HomeMy WebLinkAbout2024-08-14 Summary of Plan RevisionsEngineers
Environmental Scientists
Software Developers
Landscape Architects
Planners
Surveyors
AUGUST 14, 2024 www.bscgroup.com
Kathy Williams, P.E.
Yarmouth Town Planner
1146 Route 28
South Yarmouth, MA 02664
RE: VCOD SPR Application, 811 Route 28, South Yarmouth
Dear Kathy,
BSC Group, Inc. (BSC) has revised the site plans for the proposed multi-family development at 811 Route 28 in
South Yarmouth. The plans were revised based on the coordination meeting with the Yarmouth Fire Department
on July 25, 2024. The following summarizes the plan modifications that have resulted in the current site plans,
revised August 14, 2024:
· The emergency vehicle turnaround was removed, and a fire hydrant was added to the site plan in the agreed
upon location.
· The building was moved north, maintaining the 30-foot minimum front yard setback.
· Eight (8) additional parking spaces were created on the south side of the proposed building.
· The dumpster was relocated southeast of the proposed building, at the edge of the parking area.
· Modified the proposed plantings accordingly based on the layout updates.
· Infiltration System #1 was reconfigured to accommodate the proposed building.
· The bicycle rack was moved north and the adjacent walkway was reconfigured accordingly, to
accommodate the proposed building.
We look forward to presenting these changes to the Planning Board at the next regularly scheduled public
hearing on August 21, 2024. If you have any questions or comments in the interim, please contact us at your
convenience.
Sincerely,
BSC Group, Inc.
Brian G. Yergatian, P.E., LEED AP
Manager of Civil Engineering, Senior Associate
349 Main Street, Route 28, Unit D / West Yarmouth, MA 02673 / 508-778-8919