HomeMy WebLinkAboutBLD-23-001739 Yq TOWN OF YARMOUTH Buildin Department ���/� "( �C
04 R,y (508)3 8-22;'ext.1261 BUILDING
p-",41 dm- f PERMIT NO BLD-23-001739 /�up"-- PERMIT
0 ISSUE DATE 10/05/2022 J B WEATHER CARD
APPLICANT Michael Payton PERMIT TO
AT(LOCATION) 1175 ROUTE 28.SOUTH YARMOUTH,MA 02664 ZONING DISTRICT Bldg.Type:
SUBDIVISION MAP BLOCK LOT 060.270 BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS Fire Protection-Renovation to the existing fire protection system on 1st floor CONTRACTOR
per plans(508-378-7212) LICENSE
AREA(SO FT) 16,716,759,8 EST COST(S) 300000.00 PERMIT FEE($) 50.00
OWNER TOWN OF YARMOUTH BUILDING DEPT BY
ADDRESS 1146 ROUTE 28
SOUTH YARMOUTH MA 02664-4463 ' PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET,ALLEY 0 SIDEWALK OR ANY PART THEREOF,EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION, STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS.THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK:1)FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR
FOOTINGS.2)PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE.WHERE ELECTRICAL PLUMBING/GAS
MEMBERS(READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL
3)FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED,SUCH BUILDING SHALL NOT BE INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION AftOVF