HomeMy WebLinkAboutEngineer Certification Letter Engineering Works, Inc.
Civil Engineers-Surveyors-Soil Evaluators
12 West Crossfield Road, Forestiale, MA 02644 Tel/fax (508)477-5313
Jay Gardlner- Health Director July 29, 2024
Yarmouth Board of Health
1146 Route 28
South Yarmouth, MA 02664
Re: 48 Great Western Rd, South Yarmouth - Septic Upgrade, Map ID: 100-37
Dear Mr. Gardiner,
As per your request and in accordance with 310 CMR 15.021(3) of the State
Environmental Code-Title 5, an as-built review of the septic system at the subject site
has been conducted. I hereby certify that the Sanitary Subsurface Disposal System
has been installed in substantial compliance with the design plan by Engineering
Works, Inc., dated 7/15/24. The septic system consists of an existing 1000 gallon
septic tank, new distribution box and 2-500 gallon precast chambers surrounded with
stone.
Should you have any questions, please do not hesitate to call.
Sincerely,
C--)
Peter T. McEntee P.E.
AUG n G 2024
HEALTH DEPT.