Loading...
HomeMy WebLinkAboutEngineer PlanExisting Dwelling CELLAR WALL • See Construction Note #14 Septic tank covers must be —0.02' fL within 6" of finished grade 2�• *PROPOSED 1500 GAL. SEPTIC TANK H-10 SYSTEM PROFILE Not to Scale PROPOSED 3 HOLE H-20 DIST. BOX D-Box cover shall be within 6" of finished grade d for 2' 3/4"-i l4" DOL Washed Stone Existing invert elevations and locations shall be 6" OF 3/4"-11 /2" STONE determined prior to any installation work 6" OF 3/4"-11/2" STONE 12" min. One chamber cover shall be Min. 2"-1/8"-1/2" Double-Woshed Slone 36" max. within 6' of finished grade or geo-textile filter cloth OGI� GG G OOOO pOO 24" Bot am f Leach Facility Elev. 2.5' 3/4"-1$" Double —Washed Stone 5' Min. LEACHING CHAMBERS -Bottomt Hole Elev./GW Elev. CROSS-SECTION CONSTRUCTION NOTES 1. Contractor is responsible for Digsafe notification and protection of all underground utilities and pipes. 2. The septic tank ono distribution box sholl be set level on 6" of 3/4 —11/2" stone. 3. Bockffll should be clean sand or gravel with no stones over 3" in size. 4. This system is subject to inspection during installation by Geo—Cape Environmental Consultants. 5. The contractor shall install this system in accordance with Title 5 of the Massachusetts Environmental Code and local Board of Health Rules and Regulations. 6. If, during installation the contractor encounters any soil conditions or site conditions that ore different from those shown on the soil log or in the design, the installer shall halt installation and immediately notify Geo—Cape Environmental Consultants. 7. No vehicle or heavy machinery shall drive over the septic system unless noted as H-20 septic components. 6. Install Tuf—Tate gas baffle or equal on septic tank outlet tee. 9. All piping shall be SCH 40 PVC. 10. No wells ore located within 150' of proposed SAS. 11. Provide 1, 1,500—gallon H-10 septic tank, 1 H-20 DB-3 distribution box and 2 H-10 500—gal. chambers by Wiggin Precast or equal. 12. Existing septic tank shall be pumped and removed. The existing SAS shall pumped and bockfilled or removed. Fill shall meet 310 CMR 15.255(3) specifications. 13. Provide magnetic marking tape over components one —foot below grade to facilitate convenient re —location of components. 14. If access does not allow a precast concrete tank to be installed, substitute with the following DEP approved tanks: Roth Model RUT-1500 or Infiltrator Model TW-1500. If used, the tanks shall be Installed in strict conformance with the DEP approval letters and manufacturers specifications. 15. A 40 mil thick polyethylene or rubber liner shall be installed as shown on the site plan. The bottom of the liner shall be installed at elevation=19.0 with the top elevation= 22.0' =2% sloe awax Existing Grade=23-25't 4vm� One chamber cover shall be 1z" MIN. within 6" of finished grade 36" MAX see see ses 29' H -10 5' MIN., 6' PROVIDED LEACHING CHAMBERS Desian Calculations Stone \ SL SLOPE of Test Hole Elev.=12.94' 40 mil LINER of LINER Elev.=19.0' Number of Bedrooms: 2 Equivalent to 220 Gal./Day (Design for 3 bedrooms, min. per Title 5) Garbage Disposal: Not allowed with this design Septic Tank Capacity Required: 330 gpd x 200% = 660 gpd. Septic Tank Capacity Provided: Proposed 1,500-gal H-10 septic Tank Leaching Capacity Required: 330 gpd x LTAR- 446 sq. ft. Req'd Area LTAR for Close I soil at Q min./inch - 0.74 gal/sq. ft. Proposed Leaching Structure: 1-29' x 10' x 2' Leaching Trench Bottom Leaching Area Provided = 290 sq. ft. Sidewoll Leaching Area Provided = 156 sq. ft. Total Leaching Area Provided = 446 sq. ft. = 446 sq. ft req'd. Leaching Capacity Provide 446 sq. ft X 0.74 gal/sq.tt.=330 gpd = 330 gpd req'd. SOIL EVALUATION & PERK TEST Date of SOIL EVALUATION: AUGUST 7, 2024 Evaluation Performed By. Glen E. Harrington, R.S. Witness: Barry Lewis, Assistant Health Agent Excavator: TLH Excavation Percolation Rote: Use Q mpi In C7 for design purposes Test Hole No. 1 DEPTH SOILS ELEV. 0 23" FILL 22.52 E loamy 30" 10YR5 2 21.94 Bee loam 48" 101R5 6 20.44 C1 med. sand 10YR6/4 132" loose 12.94 PERK TEST #1 DEPTH: 44-62" BEGIN SOAK: 00:00 END SOAK: 08:25 MIN: SEC ,9 8:25 MIN.- UNABLE TO SOAK, USE Q MPI FOR DESIGN PURPOSES No Observed Ground Water Soil Evaluation Certification I certify that on October, 1995, 1 have passed the sail evaluator examina9on approved by the DEP and that the analysis was performed by me consistent with the req irsd training, expertise and experience described in 310 CMR 15.017, aE1 E � sS PROPOSED SEPTIC SYSTEM REPAIR PREPARED FOR TLH EXCAVATION AT #49 SEMINOLE DRIVE YARMOUTH, MA _ PREPARED BY: A PERFECT ENVIRONMENT LLC dba GEO—CAPE ENVIRONMENTAL CONSULTANTS 100 Independence Drive, Suite 7-623 Hyannis, MA 02601 SCALE: V-20' DRAWN BY: GEHRS DATE: 12 AUG 2024 DATUM: APPROX GIS FILE: 49 Seminole SHEET 2 OF 2 SITE PLAN GENERAL NOTES i. ADDRESS: 49 SEMINOLE DRIVE, YARMOUTH � #g Mp 2. ASSESSOR'S NUMBER: MAP 116 PARCEL 5 3. DEVELOPER'S LOT: LOT 7 SCALE. 1 " = 20' 4. TOPOGRAPHIC INFORMATION WAS COMPILED FROM AN ON THE GROUND INTRUMENT,SURVEY. 776 j 5. TOWN WATER IS PROVIDED TO THE SITE & SURROUNDING PROPERTIES. B . M . = 2 8.0 APPROX. G I S 27'4 lygT F 6. NO WETLANDS ARE LOCATED WITHIN 200 FEET OF PROPOSED SEPTIC SYSTEM. ON FIRST FLOOR SLIDER LE ?, �^ 8. UTI •I TES LOCATED BYa DIGSAFE. BOOK28UTILITY LOCATIONS ARE APPROXIMATE. PAGE 48, REFERENCE DEED: DEEDBOOK 11995 PG 2" 9. THIS DESIGN PLAN 1S TO BE UTILIZED FOR THIS SEPTIC REPAIR ONLY. THRESHOLD 26.94' 10. EXISTING SEPTIC COMPONENTS LOCATED IN THE FIELD & PER AS -BUILT ON FILE AT B.O.H. #3 11. THE DESIGNER HAS NOT BEEN CONTRACTED TO SUPERVISE THE INSTALLATION. N ,� 12. THE SITE 1S LOCATED IN FLOOD ZONE X MINIMAL FLOOD HAZARD PER FIRM 25001CO578J, 7/16/14 0 ,y��i 13. THE SITE IS NOT LOCATED IN A DEP ZONE 11, NHESP DESIGNATED AREA OR DCPC. t J T /'o C9^r 14. THE SITE IS LOCATED IN THE DEP NATURAL RESOURCE/NITROGEN SENSITIVE AREA. � ..,_ •' 26.1 `ti6 Doh �'q �6q�F I it 709 ry� PROPOSED SAS 2626.,2 _ /'� 0� '6�3. � of stO�eConcrete e ends andhers with 4' b in—between and I I ��- ti 2.5' can the sides in a 29' x 10' x 2' , 26.07' B.M. -- p leach trench. { 2 14/ 'ii F _..� 40 MIL LINER i SSE NOTES #1U5CTION ,76 0 i Q i O X •20 25.5T i G S• G D—Box' �� / i� ?g•.... O �� `Y ass g �+ P/��`L�26.•' //o � : 0 ass . •'.• �N�`o �', / / � ��G � `\ C9 gyp. ... •'•'' :. •` ••' • . \ •. 1 10 ''• � '' ''C�;�' SITE S rn "YARM OU TH PORT" LOCUS NO SCALE 4 SEPTIC LAYOUT 0t quy .re e<` o9f / SCALE: 1"=20' Yarmouth Health Departmeint — = 34'-9" —=15'-10„ A A l B 1 \ G o A-2= 42'-6" B-2=12'-8" WRI L \ DRivEwAY 3 ✓ - - A ........................... ,l B-3= 34'-2" C-3=31'-2" �o 2.38' LOT 7 B-4= 58'-5" C-4=41'-9" \ o o� �i' °° Name Date EA 10, tiff .A.........=100 SF.. ��ti• 1...' t��� fey R \ ° a\'�...................................................... • / C0 ' �� o�- LEGENDAUG 14 2024 �` A 11O\;` ,,/ ��\ �F,� Post &Rail with Wire Fence HEALTH DEPT. �y Test Hole Location oFL9� \,R=30.000 ./ PROPOSED SEPTIC SYSTEM REPAIR Fire Hydrant PREPARED FOR �8 _W_ Approximate location TLH EXCAVATION rn water line ALL OUTLET PIPES FROM THE AT SET LEVEL FOR AT LEAST 2 FT. 12" CONCRETE COVER _ 29 ., , Existing 1,000 gal. H-10 #49 SEMINOLE DRIVE DISTRIBUTION BOX SHALL BE (�18 • • Existing contour L- -I loading septic tank (to be 3 - 5" OUTLET 3" YARMOUTH MA n r moved and e KNOCKOUTS pumped ) L v . 18" t2" INLET Existing SAS to be �t�P �'9 PREPARED BY: OUTLET 10 > d' ` pumped & filled (See a ti A PERFEC T ENVIRONMENT L L C $„ 4 ' O O / Construction Note 12 d bd a oStockade ence 4 L # 6' F -a A F ; GEO—CAPE ENVIRONMENTAL bn i �7 CONSULTANTS •�� N::::• :: ':•� ::.'• P Proposed contour � �--23 —� 3" P � , � � 100 Independence Drive Suite 7-623 4, P PLAN —SECTION CROSS SECTION Proposed 1,500 gal. H-10 Hyannis, MA 02601 SAS LAYOUT loading septic tank (See i°JyfP'j'•AR�A Tel: 774-238-1813 3 HOLE H — 2 0 DISTRIBUTION BOX Construction Note #14) DRAErnoWN AP Y: GEnvir°nment®g TE: 1 m PLAN VIEW I SCALE: 1 =20' DRAWN BY: GEHRS DATE: 12 AUG 2024 NOT TO SCALE NOT TO SCALE DATUM: APPROX GIS FILE: 49 Seminole I SHEET 1 OF 2