Loading...
HomeMy WebLinkAbout5046 484 Willow St 1-Year Review Irrigation System MaterialsOlsen Construction Services 21 Deming Rd Kensington, Connecticut 06037 P: +18606101093 Project: 23-00054 Eversource Yarmouth ERP Project 484 Willow St. West Yarmouth, Massachusetts 02673 P: n     Submittal #320000-10-1.0 - Irrigation System Materials 320000-10 - Irrigation System     Distribution Summary Distributed by Jean Taglialavore (Olsen Construction Services) on Oct 3, 2023   To Christopher Lynch (Lawrence Lynch), Nick Olsen (Olsen Construction Services), Jean Taglialavore (Olsen Construction Services) , Jesse Palen (Olsen Construction Services), Dominic Frigillana (Lawrence Lynch) Message None Attachments     Name Response Attachments Comments Carla Hilton (Shive-Hattery)Approved as Noted Transmittal_Submittal - 320000-10-1-0 (Responded and Closed).pdf, Transmittal_Submittal - 320000-10-1-0 (Responded and Closed).pdf, EAW_Markup_MT-015 Irrigation System Material Cut Sheets.pdf  Note: Please review the attached Transmittal PDF for the full formatted text. Jean Taglialavore (Olsen Construction Services) Submitted MT-015 Irrigation System Material Cut Sheets.pdf  Please review and respond within 5 days.  Thanks.   Revision 0 Submittal Manager Jean Taglialavore (Olsen Construction Services) Status Closed Date Created Sep 28, 2023 Issue Date Sep 28, 2023 Spec Section 320000-10 - Irrigation System Responsible Contractor Lawrence Lynch Received From Dominic Frigillana (Lawrence Lynch) Received Date  Submit By Sep 28, 2023 Final Due Date Oct 3, 2023 Lead Time Cost Code Location Type Product Information Approvers Carla Hilton (Shive-Hattery) Ball in Court Distribution Carla Hilton (Shive-Hattery), Dominic Frigillana (Lawrence Lynch), Jean Taglialavore (Olsen Construction Services), Jesse Palen (Olsen Construction Services), Nick Olsen (Olsen Construction Services) Description         Olsen Construction Services Page 1 of 2 Printed On: May 8, 2024 12:05 PM EDT    Submittal Workflow Name Sent Date Due Date Returned Date Response Attachments General Information Attachments      Jean Taglialavore  Sep 28, 2023 Sep 28, 2023 Submitted MT-015 Irrigation System Material Cut Sheets.pdf   Comment Please review and respond within 5 days.  Thanks. Carla Hilton Sep 28, 2023 Oct 3, 2023 Oct 3, 2023 Approved as Noted Transmittal_Submittal - 320000-10-1-0 (Responded and Closed).pdf (Current)  Transmittal_Submittal - 320000-10-1-0 (Responded and Closed).pdf (Current)  EAW_Markup_MT-015 Irrigation System Material Cut Sheets.pdf (Current)  Comment Note: Please review the attached Transmittal PDF for the full formatted text. Submittal #320000-10-1.0 - Irrigation System Materials Project: 23-00054 Eversource Yarmouth ERP Project     Olsen Construction Services Page 2 of 2 Printed On: May 8, 2024 12:05 PM EDT    Project # 3172201210 800.798.0313 | shive-hattery.com Submittal PROJECT:Eversource Yarmouth ERP DATE:10/3/2023 SUBJECT:Irrigation System Materials SUBMITTAL ID:320000-10-1-0 TYPE:Submittal VIA:Procore PURPOSE:Furnish as Corrected SPEC SECTION:320000-10 TO:COMPANY / ADDRESS PHONE Jean Taglialavore jtaglialavore@olsencs.com Olsen Construction 21 Deming Rd Berlin CT 06037 United States FROM:COMPANY / ADDRESS PHONE Carla Hilton chilton@shive-hattery.com Shive-Hattery, Inc. REMARKS: Contents QUANTITY:1 DATED:9/28/2023 NUMBER: DESCRIPTION: EAW_Markup_MT-015 Irrigation System Material Cut Sheets.pdf ACTION: REMARKS: This submittal review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the contractor from compliance with the requirements of the plans and the specifications. Approval of a specific item shall not include approval of an assembly of which the item is a component. Contractor is responsible for: dimensions to be confirmed and correlated at the jobsite; information that pertains solely to the fabrication process or to the means, methods, techniques, sequences, and procedures of construction; coordination of the work of all trades; and for performing all work in a safe and satisfactory manner. COPIES: Emily Williamson Shive-Hattery, Inc. When electronic files are a part of this transmittal, upon opening the electronic file, the recipient agrees to Shive-Hattery’s Terms and Conditions For Use. A copy can be found at: www.shive-hattery.com/pdf/EFT-TermsAndConditions.pdf. In the event that the recipient does not have internet access or the link is not available, please contact the sender for a copy. SUBMITTAL Job:28-008 ERP Spec Section No: Submittal No: 23-008 - MT- 015 Revision No:REV. 0 Sent Date:9/28/2023 Spec Section Title: Submittal Title: Contractor: Architect: Engineer: Irrigation System Cut Sheets • Controller • Valves • Spray Bodies • Irrigation Line • Drip Line Contractor’s Stamp 21 Deming Rd. | Berlin, CT 06037 Architect’s Stamp Engineer’s Stamp Page 1 of 7 Page 2 of 7 Page 3 of 7 Page 4 of 7 Page 5 of 7 Page 6 of 7 Page 7 of 7 Project # 3172201210 800.798.0313 | shive-hattery.com Submittal PROJECT:Eversource Yarmouth ERP DATE:10/3/2023 SUBJECT:Irrigation System Materials SUBMITTAL ID:320000-10-1-0 TYPE:Submittal VIA:Procore PURPOSE:Furnish as Corrected SPEC SECTION:320000-10 TO:COMPANY / ADDRESS PHONE Jean Taglialavore jtaglialavore@olsencs.com Olsen Construction 21 Deming Rd Berlin CT 06037 United States FROM:COMPANY / ADDRESS PHONE Carla Hilton chilton@shive-hattery.com Shive-Hattery, Inc. REMARKS: Contents QUANTITY:1 DATED:9/28/2023 NUMBER: DESCRIPTION: EAW_Markup_MT-015 Irrigation System Material Cut Sheets.pdf ACTION: REMARKS: This submittal review is only for general conformance with the design concept of the project and general compliance with the information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the contractor from compliance with the requirements of the plans and the specifications. Approval of a specific item shall not include approval of an assembly of which the item is a component. Contractor is responsible for: dimensions to be confirmed and correlated at the jobsite; information that pertains solely to the fabrication process or to the means, methods, techniques, sequences, and procedures of construction; coordination of the work of all trades; and for performing all work in a safe and satisfactory manner. COPIES: Emily Williamson Shive-Hattery, Inc. When electronic files are a part of this transmittal, upon opening the electronic file, the recipient agrees to Shive-Hattery’s Terms and Conditions For Use. A copy can be found at: www.shive-hattery.com/pdf/EFT-TermsAndConditions.pdf. In the event that the recipient does not have internet access or the link is not available, please contact the sender for a copy. SUBMITTAL Job:28-008 ERP Spec Section No: Submittal No: 23-008 - MT- 015 Revision No:REV. 0 Sent Date:9/28/2023 Spec Section Title: Submittal Title: Contractor: Architect: Engineer: Irrigation System Cut Sheets • Controller • Valves • Spray Bodies • Irrigation Line • Drip Line Contractor’s Stamp 21 Deming Rd. | Berlin, CT 06037 Architect’s Stamp Engineer’s Stamp Page 1 of 7 Page 2 of 7 Page 3 of 7 Page 4 of 7 Page 5 of 7 Page 6 of 7 Page 7 of 7