to allow FFE to be 3 ft above BFE of 11 ft ▪Stormwater runoff captured in gutters and discharged to Park Developments’ Infiltration System No. 1 8 Changes since issuance of OOC: Reduced impervious area Site Plan PS 3 9 Contracts 5 and 6 Pumping Stations 10 ▪Climate Resiliency and Adaptation ▪Critical equipment and control building will be 3 feet above effective 100-yr floodplain (el. 11 ft) ▪Mitigation Measures ▪Erosion and sedimentation control (compost logs) ▪Excavation dewatering using basin, sediment removal ▪Spill control measures ▪Erosion prevention of seeded areas Double Siphon Parkers River using HDD 11 Summary Wetland Resource Area Impacts 12