Loading...
HomeMy WebLinkAbout57 Pondview Ave BLDE-23-002366 J(Q Commonwealth of Official Use Only • ' Massachusetts Permit No. BLDE-23-002366 BOARD OF FIRE PREVENTION REGULATIONS Occupancy and Fee Checked • [Rev.1/07] APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code (MEC),527 CMR 12.00 (PLEASE PRINT IN INK OR TYPE ALL INFORMATION) Date:11/1/2022 City or Town of: YARMOUTH To the Inspector of Wires: By this application the undersigned gives notice of his or her intention to perform the electrical work described below. Location(Street&Number) 51457 PONDVIEW AVE Owner or Tenant. KORINKO FRANK J Telephone No. Owner's Address 55 PONDVIEW AVE,WEST YARMOUTH, MA 02673 Is this permit in conjunction with a building permit? Yes 0 No 0 (Check Appropriate Box) Purpose of Building Utility Authorization No. Existing Service Amps Volts Overhead ❑ Undgrd 0 No.of Meters New Service Amps Volts Overhead 0 Undgrd 0 No.of Meters Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: Installation of solar PV system (15 Panels 5.250 KW)(NO ESS)(HOUSE#57) Completion of the following table may be waived by the Inspector of Wires. No.of Recessed Luminaires No.of Ceil.-Susp.(Paddle)Fans No.of Total Transformers KVA No.of Luminaire Outlets No.of Hot Tubs Generators KVA No.of Luminaires Swimming Pool Above ❑ In- ❑ No.of Emergency Lighting grnd. grnd. Battery Units No.of Receptacle Outlets No.of Oil Burners FIRE ALARMS No.of Zones No.of Switches No.of Gas Burners No.of Detection and Initiating Devices No.of Ranges No.of Air Cond. Total No.of Alerting Devices Tons No.of Waste Disposers Heat Pump Number Tons KW No.of Self-Contained Totals: Detection/Alertine Devices No.of Dishwashers Space/Area Heating KW Local ❑ Municipal ❑ Other: Connection No.of Dryers Heating Appliances KW Security Systems:* No.of Devices or Eauivalent No.of Water KW No.of No.of Ballasts Data Wiring: Heaters Signs No.of Devices or Euuivalent No.Hydromassage Bathtubs No.of Motors Total HP Telecommunications Wiring: No.of Devices or Euuivalent OTHER: Attach additional detail if desired,or as required by the Inspector of Wires. Estimated Value of Electrical Work: (When required by municipal policy.) Work to start: Inspection to be requested in accordance with MEC Rule 10,and upon completion. INSURANCE COVERAGE:Unless waived by the owner,no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including"completed operation"coverage or its substantial equivalent.The undersigned certifies that such coverage is in force,and has exhibited proof of same to the permit issuing office. CHECK ONE:INSURANCE 0 BOND 0 OTHER 0 (Specify:) I certify,under the pains and penalties of perjury,that the information on this application is true and complete. FIRM NAME: Matthew T Markham Licensee: Matthew T Markham Signature LIC.NO.: 1136 (If applicable,enter"exempt"in the license number line.) Bus.Tel.No.: Address:24 SAINT MARTIN DR,BLDG 2 UNIT 11,MARLBOROUGH MA 017523060 Alt.Tel.No.: *Per M.G.L.c. 147,s.57-61,security work requires Department of Public Safety"S"License: OWNER'S INSURANCE WAIVER:I am aware that the License does not have the liability insurance coverage normally required by law.But my signature below,I hereby waive this requirement.I am the(check one) 0 owner 0 owner's agent. Owner/Agent Signature Telephone No PERMIT FEE: $150.00 14.1.. Arc) ucbNC "Jnv s,r,= ,Zizbau 140 re Commonwealth o/ 1 aiaachuietti Official Use Only f-- *-= /, Permit No. (13 `23(4.7 yCJ _� .c�1 Department ol3ire.ereicei .=__ Occupancy and Fee Checked � � BOARD OF FIRE PREVENTION REGULATIONS [Rev. 1/07] (leave blank) APPLICATION FOR PERMIT TO PERFORM ELECTRICAL WORK All work to be performed in accordance with the Massachusetts Electrical Code(MEC),527 CMR 12.00 (PLEASE PRINT IN INK OR TYPE ALL INFORMATION) Date: 10/31/2022 City or Town of: Yarmouth To the Inspector of Wires: By this application the undersigned gives notice of his or her intention to perform the electrical work described below. Location(Street&Number) 57 Pondview Ave Owner or Tenant Frank Korinko Telephone No. 774-487-7903 Owner's Address 57 Pondview Ave,Yarmouth, MA 02673 Is this permit in conjunction with a building permit? Yes [Ul No I I (Check Appropriate Box) Purpose of Building residential Utility Authorization No. Existing Service 100 Amps 120 /240 Volts Overhead I-1 Undgrd n No.of Meters 1 New Service Amps / Volts Overhead n Undgrd No.of Meters 1 Number of Feeders and Ampacity Location and Nature of Proposed Electrical Work: roof mounted pv solar panels-5.250Kw system-15 total panels-100A-NO ESS Completion of the following table may be waived by the Inspector of Wires. No.of Recessed Luminaires No.of Cei1.-Susp.(Paddle)Fans Tf T Transformers KVA No.of Luminaire Outlets No.of Hot Tubs Generators KVA No.of Luminaires Swimming Pool Above ❑ In- ❑ No.of Emergency Lighting grnd. grnd. Battery Units No.of Receptacle Outlets No.of Oil Burners FIRE ALARMS No.of Zones No.of Switches No.of Gas Burners No.of Detection and Initiating Devices No.of Ranges No.of Air Cond. Total No.of Alerting Devices Tons No.of Waste Disposers Heat Pump Number Tons KW No.of Self-Contained Totals: Detection/Alerting Devices No.of Dishwashers Space/Area Heating KW Local❑ Municipal Li Other Connection No.of Dryers Heating Appliances KW Security No.o y f Devices or Equivalent No.of Water Kam, No.of No.of Data Wiring: Heaters Signs Ballasts No.of Devices or Equivalent No. H dromassa a Bathtubs No.of Motors Total HP TelecommunicationsNofDeieorWiring:q al y g No.of Devices Equivalent OTHER:roof mounted pv solar panels- 5.250Kw system- 15 total panels- 100A- NO ESS Attach additional detail if desired, or as required by the Inspector of Wires. Estimated Value of Electrical Work: 15049.86 (When required by municipal policy.) Work to Start:upon approval Inspections to be requested in accordance with MEC Rule 10,and upon completion. INSURANCE COVERAGE: Unless waived by the owner,no permit for the performance of electrical work may issue unless the licensee provides proof of liability insurance including"completed operation"coverage or its substantial equivalent. The undersigned certifies that such coverage is in force,and has exhibited proof of same to the permit issuing office. CHECK ONE: INSURANCE ❑ BOND ❑ OTHER ❑ (Specify:) I certify,under the pains and penalties of perjury,that the information on this application is true and complete. FIRM NAME: Freedom Forever Massachusetts LLC -7,� LIC.NO.:902A1 `rL.Licensee: Matthew Markham Signature LIC.NO.:1136MR (If applicable, enter "exempt"in the license number line.) Bus.Tel.No.:774-320-5539 Address: 135 Robert Treat PAine Dr.,Taunton,MA 02780 Alt.Tel.No.: *Per M.G.L.c. 147,s. 57-61,security work requires Department of Public Safety"S"License: Lic.No. OWNER'S INSURANCE WAIVER: I am aware that the Licensee does not have the liability insurance coverage normally required by law. By my signature below, I hereby waive this requirement. I am the(check one)❑owner ❑owner's agent. Owner/Agent Signature Telephone No. PERMIT FEE: $ - oozes BARUN CORP October 29,2022 RE: CERTIFICATION LETTER Project Address: KORINKO RESIDENCE 57 PONDVIEW AVE YARMOUTH,MA 2673 Design Criteria: -Applicable Codes=2018 IEBC/IBC,2018 IRC,ASCE 7-16 and 2018 NOS -Risk Category=II -Wind Speed=140 mph,Exposure Category C,Partially/Fully Enclosed Method -Ground Snow Load=30 psf -Roof 1:2 x 6 At 16"OC,Roof DL=8 psf,Roof LL/SL=25 psf(Non-PV),Roof LASE=20.8 psf(PV) To Whom It May Concern, A structural evaluation of loading was conducted for the above address based on the design criteria listed above. Existing roof structural framing has been reviewed for additional loading due to installation of Solar PV System on the roof.The structural review applies to the sections of roof that is directly supporting the Solar PV System. Based on this evaluation,I certify that the alteration to the existing structure by installation of the Solar PV System meets the prescriptive compliance requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally,the Solar PV System assembly(including attachment hardware)has been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed the requirements set forth by the referenced codes. Sincerely, .�'`-`s Avia I Digitally signed (7. AL Luw►cu(' c by Avial Lumagui H Lumagu No. 57691 Date:2022.10.29 • 144s/oNAL ' I 08:28:47-04'00' ..... 1/5 ,• BARUN CORP RESULTS SUMMARY KORINKO RESIDENCE, 57 PONDVIEW AVE, YARMOUTH, MA 2673 MOUNTING PLANE STRUCTURAL EVALUATION MOUNTING PLANE ROOF PITCH RESULT GOVERNING ANALYSIS Roof 1 20° OK IEBC IMPACT CHECK STANDOFF HARDWARE EVALUATION FOR WIND UPLIFT MOUNTING PLANE WIND UPLIFT DCR Roof 1 28.4% Limits of Scope of Work and Liability: The existing structure has been reviewed based on the assumption that it has been originally designed and constructed per appropriate codes. The structural analysis of the subject property is based on the provided site survey data. The calculations produced for this structure's assessment ore only for the roof framing supporting the proposed PV installation referenced in the stamped planset and were made according to generally recognized structural analysis standards and procedures. All PV modules, racking and attachment components shall be designed and installed per manufacturer's approved guidelines and specifications. These plans are not stamped for water leakage or existing damage to the structural component that was not accessed during the site survey. Prior to commencement of work, the PV system installer should verify that the existing roof and connections are in suitable condition and inspect framing noted on the certification letter and inform the Engineer of Record of any discrepancies prior to installation. The installer should also check for any damages such as water damage, cracked framing, etc. and inform the Engineer of Record of existing deficiencies which are unknown and/or were not observable during the time of survey and have not been included in this scope of work. Any change in the scope of the work shall not be accepted unless such change, addition, or deletion is approved in advance and in writing by the Engineer of Record. Barun Corp ( Design and Engineering 1610.202.4506 I chrisk@baruncorp.com I www.baruncorp.com 2/5 BARUN CORP LOAD CALCULATION Roof 1 KORINKO RESIDENCE,57 PONDVIEW AVE,YARMOUTH,MA 2673 PV PANELS DEAD LOAD(PV-DL) PV Panels Weight =2.50 psf Hardware Assembly Weight =0.50 psf Total PV Panels Weight PV-DL=3.00 psf ROOF DEAD LOAD(R-DL) Existing Roofing Material Weight Composite Shingle Roof 1 Layer(s) =2.50 psf Underlayment Weight =0.50 psf Ptywood/OSB Sheathing Weight =1.50 psf Framing Weight 2 x fi t 16 in.O.C. =1.72 psf No Vaulted Ceiling =0.00 psf Miscellaneous =1.50 psf Total Roof Dead Load R-DL=7.70 psf REDUCED ROOF LIVE LOAD(Lr) Roof Live Load Lo=20.00 psf Member Tributary Area At<200 ft' Roof 1 Pitch 20'or 5/12 Tributary Area Reduction Factor R1=1.00 Roof Slope Reduction Factor R2=0.98 Reduced Roof Live Load,Lr=Lo(R1)(R2) Lr=19.50 psf SNOW LOAD Ground Snow Load pg=30.00 psf Effective Roof Slope 20' Snow Importance Factor Is=1.00 Snow Exposure Factor Ce=1.00 Snow Thermal Factor Ct=1.10 Minimum Flat Roof Snow Load pf-min=25.00 psf Flat Roof Snow Load pf=25.00 psf SLOPED ROOF SNOW LOAD ON ROOF(Non-Slippery Surfaces) Roof Slope Factor Cs-roof=1.00 Sloped Roof Snow Load on Roof ps-roof=25.00 psf SLOPED ROOF SNOW LOAD ON PV PANELS(Unobstructed Slippery Surfaces) Roof Slope Factor Cs-PV=0.83 Sloped Roof Snow Load on PV Panels ps-PV=20.80 psf ga�t;o r nncr, a^d Enginee rnq 6'n.202.4506 r hri skebarr ,rp.rorn www.bar,ncoro c.om 3/5 f IEBC IMPACT CHECK BARUN CORP Roof 1 KORINKO RESIDENCE, 57 PONDVIEW AVE, YARMOUTH, MA 2673 EXISTING ►'aerMPA aA` IIL . Roof Dead Load (DL) = 7.70 10.70 psf Roof Live Load (Lr) = 19.50 0.00 psf Roof Snow Load (SL) = 25.00 20.80 psf (DL + Lr)/Cd = 21.76 11.89 psf (DL + SL)/Cd = 28.43 27.39 psf Maximum Gravity Load = 28.43 27.39 psf Load Increase (%) = -3.67% OK The requirements of section 807.4 of 2015 IEBC are met and the structure is permitted to remain unaltered. Barun Corp I Design and Engineering 1610.202.4506 I chrisk©baruncorp.com www.baruncorp.com 4/5 BARD N CORP WIND UPLIFT CALCULATION Roof 1 KORINKO RESIDENCE,57 PONDVIEW AVE,YARMOUTH,MA 2673 SITE INFORMATION Ultimate Wind Speed= 140.00 mph Roof Pitch= 20° Risk Category= II Roof Type= Gable Exposure Category= C Velocity Pressure Exposure Coefficient,Kz= 0.90 Mean Roof Height= 20.00 ft Topographic Factor,Kzt= 1.00 Solar Array Dead Load= 3.00 psf Wind Directionality Factor, Kd= 0.85 a= 4.50 ft Ground Elevation Factor, Ke= 1.00 DESIGN CALCULATIONS Wind Velocity Pressure,qh= 38.47 psf (0.00256*Kz*Kzt*Kd*Ke*(V^2)) Solar Array Pressure Equalization Factor,ya= 0.60 Hardware Type= 0 Allowable Load= 982.50 lbs S.Pine,5/16"Lag Screw x 1,2.5"Embedment Array Edge Factor,yE= 1.50 Exposed Condition Max.X-Spacing(Zone 1&2e)= 1.33 ft Effective Wind Area Max.Y-Spacing(Zone 1&2e)= 2.87 ft 3.82 ft2 Max.X-Spacing(Zone 2n-3e)= 1.33 ft Effective Wind Area Max.Y-Spacing(Zone 2n-3e)= 2.87 ft 3.82 ft2 Max.X-Spacing(Zone 3r)= 1.33 ft Effective Wind Area Max.Y-Spacing(Zone 3r)= 2.87 ft 3.82 ft2 ROOF ZONE GCp(-)UPLIFT UPLIFT PRESSURE PULLOUT FORCE ■ 1&2e -2.00 -39.86 psf 152.25 lbs 2n-3e -3.00 -60.63 psf 231.61 lbs 3r -3.60 -73.09 psf 279.22 lbs NOTE: •Wind calculation is based on ASCE 7-16,29.4-C&C,LC#7:0.6DL+0.6WL is used.