Loading...
HomeMy WebLinkAboutReview Checklist KC ,Q 9 7'f -4 ? TOWN OF YARMOUTH ( a f, '�.f ' 1,-71 7j(4') SEWAGE PLAN REVIEW CHECKLIST it Location: A.M. J 7 Lot/CC, 2- Zone of Contribution: In Out'A-c-reage Commercial: Residential: . Street: /k 659 4 � ' /ewe Village: 60 ' iv Floor Plan: #Bedrooms: 9 Owner: y Installer: Address: Phone: '7, S Phone: i 4 - („/ �� Builder: Engineer: / 671- Address: Phone: AK - /�i Phone: - G�c�t s 1 " <L(y N/A YES NO 1.Required#of copies received 2. Date of soils exam and percolation test not older than 2 years 3. 4-5 ft of naturally occurring pervious material, above water table L 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: 5. Water line 10 ft from septic components Var.: 6.Benchmark indicated and shown-NGVD if near wetlands 7. Septic tank minimum 10 ft from foundation, deck Var.: 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: f d/ 9.Leaching minimum 100 ft from wetlands Var.: 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: 11.Tank/leaching minimum 10 ft from property line Var.: 12. System meets all other setback requirements Var.: (.13.Uses adjustment for maximum high groundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottomt Var.: 15. System not in top or subsoil(A,B horizons) 5dt' . :pave- J/ 16.Proposed contours are suitable 17. System meets slope requirements-min. 1/8", ' "preferred 18. System meets breakout requirements PVC liner: Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal ' 22. System adequately sized for its intended use • 23.Minimum 6"stone or compacted below tank and dbox L- 24.Manhole covers within 6"of grade,pump chamber cover to grade 25.Inspection port on plastic chambers/leach field 26.Electrical permit for pump chamber/Separate meter for duplexes 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size 28. Septic tank/pump chamber to be factory waterproofed 29.Vent provided if leaching below 3 feet,under driveway/parking 30. Buoyancy calculations for tank/pump chamber 31.Engineer to inspect and certify soils: wall: commercial: 32.Engineer/Registered Sanitarian and Land Surveyor stamps/signature 33.H-20 loading is subject to vehicular traffic, groundwater 762.4t;d 34.Title V Application and permit fee, installer signature 35.Foundation footing min. 2 feet above adjusted ground water for new house 36.Deed Restriction required max. #bedrooms: max. flow: gpd 37.Check area lots for groundwater/Label groundwater in Assessor's Map Plan reviewed by: 6/03iO3 S