Loading...
HomeMy WebLinkAboutEngineer PlanTOP OF FOUNDA 0'4 20 FT. ARUM FROM CELLAR M. 0 10115 n 10 FT, MWUM 10 FT. MINIMUM FROM SUB OR CRAY& SPACE CONCRETE COVERS 4` SCHEDULE 40 PVC PIPE MIN. PITCH 1/8' PER FT. / �7 /,! 4' CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4- PER FT. FLOW LINE ELEV. _ O -TM' N. 9� 3 ' 0 ELEV. _ CAS ELEV r 9 6' ELEV. BAFFLE I DISTRIBUTION UO°JI Erb OUTIET TE ELEV. BOX .L-� — 4 FEET 14 INCN,:S (TO BE PLACED ON FIRM BASE TO BE YIATER TESTED 5 FEET 6 FEET 19 INCHI"S 24 INCHtS 1500 GALLON IF MORE THAN ONE OUTLET a �� � 34 iN�Es SEPTIC TANK ('O BE PL'''� ON ��' BASS 3/4' TO 1 1/2'-J WASHED STONE j5eC,vCKooi7-2 K TAG tf- t. 7- �-c CLEAN SAND LOAM AND SEED 2' LAYER OF 1/II- TO 1/2' WASHED STONE y MGM CAPACITY INFILTRATORS i1TH ,1 STONE IN AN TMCH FDRMA"TON SOIL ABSORPTION SYSTEM (SAS) • SOIL TEST DATE OF SOIL TEST 9 SOIL TEST DONE BY r c1 r i C WITNESSED BY C• rELLEY OBSERVATION HOLE 1 ELEV.- -99,q- 03SERVA110N HOLE 2 ELEV.- 972 , PERCOLATION RATE La MIN./INCH AT G3 NCHES PERCOLATION RATE .lei_ MN. --NCH AT G3 �cmm NOTTREQUIRED 1 CU. FT. OF - CONCRETE ANCHOR ELEV. / sg' i_ � N ZONE INDEX AD,AIST DEPTH HORIZ TEXTURE COLOR MOTT. OTHER o" °� R zanHy /oyR �ooTs r13„ SANo 31.1 N� 13 LoAlyy /oyR �r �t�►�H/ ,oyR C 1190" NO WATER ENCOUNTERED AT /P?P ,, ELEV. - E 9 , y DEPTH HORIZ TEXTURE COLOR MOTT. OTHER o °�� 'Lo4t4 3% ?OoTS 5gWD G! g Logmy/ /oyR " S9A/D S/d C HED►uf4 /oyR I/fin 5 RAJ. G/d WATER ENCOUNTERED AT /20, ELEV. - -,EZe LEGEND: DESIGN CALCULATIONS SEWAGE DISPOSAL SYSTEM PROFILE USGS PROBABLE WATER TABU ELEV. = EXISTING SPOT ELEVATION 00,�0 NU M"— OF BEDROOMS OBSERVED WATER TABLE ( / / ) ELEY. = EXISTING CONTOUR----00---- NOT TO SCALE BOTTOM OF TEST HOLE' ELEV. _ CAR13AX DISPOSAL UNIT FINAL SPOT ELEVATION TOTAL ESTIMATED FLOW � d FINAL CONTOUR ( 110 GAL./LR./DAY X SR.) 3 . CAL/DAY SOIL TEST LOCATION REQUTFEED SEPTIC TANK CAPACITY CAL UTILITY POLE -0- ACTUA_ SIZE OF SEPTIC TANK 1 CAL TOWN WATER - SOIL CLASSMCATION 1 CATCH BASIN `r'% GAS LINE C — DESIGN PERCOLATION RATE EFFLUENT RATE < 5 MIN. CAL �AY�S.F. CLEAN C. LO?ADING =-� CESSPOOLOUT C.P.0 �LNG ifr(3?(r�y`i 7�'�?-X Ib 4 fZ) SO. FT. LEA 4 ` CAPA IT (AREAy X RATE) � GAL/UAY X RESERVE LEACHING CAPACITY ILL GAL tAY � c. i--( I 10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MNIVW OF V AROUND LEACHING FACILITY AND BE REPLACED MATH MATERIAL AS SPECIFIED IN 310 CNR 15.255: (3� OF �S- jp G T. A. ` CD DUMASj� No. i9 \I 4 PJI NOTES: 1. ALL W MVANSHTP AND MA A SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOY N OF -El e-M Qy T N RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWfAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 8' OF FTMSMD GRADE 1 3. ALL COMPONENTS OF THE SANITARY SYSTEM SMALL SSE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DMVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR "THIN 10 FT. OF DRNES OR PARKING AREAS. 4. ANY IIASONARY UNITS USED TO ST-NG COVERS TO GRADE SHAD. BE M/.f)PTA= IN PLACE. Vi$,.a Y�a..[i ..f 9q.r AS M rgv'll� h1"i i R %AjL A-rC 4S. 0*-4 R / APPLICANT IS TO � CeTA;N SUCIi DE1ERIAINAT?OH FROM APPROPRIATE /',U MOR:TY. 6. UTILITICS t0''`'I ARE APPROr". ATE 0"?LY, EXCAVATION 6O°iTRA6TM IS TO CALL `DN^,-SATE' AT 1-G'--344-7233 AT LEAST 72 HOURS PRIOP TD M^!94C14 3 !!"JT'?G ON Stir_ 7. COYIRACTOR Is TO VERIFY GRADES AND ELEVAT'100,M AS t►'L1L As SITE C0 nMONS PRIOR TO COMINENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMME L IATE LY. D PARCEL IS N FLOOD ZONE �C�� 9. LOT IS SHOWN ON ASSESSORS MAP AS PARCEL Q!/2 APPROVED: BOARD. OF HEALTH f1 • T'f- / PROPOSED SEPTIC DESIGN FOR t1P PROJECT LOCATION L 0 7- //02 G4E.FJu4AAID Y)99>4DVTR tb Ay c r9 h SWEETSER ENGINEERING 235 GREAT WESTERN ROAD P. 0. BOX 713 I 39t]-3922 SOUTH DENNIS, MASS. 02660 t.L DATE 7//7 jm' SCALE 1___j 1 M1 ,pc M REVISED F7- LOCATION MAP R>„SEDISH ET OF / e 100A tr! a rmm. rmrur.