Loading...
HomeMy WebLinkAboutEngineer Certification Letter JC ENGINEERING, Inc. v Civil & Environmental Engineering 2854 Cranberry Highway East Wareham, Massachusetts 02538 • Ph. 508-273-0377 August 15, 2024 Mr. Jay Gardiner Health Director Town of Yarmouth Health Division 1146 Route 28 South Yarmouth, MA 02664 RE: Substantial Compliance for Newly Installed Septic System Located at 27 Wadsworth Lane, Yarmouth, Massachusetts Dear Mr. Gardiner: This letter is to certify that the new septic system located at 27 Wadsworth Lane was constructed in substantial compliance with the approved design plan entitled,Proposed Septic System Upgrade, dated June 28, 2024, prepared by our office. See attached as-built plan provided by the installer (Robert B. Our Co., Inc.). Should you have any questions or comments, please do not hesitate to contact our office. Sincerely, ?"" John L. Churchill, Jr., PE, PLS President JLC/mcp cc: RHO File AUG 1 6 2024 HEALTH DEPT.