HomeMy WebLinkAbout5046 484 Willow St 1-Year Review Irrigation System MaterialsOlsen Construction Services
21 Deming Rd
Kensington, Connecticut 06037
P: +18606101093
Project: 23-00054 Eversource Yarmouth ERP Project
484 Willow St.
West Yarmouth, Massachusetts 02673
P: n
Submittal #320000-10-1.0 - Irrigation System Materials
320000-10 - Irrigation System
Distribution Summary
Distributed by Jean Taglialavore (Olsen Construction Services) on Oct 3, 2023
To Christopher Lynch (Lawrence Lynch), Nick Olsen (Olsen Construction Services), Jean Taglialavore (Olsen Construction Services)
, Jesse Palen (Olsen Construction Services), Dominic Frigillana (Lawrence Lynch)
Message None
Attachments
Name Response Attachments Comments
Carla Hilton (Shive-Hattery)Approved as Noted Transmittal_Submittal -
320000-10-1-0 (Responded
and Closed).pdf,
Transmittal_Submittal -
320000-10-1-0 (Responded
and Closed).pdf,
EAW_Markup_MT-015
Irrigation System Material
Cut Sheets.pdf
Note: Please review the attached Transmittal PDF
for the full formatted text.
Jean Taglialavore
(Olsen Construction Services)
Submitted MT-015 Irrigation System
Material Cut Sheets.pdf
Please review and respond within 5 days. Thanks.
Revision 0 Submittal Manager Jean Taglialavore (Olsen Construction Services)
Status Closed Date Created Sep 28, 2023
Issue Date Sep 28, 2023 Spec Section 320000-10 - Irrigation System
Responsible
Contractor
Lawrence Lynch Received From Dominic Frigillana (Lawrence Lynch)
Received Date Submit By Sep 28, 2023
Final Due Date Oct 3, 2023 Lead Time
Cost Code
Location Type Product Information
Approvers Carla Hilton (Shive-Hattery)
Ball in Court
Distribution Carla Hilton (Shive-Hattery), Dominic Frigillana (Lawrence Lynch), Jean Taglialavore (Olsen Construction Services), Jesse Palen
(Olsen Construction Services), Nick Olsen (Olsen Construction Services)
Description
Olsen Construction Services Page 1 of 2 Printed On: May 8, 2024 12:05 PM EDT
Submittal Workflow
Name Sent Date Due Date Returned Date Response Attachments
General Information
Attachments
Jean Taglialavore Sep 28, 2023 Sep 28, 2023 Submitted MT-015 Irrigation System Material Cut
Sheets.pdf
Comment Please review and respond within 5 days. Thanks.
Carla Hilton Sep 28, 2023 Oct 3, 2023 Oct 3, 2023 Approved as Noted Transmittal_Submittal - 320000-10-1-0
(Responded and Closed).pdf (Current)
Transmittal_Submittal - 320000-10-1-0
(Responded and Closed).pdf (Current)
EAW_Markup_MT-015 Irrigation System
Material Cut Sheets.pdf (Current)
Comment Note: Please review the attached Transmittal PDF for the full formatted text.
Submittal #320000-10-1.0 - Irrigation System Materials Project: 23-00054 Eversource Yarmouth ERP Project
Olsen Construction Services Page 2 of 2 Printed On: May 8, 2024 12:05 PM EDT
Project # 3172201210
800.798.0313 | shive-hattery.com
Submittal
PROJECT:Eversource Yarmouth ERP
DATE:10/3/2023
SUBJECT:Irrigation System Materials
SUBMITTAL ID:320000-10-1-0
TYPE:Submittal
VIA:Procore
PURPOSE:Furnish as Corrected
SPEC SECTION:320000-10
TO:COMPANY / ADDRESS PHONE
Jean Taglialavore
jtaglialavore@olsencs.com
Olsen Construction
21 Deming Rd
Berlin CT 06037
United States
FROM:COMPANY / ADDRESS PHONE
Carla Hilton
chilton@shive-hattery.com
Shive-Hattery, Inc.
REMARKS:
Contents
QUANTITY:1 DATED:9/28/2023 NUMBER:
DESCRIPTION:
EAW_Markup_MT-015 Irrigation System Material Cut Sheets.pdf
ACTION:
REMARKS:
This submittal review is only for general conformance with the design concept of the project and general compliance with the
information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the
contractor from compliance with the requirements of the plans and the specifications. Approval of a specific item shall not include
approval of an assembly of which the item is a component. Contractor is responsible for: dimensions to be confirmed and correlated
at the jobsite; information that pertains solely to the fabrication process or to the means, methods, techniques, sequences, and
procedures of construction; coordination of the work of all trades; and for performing all work in a safe and satisfactory manner.
COPIES:
Emily Williamson Shive-Hattery, Inc.
When electronic files are a part of this transmittal, upon opening the electronic file, the recipient agrees to Shive-Hattery’s Terms and
Conditions For Use. A copy can be found at: www.shive-hattery.com/pdf/EFT-TermsAndConditions.pdf. In the event that the
recipient does not have internet access or the link is not available, please contact the sender for a copy.
SUBMITTAL
Job:28-008 ERP Spec Section No:
Submittal No: 23-008 - MT- 015
Revision No:REV. 0
Sent Date:9/28/2023
Spec Section Title:
Submittal Title:
Contractor:
Architect:
Engineer:
Irrigation System Cut Sheets
• Controller
• Valves
• Spray Bodies
• Irrigation Line
• Drip Line
Contractor’s Stamp
21 Deming Rd. | Berlin, CT 06037
Architect’s Stamp
Engineer’s Stamp
Page 1 of 7
Page 2 of 7
Page 3 of 7
Page 4 of 7
Page 5 of 7
Page 6 of 7
Page 7 of 7
Project # 3172201210
800.798.0313 | shive-hattery.com
Submittal
PROJECT:Eversource Yarmouth ERP
DATE:10/3/2023
SUBJECT:Irrigation System Materials
SUBMITTAL ID:320000-10-1-0
TYPE:Submittal
VIA:Procore
PURPOSE:Furnish as Corrected
SPEC SECTION:320000-10
TO:COMPANY / ADDRESS PHONE
Jean Taglialavore
jtaglialavore@olsencs.com
Olsen Construction
21 Deming Rd
Berlin CT 06037
United States
FROM:COMPANY / ADDRESS PHONE
Carla Hilton
chilton@shive-hattery.com
Shive-Hattery, Inc.
REMARKS:
Contents
QUANTITY:1 DATED:9/28/2023 NUMBER:
DESCRIPTION:
EAW_Markup_MT-015 Irrigation System Material Cut Sheets.pdf
ACTION:
REMARKS:
This submittal review is only for general conformance with the design concept of the project and general compliance with the
information given in the Contract Documents. Corrections or comments made on the submittals during this review do not relieve the
contractor from compliance with the requirements of the plans and the specifications. Approval of a specific item shall not include
approval of an assembly of which the item is a component. Contractor is responsible for: dimensions to be confirmed and correlated
at the jobsite; information that pertains solely to the fabrication process or to the means, methods, techniques, sequences, and
procedures of construction; coordination of the work of all trades; and for performing all work in a safe and satisfactory manner.
COPIES:
Emily Williamson Shive-Hattery, Inc.
When electronic files are a part of this transmittal, upon opening the electronic file, the recipient agrees to Shive-Hattery’s Terms and
Conditions For Use. A copy can be found at: www.shive-hattery.com/pdf/EFT-TermsAndConditions.pdf. In the event that the
recipient does not have internet access or the link is not available, please contact the sender for a copy.
SUBMITTAL
Job:28-008 ERP Spec Section No:
Submittal No: 23-008 - MT- 015
Revision No:REV. 0
Sent Date:9/28/2023
Spec Section Title:
Submittal Title:
Contractor:
Architect:
Engineer:
Irrigation System Cut Sheets
• Controller
• Valves
• Spray Bodies
• Irrigation Line
• Drip Line
Contractor’s Stamp
21 Deming Rd. | Berlin, CT 06037
Architect’s Stamp
Engineer’s Stamp
Page 1 of 7
Page 2 of 7
Page 3 of 7
Page 4 of 7
Page 5 of 7
Page 6 of 7
Page 7 of 7