HomeMy WebLinkAboutEngineer Certification Letter /
JC ENGINEERING Inc.
Civil & Environmental Engineering
4% 0 � 0� 2854 Cranberry Highway
( East Wareham, Massachusetts 02538
Ph. 508-273-0377
April 30. 2024
Mr. Jay Gardiner
Health Director
Town of Yarmouth
Health.Division
1146 Route 28
South Yarmouth, MA 02664
RE: Substantial Compliance for Newly Installed Septic System Located at
300 Buck Island Road (Building 20), West Yarmouth,Massachusetts
Dear Mr. Gardiner:
This letter is to certify that the new septic system located at 300 Buck Island Road (Building
20) was constructed in substantial compliance with the approved design plan entitled,
Proposed Septic System Upgrade, dated November 6, 2023, prepared by our office. See
attached as-built plan provided by the installer(Speakman Excavating LLC).
Should you have any questions or comments, please do not hesitate to contact our office.
Sincerely,
John L. Churchill, Jr., PE, PLS
President
JLC/mcp
cc: File
MAY , C 207.4