Loading...
HomeMy WebLinkAboutReview Checklist TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: A.M. Lot ?`/- I u o Zone of Contribution: In Out Acreage Commercial: Residential: ,/ Street: 37 a h�t r Village: t_), /, Floor Plan: #Bedrooms: Owner: Ca r(a5 ,�f -7 M 1 j Installer: rig, ILL ,� , Address: ;o9S Aro►� C± £L 1- , - Phone: cbg- a?y-Y �, ?S3 Phone: Builder: Engineer: P To c-Eve-lee Address: Phone: SUS- ' '? 7. 5- 3 i 3 Phone: N/A YES NO 1.Required#of copies received IZ 2.Date of soils exam and percolation test not older than 2 years V 3. 4-5 ft of naturally occurring pervious material,above water table V 4.Foundation 2 ft above high point of road H.P.: Fnd: Var.: (/ 5.Water line 10 ft from septic components Var.: ✓ 6. Benchmark indicated and shown-NGVD if near wetlands (/ 7. Septic tank minimum 10 ft from foundation,deck Var.: ,/ 8.Leaching minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: ✓ 9. Leaching minimum 100 ft from wetlands Var.: V 10.Leaching minimum 150 ft from drinking well/25 ft irrigation well Var.: ,/ 11.Tank/leaching minimum 10 ft from property line Var.: ✓ 12. System meets all other setback requirements Var.: 13.Uses adjustment for maximum high groundwater Var.: ✓ 14. Leaching set 4-5 ft above adj. water or bottom of test hole Var.: V 15. System not in top or subsoil(A,B horizons)or 5' removal L/ 16.Proposed contours are suitable ✓ 17. System meets slope requirements-min. 1/8", ''/a"preferred / V 18. System meets breakout requirements PVC liner: iy Wall: 19. Specified tee sizes are proper, gas baffle on outlet tee ✓ 20. Sewage is under 10,000 gpd for parcel 21.No garbage disposal ✓ 22. System adequately sized for its intended use ,/ 23.Minimum 6"stone or compacted below tank and dbox Z 24.Manhole covers within 6"of grade,pump chamber cover to grade L/ 25.Inspection port on plastic chambers/leach field ,/ 26. Electrical permit for pump chamber/Separate meter for duplexes L/ 27.Pump system-2"line,weep hole,check valve,tee in dbox,pump size ✓ 28. Septic tank/pump chamber to be factory waterproofed ✓ 29.Vent provided if leaching below 3 feet,under driveway/parking ,/ 30. Buoyancy calculations for tank/pump chamber V 31. Engineer to inspect and certify soils: wall: commercial: V 32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature V _ 33.H-20 loading is subject to vehicular traffic,groundwater v 34.Title V Application and permit fee,installer signature 35. Foundation footing min. 2 feet above adjusted ground water for new house ✓ / 36.Deed Restriction required max. #bedrooms: max. flow: gpd / ✓ 37. Check area lots for groundwater/Label groundw "n sessor's Map Plan reviewed by: d a t( I 6/03/03