Loading...
HomeMy WebLinkAboutEngineer PlanEft LOCATION MAP BENCHMARK: TAG BOLT ON HYDRANT AT ELEV. 13.0' NAVD '88 ASSESSORS MAP: _ --A PARCEL: - FLOOD ZONE: -- 1�6T' ►�`PG�,1G1�� REFERENCE: _.- -09 lamy— b TOP SEPTIC TANK ELEV. 9.8' ELEVATIONS: NAVD '88 aw TEST HOLE LOGS SO I L EVALUATOR :--mm? vmt� -I . e�& WITNESS: DATE: QLM il tC PERCOLATION ATE:._ tid 4p. 10,E Nqv TI1- I Permit valid for REPAIR OF SEPTIC SA'STEN1 ONLY, dice to State and Local septic variances. �l Board of health review and approval is required for any future additions/rends ationsiaIterations to sewage facilities and/or structures/dwelling. Yarmouth Hearth I)epattinennt L\'\ 5 APPROVE.1) 54!ly � ,2- a' ro ame Date Nib DPI �vu' > (.r2. c-Ae�y( i Rod 60*�S 1D 0AV _ - a Iti�/ I j�q 6 I � Z'-O 000 j�AAL­ -?OAF alAw, ftv,- A Eft' • _ �L�h2.V� _-`o__ �i�-_��DCD vth�?��U- or�.1 `�E�c��--�(.�� A-1*M oW 1.57,- q, X (0.tVM7 y Flo, 10L'Q;7 3`C6 BMW TI1-2 SEPTIC SYSTEM DESIGN FLOW EST!HATE 3 BEDROOI.S AT 110 GAI_/DAY/BEDR001.1 - GAL/DAY SEPTIC TANK, GAL/DAY x 2 DAYS - VOt GAL USE IDDO GALLON SEPTIC TANK 6- o - J -- SABSOR;'TION SYS OIL TEM U6 �1 � t-0q �- Y. I C uI DE X (� r YV, 1 I16D S I DE AREA: bl �1UL14�t BOTTOM AREA:-. ' x 11 0;-)q = 335►7 SEPTIC'SYSTEM SECTION 1; 1 M O —60 r b _ bF�_c_xx�ID>�i1_ -- N>RVD �S Flo �9b DATE ES' All t=1tt. 1110" rl' 1 I) 'I'Ile ins(allalion shall Comply with 3'ille V r110'fown of �t•1gTIR Board of I ICIIIIII Regulal'tons. 2) The installer shall verify the localion of ulilities, sewer inverts and septic components prior to installalion anti selling (lase elevations. 3) All g avity septic piping to be 11 inch Seipp) PVC al I/8" per foot. `fI lust two feet out of the d-box to (lie iellehing shall be level. 4) This plan is not to be tllilized liar property line determination nor any other purpose other than the proposed system installation. 5) All septic components must meet Tille V specifications. 6) Parking shall not be constructed over 1110 septic components. 7) The property is bounded by property corners and property lines. 8) The property owner shall review design considerations to approve of total design flow and number of bedrooms to be considered for design. Receipt of payment for (lie plan and installation based on the plan shall be deemed approval of (]:a design flow by the owner.. 9) The existing leaching or cesspools shall be pumped an(] filled will] material per Title V abandonment procedures. Those within fhe proposed SAS shall be removed along will' coirtaminated soil.and replaced with clean slrnd per Title V specs. 10) Sys(ern components to be 10 feet from water line. Sewer lines crossing the water line shall be sleeved with 4 inch SCII 40 PVC with ends grouted if applicable. The proposed SAS is being installed below the water service line. The line is to be sleeved as aforementioned and maintained in place. 1 1) If a garbage grinder exists it is to be reproved and is the responsibility ol'the owner to ensure such. I2)1'he installer is to lake caution in excavation around the gas line ifsuch exists. 13)'hic ilist nIler shall verily the local hill, ttunoltly and t:levnlion oI'IIIc sewer lines exiting file dwelling'nrior to the ins(allalion. 14)This plan is representative only that a systerrr can fit on a property meeting Tille V requirements. �(tt tlF,l/,qs t4 s DAVID' B. o MASON `shoe-�, J p No. lori6 ' A�R h�E�� U P 't'`r �CSoRV'Ev� 012 36 1401} 10� 94- Il2 17)0uft, 95 1 I DO GAL tG-5 A - - �I I x EPT1 IOTA 11C 1 c���---- HEALTH AGENT 5- � ��� ✓I't%D c�t~Ip, 1�VtTlrit� _ �1. �.75 SITE AND SEWAGE PLAN LOCATION: I C H6 —, PREPARED FOR: C142D11� cc � i AA SCALE: I d DAV I D B . MASON R5 DATE: Z� old DBC ENVIRONMENtfAL DESIGNS EAST SANDWICH. MA (508) 833- 2177 I E-ZFui HEALTH DEPT. . K