Loading...
HomeMy WebLinkAbout_NOI (Compiled w Plans & SW Report-O&M)_Standish_22108 NOTICE OF INTENT Site MC-3 – Standish Way Yarmouth, MA YARMOUTH STORMWATER DESIGN AND IMPLEMENTATION PROJECT September 2024 PREPARED FOR: Jeffery Colby, P.E., DPW Director Town of Yarmouth 1146 Route 28 South Yarmouth, MA 02664 PREPARED BY: PROJECT FUNDERS: This project has been supported by the Office of Coastal Zone Management Coastal Habitat and Water Quality grant program. In addition, this project was designed in collaboration with the Association to Preserve Cape Cod and the Town of Yarmouth, with intent to be submitted for construction sponsorship under the Cape Cod Water Resources Restoration Project, a joint initiative by the USDA Natural Resources Conservation Service and the Cape Cod Conservation District. Contents Cover Letter Notice of Intent Forms WPA Form 3 NOI Wetland Fee Transmittal Form Local Forms NOI Administrative Checklist Site Access Authorization Form 21-Day Waiver Abutters Notification Certified List of Abutters Notification to Abutters Affidavit of Service Project Narrative Attachments Attachment A – Locus Maps Figure 1 – USGS Topographic Map Figure 2 – Aerial Map Figure 3 – FEMA Flood Insurance Rate Map Figure 4 – Environmental Constraints Map Figure 5 – Soils Map Figure 6 – Environmental Justice Communities Figure 7 – Impaired Waters Attachment B – Project Plans (reduce size; full-size bound separately) Attachment C – Stormwater Report (electronic copy sent to Conservation for distribution) horsleywitten.com September 19, 2024 Yarmouth Conservation Commission c/o Brittany DiRienzo, Conservation Administrator 1146 Route 28 South Yarmouth, MA 02664 Re: Notice of Intent – Yarmouth Stormwater Retrofit Design and Implementation Project Standish Way (Site MC-3), Yarmouth, Massachusetts Dear Members of the Conservation Commission: On behalf of the Applicant, the Town of Yarmouth, the Horsley Witten Group, Inc. (HW) is submitting the enclosed Notice of Intent (NOI) and supporting materials for the stormwater management systems proposed along Standish Way in Yarmouth, MA. This project has been supported by the Office of Coastal Zone Management Coastal Habitat and Water Quality grant program. This project was designed in collaboration with the Association to Preserve Cape Cod (APCC) and the Town of Yarmouth, with the intent to be submitted for construction sponsorship under the Cape Cod Water Resources Restoration Project (CCWRRP), a joint initiative by the USDA Natural Resources Conservation Service (NRCS) and the Cape Cod Conservation District (CCCD). Since the proposed stormwater management system is a retrofit project undertaken solely to improve water quality at the site, it falls under the redevelopment category in accordance with the Massachusetts Stormwater Management Standards (MASMS 2008), as described in Massachusetts Stormwater Handbook, Volume 1 Chapter 1. As a redevelopment project, the design is required to meet the MASMS standards to the maximum extent practicable (MEP). In addition to the MASMS, the project meets the NRCS Conservation Practice Standard (CPS) Tree- Shrub Site Preparation (Code 490) (NRCS 2021), Stormwater Runoff Control (Code 570) (with the exception of pretreatment) (NRCS 2023), and Tree-Shrub Establishment (Code 612) (NRCS 2016) A portion of the project falls within in the outer 100-200-foot Riverfront Area and within the coastal floodzone (Land Subject to Coastal Storm Flowage), jurisdictional resource areas protected and regulated under the Massachusetts Wetlands Protection Act (M.G.L. Ch. 131 § 40) and/or the Town of Yarmouth Wetlands Protection Bylaw. However, the majority of the work is planned outside of these jurisdictional areas while still providing substantial water quality and habitat benefits to the downgradient resource areas. Yarmouth Conservation Commission September 19, 2024 Page 2 of 2 horsleywitten.com Detailed information about the proposed project is provided in the enclosed site plans, titled “Site MC-3: Standish Way Road Stormwater Retrofit Design and Implementation Project – Permitting 75% Design Plans, Yarmouth, Massachusetts,” dated September 2024, and is further elaborated in the attached project narrative. Enclosed please find one complete copy of the NOI application and supporting documentation, as well as one original and six copies (seven total) of the full-sized engineering plans. All materials have been uploaded to the Massachusetts Department of Environmental Protection (MassDEP) eDEP portal, and an electronic copy has also been sent to the Commission. As this is a municipal project, it is exempt from state and local wetlands filing fees. Notification of the pending public hearing has been sent to abutters in accordance with state and local filing regulations. We respectfully request that this project be placed on Commission’s October 3, 2024, public hearing agenda. Thank you in advance for your review of this NOI application. If you have any questions and/or require additional information pertaining to this submittal, please contact me at (508) 833-6600 or at mwest@horsleywitten.com. We look forward to meeting with you for a public hearing next month. Sincerely, Horsley Witten Group, Inc. Michelle West, P.E. Project Manager Enclosures cc: MassDEP, Southeast Regional Office Jeffrey Colby, P.E., DPW Director, Town of Yarmouth Amanda Lima, P.E., Yarmouth Town Engineer Nathan L. Whetten, P.E., C.G., Town of Yarmouth DPW Jordan Mora, Association to Preserve Cape Cod (APCC) April Wobst, APCC Eliza Fitzgerald, APCC Lisa Petruski, USDA Natural Resource Conservation Service (NRCS) Simone Wright, Cape Cod Conservation District (CCCD) Massachusetts Department of Environmental Protection eDEP Transaction Copy Here is the file you requested for your records. To retain a copy of this file you must save and/or print. Username: Transaction ID: Document: Size of File: Status of Transaction: Date and Time Created: Note: This file only includes forms that were part of your transaction as of the date and time indicated above. If you need a more current copy of your transaction, return to eDEP and select to “Download a Copy” from the Current Submittals page. 1739280 9/18/2024:10:43:58 AM 275.95K 90ROUTE6AEDEP WPA Form 3 - NOI In Process a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)­(q) and check if: A.General Information 1. Project Location: a. Street Address STANDISH WAY b. City/Town YARMOUTH c. Zip Code 02673 d. Latitude 41.64734N e. Longitude 70.25586W f. Map/Plat #21 g.Parcel/Lot #30 2. Applicant: Individual Organization a. First Name JEFFREY b.Last Name COLBY c. Organization TOWN OF YARMOUTH d. Mailing Address 1146 ROUTE 28 e. City/Town SOUTH YARMOUTH f. State MA g. Zip Code 02664 h. Phone Number 508­398­2231 i. Fax j. Email Jcolby@yarmouth.ma.us 3.Property Owner: more than one owner a. First Name JEFFERY b. Last Name COLBY c. Organization TOWN OF YARMOUTH d. Mailing Address 1146 ROUTE 28 e. City/Town SOUTH YARMOUTH f.State MA g. Zip Code 02664 h. Phone Number 508­398­2231 i. Fax j.Email Jcolby@yarmouth.ma.us 4.Representative: a. First Name MICHELLE b. Last Name WEST c. Organization HORSLEY WITTEN GROUP, INC. d. Mailing Address 90 ROUTE 6A, UNIT 1 e. City/Town SANDWICH f. State MA g. Zip Code 02563 h.Phone Number 508­833­6600 i.Fax j.Email Mwest@horsleywitten.com 5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form): a.Total Fee Paid 0.00 b.State Fee Paid 0.00 c.City/Town Fee Paid 0.00 6.General Project Description: MANAGE AND TREAT STORMWATER RUNOFF FROM STANDISH WAY USING GREEN STORMWATER INFRASTURCTURE (GSI) INCLUDING A INFILTRATION, BIORETENTION AREA, AND POROUS PAVEMENT TO REDUCE THE AMOUNT OF POLLUTANTS ENTERING LEWIS BAY. 7a.Project Type: 1. Single Family Home 2. Residential Subdivision 3.Limited Project Driveway Crossing 4.Commercial/Industrial 5.Dock/Pier 6.Utilities 7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry) 9.Transportation 10.Other 7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)? 1.Yes No If yes, describe which limited project applies to this project: 2. Limited Project 8.Property recorded at the Registry of Deeds for: a.County:b.Certificate:c.Book:d.Page: BARNSTABLE D771319 0 B. Buffer Zone & Resource Area Impacts (temporary & permanent) 1.Buffer Zone & Resource Area Impacts (temporary & permanent): This is a Buffer Zone only project ­ Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2.Inland Resource Areas: (See 310 CMR 10.54 ­ 10.58, if not applicable, go to Section B.3. Coastal Resource Areas) Resource Area Size of Proposed Alteration Proposed Replacement (if any) a.Bank 1. linear feet 2. linear feet b.Bordering Vegetated Wetland 1. square feet 2. square feet c.Land under Waterbodies and Waterways 1. Square feet 2. square feet 3. cubic yards dredged d.Bordering Land Subject to Flooding 1. square feet 2. square feet 3. cubic feet of flood storage lost 4. cubic feet replaced e.Isolated Land Subject to Flooding 1. square feet 2. cubic feet of flood storage lost 3. cubic feet replaced f.Riverfront Area 1. Name of Waterway (if any) 2. Width of Riverfront Area (check one)25 ft. ­ Designated Densely Developed Areas only 100 ft. ­ New agricultural projects only 200 ft. ­ All other projects 3. Total area of Riverfront Area on the site of the proposed project square feet 4. Proposed Alteration of the Riverfront Area: 990 a. total square feet 0 b. square feet within 100 ft. 990 c. square feet between 100 ft. and 200 ft. 5. Has an alternatives analysis been done and is it attached to this NOI?Yes No 6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No 3.Coastal Resource Areas: (See 310 CMR 10.25 ­ 10.35) Resource Area Size of Proposed Alteration Proposed Replacement (if any) a.Designated Port Areas Indicate size under Land under the ocean below, b.Land Under the Ocean 1. square feet 2. cubic yards dredged c.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, below d.Coastal Beaches 1. square feet 2. cubic yards beach nourishment e.Coastal Dunes 1. square feet 2. cubic yards dune nourishment f.Coastal Banks 1. linear feet g.Rocky Intertidal Shores 1. square feet h.Salt Marshes 1. square feet 2. sq ft restoration, rehab, crea. i.Land Under Salt Ponds 1. square feet 2. cubic yards dredged j.Land Containing Shellfish 1. square feet k.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1. cubic yards dredged l.Land Subject to Coastal Storm Flowage 5700 1. square feet 4.Restoration/Enhancement  Restoration/Replacement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please entered the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 5.Projects Involves Stream Crossings  Project Involves Streams Crossings If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings. a. number of new stream crossings b. number of replacement stream crossings C. Other Applicable Standards and Requirements Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State­Listed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program (NHESP)? a.Yes No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 1 Rabbit Hill Road Westborough, MA 01581 b. Date of map:FROM MAP VIEWER If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18).... c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply) 1. Percentage/acreage of property to be altered: (a) within Wetland Resource Area percentage/acreage (b) outside Resource Area percentage/acreage 2. Assessor's Map or right­of­way plan of site 3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work ** a.Project description (including description of impacts outside of wetland resource area & buffer zone) b. Photographs representative of the site c. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/natural­heritage/regulatory­ review/mass­endangered­species­act­mesa/mesa­fee­schedule.html ) Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above address Projects altering 10 or more acres of land, also submit: d.Vegetation cover type map of site e.Project plans showing Priority & Estimated Habitat boundaries d. OR Check One of the following 1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/laws­regulations/cmr/321­cmr­1000­massachusetts­endangered­ species­act.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2. Separate MESA review ongoing. a. NHESP Tracking Number b. Date submitted to NHESP 3.Separate MESA review completed. Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan. *Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review... 2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run? a. Not applicable ­ project is in inland resource area only b.Yes No If yes, include proof of mailing or hand delivery of NOI to either: South Shore ­ Cohasset to Rhode Island, and the Cape & Islands: Division of Marine Fisheries ­  Southeast Marine Fisheries Station Attn: Environmental Reviewer 836 S. Rodney French Blvd  New Bedford, MA 02744 North Shore ­ Hull to New Hampshire: Division of Marine Fisheries ­  North Shore Office Attn: Environmental Reviewer 30 Emerson Avenue Gloucester, MA 01930 If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office. 3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a.Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP Website for ACEC locations). Note: electronic filers click on Website. b. ACEC Name 4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? a.Yes No 5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)? a.Yes No 6.Is this project subject to provisions of the MassDEP Stormwater Management Standards? 1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol.2, Chapter 3) 2.A portion of the site constitutes redevelopment 3.Proprietary BMPs are included in the Stormwater Management System b.No, Explain why the project is exempt: 1.Single Family Home 2.Emergency Road Repair 3.Small Residential Subdivision (less than or equal to 4 single­family houses or less than or equal to 4 units in multi­family housing project) with no discharge to Critical Areas. D. Additional Information Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department by regular mail delivery. 1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. 3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s). Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4.List the titles and dates for all plans and other materials submitted with this NOI. a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale: SITE MC­3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT ­ 75% DESIGN YARMOUTH, MASSACHUSETTS HORSLEY WITTEN GROUP, INC.RICHARD CLAYTOR, P.E.AUGUST 2024 1"=10' STORMWATER MANAGEMENT REPORT ­ STANDISH WAY YARMOUTH, MA/STORMWATER CHECKLIST HORSLEY WITTEN GROUP, INC SEPTEMBER 2024 SITE MC­3 STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT YARMOUTH, MASSACHUSETTS ­ EXISTING CONDITIONS PLAN HORSLEY WITTEN GROUP, INC.DANIEL MACKENZIE, PLS MARCH, 2024 1"=30' 5.If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8.Attach NOI Wetland Fee Transmittal Form. 9.Attach Stormwater Report, if needed. E. Fees 1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 2. Municipal Check Number 3. Check date 4. State Check Number 5. Check date 6. Payer name on check: First Name 7. Payer name on check: Last Name F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. 1. Signature of Applicant 2. Date 3. Signature of Property Owner(if different)4. Date 5. Signature of Representative (if any)6. Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the "yes" box in Section C, Items 1­3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 3 ­ Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #: eDEP Transaction #:1739280 City/Town:YARMOUTH Page 1 of 8 * ELECTRONIC COPY a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)­(q) and check if: A.General Information1. Project Location:a. Street Address STANDISH WAYb. City/Town YARMOUTH c. Zip Code 02673d. Latitude 41.64734N e. Longitude 70.25586Wf. Map/Plat #21 g.Parcel/Lot #302. Applicant:Individual Organizationa. First Name JEFFREY b.Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f. State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j. Email Jcolby@yarmouth.ma.us3.Property Owner:more than one ownera. First Name JEFFERY b. Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f.State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j.Email Jcolby@yarmouth.ma.us4.Representative:a. First Name MICHELLE b. Last Name WESTc. Organization HORSLEY WITTEN GROUP, INC.d. Mailing Address 90 ROUTE 6A, UNIT 1e. City/Town SANDWICH f. State MA g. Zip Code 02563h.Phone Number 508­833­6600 i.Fax j.Email Mwest@horsleywitten.com5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):a.Total Fee Paid 0.00 b.State Fee Paid 0.00 c.City/Town Fee Paid 0.00 6.General Project Description: MANAGE AND TREAT STORMWATER RUNOFF FROM STANDISH WAY USING GREEN STORMWATER INFRASTURCTURE (GSI) INCLUDING A INFILTRATION, BIORETENTION AREA, AND POROUS PAVEMENT TO REDUCE THE AMOUNT OF POLLUTANTS ENTERING LEWIS BAY. 7a.Project Type: 1. Single Family Home 2. Residential Subdivision 3.Limited Project Driveway Crossing 4.Commercial/Industrial 5.Dock/Pier 6.Utilities 7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry) 9.Transportation 10.Other 7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310 CMR 10.53 (inland)? 1.Yes No If yes, describe which limited project applies to this project: 2. Limited Project 8.Property recorded at the Registry of Deeds for: a.County:b.Certificate:c.Book:d.Page: BARNSTABLE D771319 0 B. Buffer Zone & Resource Area Impacts (temporary & permanent) 1.Buffer Zone & Resource Area Impacts (temporary & permanent): This is a Buffer Zone only project ­ Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland, Inland Bank, or Coastal Resource Area. 2.Inland Resource Areas: (See 310 CMR 10.54 ­ 10.58, if not applicable, go to Section B.3. Coastal Resource Areas) Resource Area Size of Proposed Alteration Proposed Replacement (if any) a.Bank 1. linear feet 2. linear feet b.Bordering Vegetated Wetland 1. square feet 2. square feet c.Land under Waterbodies and Waterways 1. Square feet 2. square feet 3. cubic yards dredged d.Bordering Land Subject to Flooding 1. square feet 2. square feet 3. cubic feet of flood storage lost 4. cubic feet replaced e.Isolated Land Subject to Flooding 1. square feet 2. cubic feet of flood storage lost 3. cubic feet replaced f.Riverfront Area 1. Name of Waterway (if any) 2. Width of Riverfront Area (check one)25 ft. ­ Designated Densely Developed Areas only 100 ft. ­ New agricultural projects only 200 ft. ­ All other projects 3. Total area of Riverfront Area on the site of the proposed project square feet 4. Proposed Alteration of the Riverfront Area: 990 a. total square feet 0 b. square feet within 100 ft. 990 c. square feet between 100 ft. and 200 ft. 5. Has an alternatives analysis been done and is it attached to this NOI?Yes No 6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No 3.Coastal Resource Areas: (See 310 CMR 10.25 ­ 10.35) Resource Area Size of Proposed Alteration Proposed Replacement (if any) a.Designated Port Areas Indicate size under Land under the ocean below, b.Land Under the Ocean 1. square feet 2. cubic yards dredged c.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, below d.Coastal Beaches 1. square feet 2. cubic yards beach nourishment e.Coastal Dunes 1. square feet 2. cubic yards dune nourishment f.Coastal Banks 1. linear feet g.Rocky Intertidal Shores 1. square feet h.Salt Marshes 1. square feet 2. sq ft restoration, rehab, crea. i.Land Under Salt Ponds 1. square feet 2. cubic yards dredged j.Land Containing Shellfish 1. square feet k.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1. cubic yards dredged l.Land Subject to Coastal Storm Flowage 5700 1. square feet 4.Restoration/Enhancement  Restoration/Replacement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please entered the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 5.Projects Involves Stream Crossings  Project Involves Streams Crossings If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings. a. number of new stream crossings b. number of replacement stream crossings C. Other Applicable Standards and Requirements Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State­Listed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program (NHESP)? a.Yes No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 1 Rabbit Hill Road Westborough, MA 01581 b. Date of map:FROM MAP VIEWER If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18).... c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply) 1. Percentage/acreage of property to be altered: (a) within Wetland Resource Area percentage/acreage (b) outside Resource Area percentage/acreage 2. Assessor's Map or right­of­way plan of site 3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work ** a.Project description (including description of impacts outside of wetland resource area & buffer zone) b. Photographs representative of the site c. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/natural­heritage/regulatory­ review/mass­endangered­species­act­mesa/mesa­fee­schedule.html ) Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above address Projects altering 10 or more acres of land, also submit: d.Vegetation cover type map of site e.Project plans showing Priority & Estimated Habitat boundaries d. OR Check One of the following 1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/laws­regulations/cmr/321­cmr­1000­massachusetts­endangered­ species­act.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2. Separate MESA review ongoing. a. NHESP Tracking Number b. Date submitted to NHESP 3.Separate MESA review completed. Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan. *Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review... 2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run? a. Not applicable ­ project is in inland resource area only b.Yes No If yes, include proof of mailing or hand delivery of NOI to either: South Shore ­ Cohasset to Rhode Island, and the Cape & Islands: Division of Marine Fisheries ­  Southeast Marine Fisheries Station Attn: Environmental Reviewer 836 S. Rodney French Blvd  New Bedford, MA 02744 North Shore ­ Hull to New Hampshire: Division of Marine Fisheries ­  North Shore Office Attn: Environmental Reviewer 30 Emerson Avenue Gloucester, MA 01930 If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office. 3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a.Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP Website for ACEC locations). Note: electronic filers click on Website. b. ACEC Name 4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? a.Yes No 5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)? a.Yes No 6.Is this project subject to provisions of the MassDEP Stormwater Management Standards? 1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol.2, Chapter 3) 2.A portion of the site constitutes redevelopment 3.Proprietary BMPs are included in the Stormwater Management System b.No, Explain why the project is exempt: 1.Single Family Home 2.Emergency Road Repair 3.Small Residential Subdivision (less than or equal to 4 single­family houses or less than or equal to 4 units in multi­family housing project) with no discharge to Critical Areas. D. Additional Information Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department by regular mail delivery. 1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. 3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s). Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4.List the titles and dates for all plans and other materials submitted with this NOI. a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale: SITE MC­3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT ­ 75% DESIGN YARMOUTH, MASSACHUSETTS HORSLEY WITTEN GROUP, INC.RICHARD CLAYTOR, P.E.AUGUST 2024 1"=10' STORMWATER MANAGEMENT REPORT ­ STANDISH WAY YARMOUTH, MA/STORMWATER CHECKLIST HORSLEY WITTEN GROUP, INC SEPTEMBER 2024 SITE MC­3 STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT YARMOUTH, MASSACHUSETTS ­ EXISTING CONDITIONS PLAN HORSLEY WITTEN GROUP, INC.DANIEL MACKENZIE, PLS MARCH, 2024 1"=30' 5.If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8.Attach NOI Wetland Fee Transmittal Form. 9.Attach Stormwater Report, if needed. E. Fees 1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 2. Municipal Check Number 3. Check date 4. State Check Number 5. Check date 6. Payer name on check: First Name 7. Payer name on check: Last Name F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. 1. Signature of Applicant 2. Date 3. Signature of Property Owner(if different)4. Date 5. Signature of Representative (if any)6. Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the "yes" box in Section C, Items 1­3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 3 ­ Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #: eDEP Transaction #:1739280 City/Town:YARMOUTH Page 2 of 8 * ELECTRONIC COPY a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)­(q) and check if: A.General Information1. Project Location:a. Street Address STANDISH WAYb. City/Town YARMOUTH c. Zip Code 02673d. Latitude 41.64734N e. Longitude 70.25586Wf. Map/Plat #21 g.Parcel/Lot #302. Applicant:Individual Organizationa. First Name JEFFREY b.Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f. State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j. Email Jcolby@yarmouth.ma.us3.Property Owner:more than one ownera. First Name JEFFERY b. Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f.State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j.Email Jcolby@yarmouth.ma.us4.Representative:a. First Name MICHELLE b. Last Name WESTc. Organization HORSLEY WITTEN GROUP, INC.d. Mailing Address 90 ROUTE 6A, UNIT 1e. City/Town SANDWICH f. State MA g. Zip Code 02563h.Phone Number 508­833­6600 i.Fax j.Email Mwest@horsleywitten.com5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):a.Total Fee Paid 0.00 b.State Fee Paid 0.00 c.City/Town Fee Paid 0.006.General Project Description:MANAGE AND TREAT STORMWATER RUNOFF FROM STANDISH WAY USING GREEN STORMWATERINFRASTURCTURE (GSI) INCLUDING A INFILTRATION, BIORETENTION AREA, AND POROUS PAVEMENT TOREDUCE THE AMOUNT OF POLLUTANTS ENTERING LEWIS BAY.7a.Project Type:1. Single Family Home 2. Residential Subdivision3.Limited Project Driveway Crossing 4.Commercial/Industrial5.Dock/Pier 6.Utilities7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry)9.Transportation 10.Other7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310CMR 10.53 (inland)?1.Yes No If yes, describe which limited project applies to this project:2. Limited Project8.Property recorded at the Registry of Deeds for:a.County:b.Certificate:c.Book:d.Page:BARNSTABLE D771319 0B. Buffer Zone & Resource Area Impacts (temporary & permanent)1.Buffer Zone & Resource Area Impacts (temporary & permanent):This is a Buffer Zone only project ­ Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland,Inland Bank, or Coastal Resource Area.2.Inland Resource Areas: (See 310 CMR 10.54 ­ 10.58, if not applicable, go to Section B.3. Coastal Resource Areas)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Bank 1. linear feet 2. linear feetb.Bordering Vegetated Wetland 1. square feet 2. square feetc.Land under Waterbodies and Waterways 1. Square feet 2. square feet3. cubic yards dredgedd.Bordering Land Subject to Flooding 1. square feet 2. square feet3. cubic feet of flood storage lost 4. cubic feet replacede.Isolated Land Subject to Flooding 1. square feet2. cubic feet of flood storage lost 3. cubic feet replacedf.Riverfront Area 1. Name of Waterway (if any) 2. Width of Riverfront Area (check one)25 ft. ­ Designated Densely Developed Areas only 100 ft. ­ New agricultural projects only 200 ft. ­ All other projects 3. Total area of Riverfront Area on the site of the proposed project square feet 4. Proposed Alteration of the Riverfront Area: 990 a. total square feet 0 b. square feet within 100 ft. 990 c. square feet between 100 ft. and 200 ft. 5. Has an alternatives analysis been done and is it attached to this NOI?Yes No 6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No 3.Coastal Resource Areas: (See 310 CMR 10.25 ­ 10.35) Resource Area Size of Proposed Alteration Proposed Replacement (if any) a.Designated Port Areas Indicate size under Land under the ocean below, b.Land Under the Ocean 1. square feet 2. cubic yards dredged c.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, below d.Coastal Beaches 1. square feet 2. cubic yards beach nourishment e.Coastal Dunes 1. square feet 2. cubic yards dune nourishment f.Coastal Banks 1. linear feet g.Rocky Intertidal Shores 1. square feet h.Salt Marshes 1. square feet 2. sq ft restoration, rehab, crea. i.Land Under Salt Ponds 1. square feet 2. cubic yards dredged j.Land Containing Shellfish 1. square feet k.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland Land Under Waterbodies and Waterways, above 1. cubic yards dredged l.Land Subject to Coastal Storm Flowage 5700 1. square feet 4.Restoration/Enhancement  Restoration/Replacement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please entered the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 5.Projects Involves Stream Crossings  Project Involves Streams Crossings If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings. a. number of new stream crossings b. number of replacement stream crossings C. Other Applicable Standards and Requirements Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State­Listed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program (NHESP)? a.Yes No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 1 Rabbit Hill Road Westborough, MA 01581 b. Date of map:FROM MAP VIEWER If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18).... c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply) 1. Percentage/acreage of property to be altered: (a) within Wetland Resource Area percentage/acreage (b) outside Resource Area percentage/acreage 2. Assessor's Map or right­of­way plan of site 3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work ** a.Project description (including description of impacts outside of wetland resource area & buffer zone) b. Photographs representative of the site c. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/natural­heritage/regulatory­ review/mass­endangered­species­act­mesa/mesa­fee­schedule.html ) Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above address Projects altering 10 or more acres of land, also submit: d.Vegetation cover type map of site e.Project plans showing Priority & Estimated Habitat boundaries d. OR Check One of the following 1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/laws­regulations/cmr/321­cmr­1000­massachusetts­endangered­ species­act.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2. Separate MESA review ongoing. a. NHESP Tracking Number b. Date submitted to NHESP 3.Separate MESA review completed. Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan. *Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review... 2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run? a. Not applicable ­ project is in inland resource area only b.Yes No If yes, include proof of mailing or hand delivery of NOI to either: South Shore ­ Cohasset to Rhode Island, and the Cape & Islands: Division of Marine Fisheries ­  Southeast Marine Fisheries Station Attn: Environmental Reviewer 836 S. Rodney French Blvd  New Bedford, MA 02744 North Shore ­ Hull to New Hampshire: Division of Marine Fisheries ­  North Shore Office Attn: Environmental Reviewer 30 Emerson Avenue Gloucester, MA 01930 If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office. 3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a.Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP Website for ACEC locations). Note: electronic filers click on Website. b. ACEC Name 4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? a.Yes No 5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)? a.Yes No 6.Is this project subject to provisions of the MassDEP Stormwater Management Standards? 1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol.2, Chapter 3) 2.A portion of the site constitutes redevelopment 3.Proprietary BMPs are included in the Stormwater Management System b.No, Explain why the project is exempt: 1.Single Family Home 2.Emergency Road Repair 3.Small Residential Subdivision (less than or equal to 4 single­family houses or less than or equal to 4 units in multi­family housing project) with no discharge to Critical Areas. D. Additional Information Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department by regular mail delivery. 1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. 3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s). Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4.List the titles and dates for all plans and other materials submitted with this NOI. a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale: SITE MC­3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT ­ 75% DESIGN YARMOUTH, MASSACHUSETTS HORSLEY WITTEN GROUP, INC.RICHARD CLAYTOR, P.E.AUGUST 2024 1"=10' STORMWATER MANAGEMENT REPORT ­ STANDISH WAY YARMOUTH, MA/STORMWATER CHECKLIST HORSLEY WITTEN GROUP, INC SEPTEMBER 2024 SITE MC­3 STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT YARMOUTH, MASSACHUSETTS ­ EXISTING CONDITIONS PLAN HORSLEY WITTEN GROUP, INC.DANIEL MACKENZIE, PLS MARCH, 2024 1"=30' 5.If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8.Attach NOI Wetland Fee Transmittal Form. 9.Attach Stormwater Report, if needed. E. Fees 1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 2. Municipal Check Number 3. Check date 4. State Check Number 5. Check date 6. Payer name on check: First Name 7. Payer name on check: Last Name F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. 1. Signature of Applicant 2. Date 3. Signature of Property Owner(if different)4. Date 5. Signature of Representative (if any)6. Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the "yes" box in Section C, Items 1­3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 3 ­ Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #: eDEP Transaction #:1739280 City/Town:YARMOUTH Page 3 of 8 * ELECTRONIC COPY a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)­(q) and check if: A.General Information1. Project Location:a. Street Address STANDISH WAYb. City/Town YARMOUTH c. Zip Code 02673d. Latitude 41.64734N e. Longitude 70.25586Wf. Map/Plat #21 g.Parcel/Lot #302. Applicant:Individual Organizationa. First Name JEFFREY b.Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f. State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j. Email Jcolby@yarmouth.ma.us3.Property Owner:more than one ownera. First Name JEFFERY b. Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f.State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j.Email Jcolby@yarmouth.ma.us4.Representative:a. First Name MICHELLE b. Last Name WESTc. Organization HORSLEY WITTEN GROUP, INC.d. Mailing Address 90 ROUTE 6A, UNIT 1e. City/Town SANDWICH f. State MA g. Zip Code 02563h.Phone Number 508­833­6600 i.Fax j.Email Mwest@horsleywitten.com5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):a.Total Fee Paid 0.00 b.State Fee Paid 0.00 c.City/Town Fee Paid 0.006.General Project Description:MANAGE AND TREAT STORMWATER RUNOFF FROM STANDISH WAY USING GREEN STORMWATERINFRASTURCTURE (GSI) INCLUDING A INFILTRATION, BIORETENTION AREA, AND POROUS PAVEMENT TOREDUCE THE AMOUNT OF POLLUTANTS ENTERING LEWIS BAY.7a.Project Type:1. Single Family Home 2. Residential Subdivision3.Limited Project Driveway Crossing 4.Commercial/Industrial5.Dock/Pier 6.Utilities7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry)9.Transportation 10.Other7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310CMR 10.53 (inland)?1.Yes No If yes, describe which limited project applies to this project:2. Limited Project8.Property recorded at the Registry of Deeds for:a.County:b.Certificate:c.Book:d.Page:BARNSTABLE D771319 0B. Buffer Zone & Resource Area Impacts (temporary & permanent)1.Buffer Zone & Resource Area Impacts (temporary & permanent):This is a Buffer Zone only project ­ Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland,Inland Bank, or Coastal Resource Area.2.Inland Resource Areas: (See 310 CMR 10.54 ­ 10.58, if not applicable, go to Section B.3. Coastal Resource Areas)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Bank 1. linear feet 2. linear feetb.Bordering Vegetated Wetland 1. square feet 2. square feetc.Land under Waterbodies and Waterways 1. Square feet 2. square feet3. cubic yards dredgedd.Bordering Land Subject to Flooding 1. square feet 2. square feet3. cubic feet of flood storage lost 4. cubic feet replacede.Isolated Land Subject to Flooding 1. square feet2. cubic feet of flood storage lost 3. cubic feet replacedf.Riverfront Area 1. Name of Waterway (if any)2. Width of Riverfront Area (check one)25 ft. ­ Designated Densely Developed Areas only100 ft. ­ New agricultural projects only200 ft. ­ All other projects3. Total area of Riverfront Area on the site of the proposed project square feet4. Proposed Alteration of the Riverfront Area:990a. total square feet 0b. square feet within 100 ft.990c. square feet between 100 ft.and 200 ft.5. Has an alternatives analysis been done and is it attached to this NOI?Yes No6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No3.Coastal Resource Areas: (See 310 CMR 10.25 ­ 10.35)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Designated Port Areas Indicate size under Land under the ocean below,b.Land Under the Ocean 1. square feet2. cubic yards dredgedc.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, belowd.Coastal Beaches 1. square feet 2. cubic yards beach nourishmente.Coastal Dunes 1. square feet 2. cubic yards dune nourishmentf.Coastal Banks 1. linear feetg.Rocky Intertidal Shores 1. square feeth.Salt Marshes 1. square feet 2. sq ft restoration, rehab, crea.i.Land Under Salt Ponds 1. square feet2. cubic yards dredgedj.Land Containing Shellfish 1. square feetk.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland LandUnder Waterbodies and Waterways, above1. cubic yards dredgedl.Land Subject to Coastal Storm Flowage 5700 1. square feet 4.Restoration/Enhancement  Restoration/Replacement If the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has been entered in Section B.2.b or B.3.h above, please entered the additional amount here. a. square feet of BVW b. square feet of Salt Marsh 5.Projects Involves Stream Crossings  Project Involves Streams Crossings If the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings. a. number of new stream crossings b. number of replacement stream crossings C. Other Applicable Standards and Requirements Streamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review 1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recent Estimated Habitat Map of State­Listed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program (NHESP)? a.Yes No If yes, include proof of mailing or hand delivery of NOI to: Natural Heritage and Endangered Species Program Division of Fisheries and Wildlife 1 Rabbit Hill Road Westborough, MA 01581 b. Date of map:FROM MAP VIEWER If yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18).... c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply) 1. Percentage/acreage of property to be altered: (a) within Wetland Resource Area percentage/acreage (b) outside Resource Area percentage/acreage 2. Assessor's Map or right­of­way plan of site 3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showing existing and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work ** a.Project description (including description of impacts outside of wetland resource area & buffer zone) b. Photographs representative of the site c. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/natural­heritage/regulatory­ review/mass­endangered­species­act­mesa/mesa­fee­schedule.html ) Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above address Projects altering 10 or more acres of land, also submit: d.Vegetation cover type map of site e.Project plans showing Priority & Estimated Habitat boundaries d. OR Check One of the following 1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/laws­regulations/cmr/321­cmr­1000­massachusetts­endangered­ species­act.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2. Separate MESA review ongoing. a. NHESP Tracking Number b. Date submitted to NHESP 3.Separate MESA review completed. Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan. *Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review... 2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run? a. Not applicable ­ project is in inland resource area only b.Yes No If yes, include proof of mailing or hand delivery of NOI to either: South Shore ­ Cohasset to Rhode Island, and the Cape & Islands: Division of Marine Fisheries ­  Southeast Marine Fisheries Station Attn: Environmental Reviewer 836 S. Rodney French Blvd  New Bedford, MA 02744 North Shore ­ Hull to New Hampshire: Division of Marine Fisheries ­  North Shore Office Attn: Environmental Reviewer 30 Emerson Avenue Gloucester, MA 01930 If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office. 3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a.Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP Website for ACEC locations). Note: electronic filers click on Website. b. ACEC Name 4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? a.Yes No 5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)? a.Yes No 6.Is this project subject to provisions of the MassDEP Stormwater Management Standards? 1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol.2, Chapter 3) 2.A portion of the site constitutes redevelopment 3.Proprietary BMPs are included in the Stormwater Management System b.No, Explain why the project is exempt: 1.Single Family Home 2.Emergency Road Repair 3.Small Residential Subdivision (less than or equal to 4 single­family houses or less than or equal to 4 units in multi­family housing project) with no discharge to Critical Areas. D. Additional Information Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department by regular mail delivery. 1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. 3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s). Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4.List the titles and dates for all plans and other materials submitted with this NOI. a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale: SITE MC­3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT ­ 75% DESIGN YARMOUTH, MASSACHUSETTS HORSLEY WITTEN GROUP, INC.RICHARD CLAYTOR, P.E.AUGUST 2024 1"=10' STORMWATER MANAGEMENT REPORT ­ STANDISH WAY YARMOUTH, MA/STORMWATER CHECKLIST HORSLEY WITTEN GROUP, INC SEPTEMBER 2024 SITE MC­3 STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT YARMOUTH, MASSACHUSETTS ­ EXISTING CONDITIONS PLAN HORSLEY WITTEN GROUP, INC.DANIEL MACKENZIE, PLS MARCH, 2024 1"=30' 5.If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8.Attach NOI Wetland Fee Transmittal Form. 9.Attach Stormwater Report, if needed. E. Fees 1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 2. Municipal Check Number 3. Check date 4. State Check Number 5. Check date 6. Payer name on check: First Name 7. Payer name on check: Last Name F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. 1. Signature of Applicant 2. Date 3. Signature of Property Owner(if different)4. Date 5. Signature of Representative (if any)6. Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the "yes" box in Section C, Items 1­3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 3 ­ Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #: eDEP Transaction #:1739280 City/Town:YARMOUTH Page 4 of 8 * ELECTRONIC COPY a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR 10.05(6)(k)­(q) and check if: A.General Information1. Project Location:a. Street Address STANDISH WAYb. City/Town YARMOUTH c. Zip Code 02673d. Latitude 41.64734N e. Longitude 70.25586Wf. Map/Plat #21 g.Parcel/Lot #302. Applicant:Individual Organizationa. First Name JEFFREY b.Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f. State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j. Email Jcolby@yarmouth.ma.us3.Property Owner:more than one ownera. First Name JEFFERY b. Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f.State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j.Email Jcolby@yarmouth.ma.us4.Representative:a. First Name MICHELLE b. Last Name WESTc. Organization HORSLEY WITTEN GROUP, INC.d. Mailing Address 90 ROUTE 6A, UNIT 1e. City/Town SANDWICH f. State MA g. Zip Code 02563h.Phone Number 508­833­6600 i.Fax j.Email Mwest@horsleywitten.com5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):a.Total Fee Paid 0.00 b.State Fee Paid 0.00 c.City/Town Fee Paid 0.006.General Project Description:MANAGE AND TREAT STORMWATER RUNOFF FROM STANDISH WAY USING GREEN STORMWATERINFRASTURCTURE (GSI) INCLUDING A INFILTRATION, BIORETENTION AREA, AND POROUS PAVEMENT TOREDUCE THE AMOUNT OF POLLUTANTS ENTERING LEWIS BAY.7a.Project Type:1. Single Family Home 2. Residential Subdivision3.Limited Project Driveway Crossing 4.Commercial/Industrial5.Dock/Pier 6.Utilities7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry)9.Transportation 10.Other7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310CMR 10.53 (inland)?1.Yes No If yes, describe which limited project applies to this project:2. Limited Project8.Property recorded at the Registry of Deeds for:a.County:b.Certificate:c.Book:d.Page:BARNSTABLE D771319 0B. Buffer Zone & Resource Area Impacts (temporary & permanent)1.Buffer Zone & Resource Area Impacts (temporary & permanent):This is a Buffer Zone only project ­ Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland,Inland Bank, or Coastal Resource Area.2.Inland Resource Areas: (See 310 CMR 10.54 ­ 10.58, if not applicable, go to Section B.3. Coastal Resource Areas)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Bank 1. linear feet 2. linear feetb.Bordering Vegetated Wetland 1. square feet 2. square feetc.Land under Waterbodies and Waterways 1. Square feet 2. square feet3. cubic yards dredgedd.Bordering Land Subject to Flooding 1. square feet 2. square feet3. cubic feet of flood storage lost 4. cubic feet replacede.Isolated Land Subject to Flooding 1. square feet2. cubic feet of flood storage lost 3. cubic feet replacedf.Riverfront Area 1. Name of Waterway (if any)2. Width of Riverfront Area (check one)25 ft. ­ Designated Densely Developed Areas only100 ft. ­ New agricultural projects only200 ft. ­ All other projects3. Total area of Riverfront Area on the site of the proposed project square feet4. Proposed Alteration of the Riverfront Area:990a. total square feet 0b. square feet within 100 ft.990c. square feet between 100 ft.and 200 ft.5. Has an alternatives analysis been done and is it attached to this NOI?Yes No6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No3.Coastal Resource Areas: (See 310 CMR 10.25 ­ 10.35)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Designated Port Areas Indicate size under Land under the ocean below,b.Land Under the Ocean 1. square feet2. cubic yards dredgedc.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, belowd.Coastal Beaches 1. square feet 2. cubic yards beach nourishmente.Coastal Dunes 1. square feet 2. cubic yards dune nourishmentf.Coastal Banks 1. linear feetg.Rocky Intertidal Shores 1. square feeth.Salt Marshes 1. square feet 2. sq ft restoration, rehab, crea.i.Land Under Salt Ponds 1. square feet2. cubic yards dredgedj.Land Containing Shellfish 1. square feetk.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland LandUnder Waterbodies and Waterways, above1. cubic yards dredgedl.Land Subject to CoastalStorm Flowage 57001. square feet4.Restoration/Enhancement Restoration/ReplacementIf the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has beenentered in Section B.2.b or B.3.h above, please entered the additional amount here.a. square feet of BVW b. square feet of Salt Marsh5.Projects Involves Stream Crossings Project Involves Streams CrossingsIf the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings.a. number of new stream crossings b. number of replacement stream crossingsC. Other Applicable Standards and RequirementsStreamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recentEstimated Habitat Map of State­Listed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program(NHESP)?a.Yes NoIf yes, include proof of mailing or hand delivery of NOI to:Natural Heritage and Endangered SpeciesProgramDivision of Fisheries and Wildlife1 Rabbit Hill RoadWestborough, MA 01581b. Date of map:FROM MAP VIEWERIf yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18)....c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply)1. Percentage/acreage of property to be altered:(a) within Wetland Resource Area percentage/acreage(b) outside Resource Area percentage/acreage2. Assessor's Map or right­of­way plan of site3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showingexisting and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work **a.Project description (including description of impacts outside of wetland resource area & buffer zone)b. Photographs representative of the sitec. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/natural­heritage/regulatory­review/mass­endangered­species­act­mesa/mesa­fee­schedule.html )Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above addressProjects altering 10 or more acres of land, also submit:d.Vegetation cover type map of site e.Project plans showing Priority & Estimated Habitat boundaries d. OR Check One of the following 1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321 CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/laws­regulations/cmr/321­cmr­1000­massachusetts­endangered­ species­act.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR 10.37 and 10.59.) 2. Separate MESA review ongoing. a. NHESP Tracking Number b. Date submitted to NHESP 3.Separate MESA review completed. Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan. *Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review... 2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run? a. Not applicable ­ project is in inland resource area only b.Yes No If yes, include proof of mailing or hand delivery of NOI to either: South Shore ­ Cohasset to Rhode Island, and the Cape & Islands: Division of Marine Fisheries ­  Southeast Marine Fisheries Station Attn: Environmental Reviewer 836 S. Rodney French Blvd  New Bedford, MA 02744 North Shore ­ Hull to New Hampshire: Division of Marine Fisheries ­  North Shore Office Attn: Environmental Reviewer 30 Emerson Avenue Gloucester, MA 01930 If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office. For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office. 3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)? a.Yes No If yes, provide name of ACEC (see instructions to WPA Form 3 or DEP Website for ACEC locations). Note: electronic filers click on Website. b. ACEC Name 4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in the Massachusetts Surface Water Quality Standards, 314 CMR 4.00? a.Yes No 5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, § 40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)? a.Yes No 6.Is this project subject to provisions of the MassDEP Stormwater Management Standards? 1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol.2, Chapter 3) 2.A portion of the site constitutes redevelopment 3.Proprietary BMPs are included in the Stormwater Management System b.No, Explain why the project is exempt: 1.Single Family Home 2.Emergency Road Repair 3.Small Residential Subdivision (less than or equal to 4 single­family houses or less than or equal to 4 units in multi­family housing project) with no discharge to Critical Areas. D. Additional Information Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department by regular mail delivery. 1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. 3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s). Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4.List the titles and dates for all plans and other materials submitted with this NOI. a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale: SITE MC­3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT ­ 75% DESIGN YARMOUTH, MASSACHUSETTS HORSLEY WITTEN GROUP, INC.RICHARD CLAYTOR, P.E.AUGUST 2024 1"=10' STORMWATER MANAGEMENT REPORT ­ STANDISH WAY YARMOUTH, MA/STORMWATER CHECKLIST HORSLEY WITTEN GROUP, INC SEPTEMBER 2024 SITE MC­3 STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT YARMOUTH, MASSACHUSETTS ­ EXISTING CONDITIONS PLAN HORSLEY WITTEN GROUP, INC.DANIEL MACKENZIE, PLS MARCH, 2024 1"=30' 5.If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8.Attach NOI Wetland Fee Transmittal Form. 9.Attach Stormwater Report, if needed. E. Fees 1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 2. Municipal Check Number 3. Check date 4. State Check Number 5. Check date 6. Payer name on check: First Name 7. Payer name on check: Last Name F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. 1. Signature of Applicant 2. Date 3. Signature of Property Owner(if different)4. Date 5. Signature of Representative (if any)6. Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the "yes" box in Section C, Items 1­3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 3 ­ Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #: eDEP Transaction #:1739280 City/Town:YARMOUTH Page 5 of 8 * ELECTRONIC COPY a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR10.05(6)(k)­(q) and check if:A.General Information1. Project Location:a. Street Address STANDISH WAYb. City/Town YARMOUTH c. Zip Code 02673d. Latitude 41.64734N e. Longitude 70.25586Wf. Map/Plat #21 g.Parcel/Lot #302. Applicant:Individual Organizationa. First Name JEFFREY b.Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f. State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j. Email Jcolby@yarmouth.ma.us3.Property Owner:more than one ownera. First Name JEFFERY b. Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f.State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j.Email Jcolby@yarmouth.ma.us4.Representative:a. First Name MICHELLE b. Last Name WESTc. Organization HORSLEY WITTEN GROUP, INC.d. Mailing Address 90 ROUTE 6A, UNIT 1e. City/Town SANDWICH f. State MA g. Zip Code 02563h.Phone Number 508­833­6600 i.Fax j.Email Mwest@horsleywitten.com5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):a.Total Fee Paid 0.00 b.State Fee Paid 0.00 c.City/Town Fee Paid 0.006.General Project Description:MANAGE AND TREAT STORMWATER RUNOFF FROM STANDISH WAY USING GREEN STORMWATERINFRASTURCTURE (GSI) INCLUDING A INFILTRATION, BIORETENTION AREA, AND POROUS PAVEMENT TOREDUCE THE AMOUNT OF POLLUTANTS ENTERING LEWIS BAY.7a.Project Type:1. Single Family Home 2. Residential Subdivision3.Limited Project Driveway Crossing 4.Commercial/Industrial5.Dock/Pier 6.Utilities7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry)9.Transportation 10.Other7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310CMR 10.53 (inland)?1.Yes No If yes, describe which limited project applies to this project:2. Limited Project8.Property recorded at the Registry of Deeds for:a.County:b.Certificate:c.Book:d.Page:BARNSTABLE D771319 0B. Buffer Zone & Resource Area Impacts (temporary & permanent)1.Buffer Zone & Resource Area Impacts (temporary & permanent):This is a Buffer Zone only project ­ Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland,Inland Bank, or Coastal Resource Area.2.Inland Resource Areas: (See 310 CMR 10.54 ­ 10.58, if not applicable, go to Section B.3. Coastal Resource Areas)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Bank 1. linear feet 2. linear feetb.Bordering Vegetated Wetland 1. square feet 2. square feetc.Land under Waterbodies and Waterways 1. Square feet 2. square feet3. cubic yards dredgedd.Bordering Land Subject to Flooding 1. square feet 2. square feet3. cubic feet of flood storage lost 4. cubic feet replacede.Isolated Land Subject to Flooding 1. square feet2. cubic feet of flood storage lost 3. cubic feet replacedf.Riverfront Area 1. Name of Waterway (if any)2. Width of Riverfront Area (check one)25 ft. ­ Designated Densely Developed Areas only100 ft. ­ New agricultural projects only200 ft. ­ All other projects3. Total area of Riverfront Area on the site of the proposed project square feet4. Proposed Alteration of the Riverfront Area:990a. total square feet 0b. square feet within 100 ft.990c. square feet between 100 ft.and 200 ft.5. Has an alternatives analysis been done and is it attached to this NOI?Yes No6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No3.Coastal Resource Areas: (See 310 CMR 10.25 ­ 10.35)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Designated Port Areas Indicate size under Land under the ocean below,b.Land Under the Ocean 1. square feet2. cubic yards dredgedc.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, belowd.Coastal Beaches 1. square feet 2. cubic yards beach nourishmente.Coastal Dunes 1. square feet 2. cubic yards dune nourishmentf.Coastal Banks 1. linear feetg.Rocky Intertidal Shores 1. square feeth.Salt Marshes 1. square feet 2. sq ft restoration, rehab, crea.i.Land Under Salt Ponds 1. square feet2. cubic yards dredgedj.Land Containing Shellfish 1. square feetk.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland LandUnder Waterbodies and Waterways, above1. cubic yards dredgedl.Land Subject to CoastalStorm Flowage 57001. square feet4.Restoration/Enhancement Restoration/ReplacementIf the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has beenentered in Section B.2.b or B.3.h above, please entered the additional amount here.a. square feet of BVW b. square feet of Salt Marsh5.Projects Involves Stream Crossings Project Involves Streams CrossingsIf the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings.a. number of new stream crossings b. number of replacement stream crossingsC. Other Applicable Standards and RequirementsStreamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recentEstimated Habitat Map of State­Listed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program(NHESP)?a.Yes NoIf yes, include proof of mailing or hand delivery of NOI to:Natural Heritage and Endangered SpeciesProgramDivision of Fisheries and Wildlife1 Rabbit Hill RoadWestborough, MA 01581b. Date of map:FROM MAP VIEWERIf yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18)....c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply)1. Percentage/acreage of property to be altered:(a) within Wetland Resource Area percentage/acreage(b) outside Resource Area percentage/acreage2. Assessor's Map or right­of­way plan of site3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showingexisting and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work **a.Project description (including description of impacts outside of wetland resource area & buffer zone)b. Photographs representative of the sitec. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/natural­heritage/regulatory­review/mass­endangered­species­act­mesa/mesa­fee­schedule.html )Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above addressProjects altering 10 or more acres of land, also submit:d.Vegetation cover type map of sitee.Project plans showing Priority & Estimated Habitat boundariesd. OR Check One of the following1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/laws­regulations/cmr/321­cmr­1000­massachusetts­endangered­species­act.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR10.37 and 10.59.)2. Separate MESA review ongoing.a. NHESP Tracking Numberb. Date submitted to NHESP3.Separate MESA review completed.Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan.*Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review...2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run?a. Not applicable ­ project is in inland resource area onlyb.Yes NoIf yes, include proof of mailing or hand delivery of NOI to either:South Shore ­ Cohasset to Rhode Island, and the Cape & Islands:Division of Marine Fisheries ­ Southeast Marine Fisheries StationAttn: Environmental Reviewer836 S. Rodney French Blvd New Bedford, MA 02744 North Shore ­ Hull to New Hampshire:Division of Marine Fisheries ­ North Shore OfficeAttn: Environmental Reviewer30 Emerson AvenueGloucester, MA 01930If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office.For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office.3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?a.Yes No If yes, provide name of ACEC (see instructions to WPAForm 3 or DEP Website for ACEC locations). Note:electronic filers click on Website.b. ACEC Name4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in theMassachusetts Surface Water Quality Standards, 314 CMR 4.00?a.Yes No5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, §40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)?a.Yes No6.Is this project subject to provisions of the MassDEP Stormwater Management Standards?1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management Handbook Vol.2, Chapter 3) 2.A portion of the site constitutes redevelopment 3.Proprietary BMPs are included in the Stormwater Management System b.No, Explain why the project is exempt: 1.Single Family Home 2.Emergency Road Repair 3.Small Residential Subdivision (less than or equal to 4 single­family houses or less than or equal to 4 units in multi­family housing project) with no discharge to Critical Areas. D. Additional Information Applicants must include the following with this Notice of Intent (NOI). See instructions for details. Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information you submit to the Department by regular mail delivery. 1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for the Conservation Commission and the Department to locate the site. (Electronic filers may omit this item.) 2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland [BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area. 3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s). Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology. 4.List the titles and dates for all plans and other materials submitted with this NOI. a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale: SITE MC­3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT ­ 75% DESIGN YARMOUTH, MASSACHUSETTS HORSLEY WITTEN GROUP, INC.RICHARD CLAYTOR, P.E.AUGUST 2024 1"=10' STORMWATER MANAGEMENT REPORT ­ STANDISH WAY YARMOUTH, MA/STORMWATER CHECKLIST HORSLEY WITTEN GROUP, INC SEPTEMBER 2024 SITE MC­3 STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT YARMOUTH, MASSACHUSETTS ­ EXISTING CONDITIONS PLAN HORSLEY WITTEN GROUP, INC.DANIEL MACKENZIE, PLS MARCH, 2024 1"=30' 5.If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8.Attach NOI Wetland Fee Transmittal Form. 9.Attach Stormwater Report, if needed. E. Fees 1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 2. Municipal Check Number 3. Check date 4. State Check Number 5. Check date 6. Payer name on check: First Name 7. Payer name on check: Last Name F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. 1. Signature of Applicant 2. Date 3. Signature of Property Owner(if different)4. Date 5. Signature of Representative (if any)6. Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the "yes" box in Section C, Items 1­3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 3 ­ Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #: eDEP Transaction #:1739280 City/Town:YARMOUTH Page 6 of 8 * ELECTRONIC COPY a.Yes, Attach a copy of the Stormwater Report as required by the Stormwater Management Standards per 310 CMR10.05(6)(k)­(q) and check if:A.General Information1. Project Location:a. Street Address STANDISH WAYb. City/Town YARMOUTH c. Zip Code 02673d. Latitude 41.64734N e. Longitude 70.25586Wf. Map/Plat #21 g.Parcel/Lot #302. Applicant:Individual Organizationa. First Name JEFFREY b.Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f. State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j. Email Jcolby@yarmouth.ma.us3.Property Owner:more than one ownera. First Name JEFFERY b. Last Name COLBYc. Organization TOWN OF YARMOUTHd. Mailing Address 1146 ROUTE 28e. City/Town SOUTH YARMOUTH f.State MA g. Zip Code 02664h. Phone Number 508­398­2231 i. Fax j.Email Jcolby@yarmouth.ma.us4.Representative:a. First Name MICHELLE b. Last Name WESTc. Organization HORSLEY WITTEN GROUP, INC.d. Mailing Address 90 ROUTE 6A, UNIT 1e. City/Town SANDWICH f. State MA g. Zip Code 02563h.Phone Number 508­833­6600 i.Fax j.Email Mwest@horsleywitten.com5.Total WPA Fee Paid (Automatically inserted from NOI Wetland Fee Transmittal Form):a.Total Fee Paid 0.00 b.State Fee Paid 0.00 c.City/Town Fee Paid 0.006.General Project Description:MANAGE AND TREAT STORMWATER RUNOFF FROM STANDISH WAY USING GREEN STORMWATERINFRASTURCTURE (GSI) INCLUDING A INFILTRATION, BIORETENTION AREA, AND POROUS PAVEMENT TOREDUCE THE AMOUNT OF POLLUTANTS ENTERING LEWIS BAY.7a.Project Type:1. Single Family Home 2. Residential Subdivision3.Limited Project Driveway Crossing 4.Commercial/Industrial5.Dock/Pier 6.Utilities7.Coastal Engineering Structure 8.Agriculture (eg., cranberries, forestry)9.Transportation 10.Other7b.Is any portion of the proposed activity eligible to be treated as a limited project subject to 310 CMR 10.24 (coastal) or 310CMR 10.53 (inland)?1.Yes No If yes, describe which limited project applies to this project:2. Limited Project8.Property recorded at the Registry of Deeds for:a.County:b.Certificate:c.Book:d.Page:BARNSTABLE D771319 0B. Buffer Zone & Resource Area Impacts (temporary & permanent)1.Buffer Zone & Resource Area Impacts (temporary & permanent):This is a Buffer Zone only project ­ Check if the project is located only in the Buffer Zone of a Bordering Vegetated Wetland,Inland Bank, or Coastal Resource Area.2.Inland Resource Areas: (See 310 CMR 10.54 ­ 10.58, if not applicable, go to Section B.3. Coastal Resource Areas)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Bank 1. linear feet 2. linear feetb.Bordering Vegetated Wetland 1. square feet 2. square feetc.Land under Waterbodies and Waterways 1. Square feet 2. square feet3. cubic yards dredgedd.Bordering Land Subject to Flooding 1. square feet 2. square feet3. cubic feet of flood storage lost 4. cubic feet replacede.Isolated Land Subject to Flooding 1. square feet2. cubic feet of flood storage lost 3. cubic feet replacedf.Riverfront Area 1. Name of Waterway (if any)2. Width of Riverfront Area (check one)25 ft. ­ Designated Densely Developed Areas only100 ft. ­ New agricultural projects only200 ft. ­ All other projects3. Total area of Riverfront Area on the site of the proposed project square feet4. Proposed Alteration of the Riverfront Area:990a. total square feet 0b. square feet within 100 ft.990c. square feet between 100 ft.and 200 ft.5. Has an alternatives analysis been done and is it attached to this NOI?Yes No6. Was the lot where the activity is proposed created prior to August 1, 1996?Yes No3.Coastal Resource Areas: (See 310 CMR 10.25 ­ 10.35)Resource Area Size of Proposed Alteration Proposed Replacement (if any)a.Designated Port Areas Indicate size under Land under the ocean below,b.Land Under the Ocean 1. square feet2. cubic yards dredgedc.Barrier Beaches Indicate size under Coastal Beaches and/or Coatstal Dunes, belowd.Coastal Beaches 1. square feet 2. cubic yards beach nourishmente.Coastal Dunes 1. square feet 2. cubic yards dune nourishmentf.Coastal Banks 1. linear feetg.Rocky Intertidal Shores 1. square feeth.Salt Marshes 1. square feet 2. sq ft restoration, rehab, crea.i.Land Under Salt Ponds 1. square feet2. cubic yards dredgedj.Land Containing Shellfish 1. square feetk.Fish Runs Indicate size under Coastal Banks, Inland Bank, Land Under the Ocean, and/or inland LandUnder Waterbodies and Waterways, above1. cubic yards dredgedl.Land Subject to CoastalStorm Flowage 57001. square feet4.Restoration/Enhancement Restoration/ReplacementIf the project is for the purpose of restoring or enhancing a wetland resource area in addition to the square footage that has beenentered in Section B.2.b or B.3.h above, please entered the additional amount here.a. square feet of BVW b. square feet of Salt Marsh5.Projects Involves Stream Crossings Project Involves Streams CrossingsIf the project involves Stream Crossings, please enter the number of new stream crossings/number of replacement stream crossings.a. number of new stream crossings b. number of replacement stream crossingsC. Other Applicable Standards and RequirementsStreamlined Massachusetts Endangered Species Act/Wetlands Protection Act Review1.Is any portion of the proposed project located in Estimated Habitat of Rare Wildlife as indicated on the most recentEstimated Habitat Map of State­Listed Rare Wetland Wildlife published by the Natural Heritage of Endangered Species program(NHESP)?a.Yes NoIf yes, include proof of mailing or hand delivery of NOI to:Natural Heritage and Endangered SpeciesProgramDivision of Fisheries and Wildlife1 Rabbit Hill RoadWestborough, MA 01581b. Date of map:FROM MAP VIEWERIf yes, the project is also subject to Massachusetts Endangered Species Act (MESA) review (321 CMR 10.18)....c. Submit Supplemental Information for Endangered Species Review * (Check boxes as they apply)1. Percentage/acreage of property to be altered:(a) within Wetland Resource Area percentage/acreage(b) outside Resource Area percentage/acreage2. Assessor's Map or right­of­way plan of site3. Project plans for entire project site, including wetland resource areas and areas outside of wetland jurisdiction, showingexisting and proposed conditions, existing and proposed tree/vegetation clearing line, and clearly demarcated limits of work **a.Project description (including description of impacts outside of wetland resource area & buffer zone)b. Photographs representative of the sitec. MESA filing fee (fee information available at: http://www.mass.gov/eea/agencies/dfg/dfw/natural­heritage/regulatory­review/mass­endangered­species­act­mesa/mesa­fee­schedule.html )Make check payable to "Natural Heritage & Endangered Species Fund" and mail to NHESP at above addressProjects altering 10 or more acres of land, also submit:d.Vegetation cover type map of sitee.Project plans showing Priority & Estimated Habitat boundariesd. OR Check One of the following1. Project is exempt from MESA review. Attach applicant letter indicating which MESA exemption applies. (See 321CMR 10.14, http://www.mass.gov/eea/agencies/dfg/dfw/laws­regulations/cmr/321­cmr­1000­massachusetts­endangered­species­act.html#10.14; the NOI must still be sent to NHESP if the project is within estimated habitat pursuant to 310 CMR10.37 and 10.59.)2. Separate MESA review ongoing.a. NHESP Tracking Numberb. Date submitted to NHESP3.Separate MESA review completed.Include copy of NHESP "no Take" determination or valid Conservation & Management Permit with approved plan.*Some projects not in Estimated Habitat may be located in Priority Habitat, and require NHESP review...2.For coastal projects only, is any portion of the proposed project located below the mean high waterline or in a fish run?a. Not applicable ­ project is in inland resource area onlyb.Yes NoIf yes, include proof of mailing or hand delivery of NOI to either:South Shore ­ Cohasset to Rhode Island, and the Cape & Islands:Division of Marine Fisheries ­ Southeast Marine Fisheries StationAttn: Environmental Reviewer836 S. Rodney French Blvd New Bedford, MA 02744 North Shore ­ Hull to New Hampshire:Division of Marine Fisheries ­ North Shore OfficeAttn: Environmental Reviewer30 Emerson AvenueGloucester, MA 01930If yes, it may require a Chapter 91 license. For coastal towns in the Northeast Region, please contact MassDEP's Boston Office.For coastal towns in the Southeast Region, please contact MassDEP's Southeast Regional office.3.Is any portion of the proposed project within an Area of Critical Environmental Concern (ACEC)?a.Yes No If yes, provide name of ACEC (see instructions to WPAForm 3 or DEP Website for ACEC locations). Note:electronic filers click on Website.b. ACEC Name4.Is any portion of the proposed project within an area designated as an Outstanding Resource Water (ORW) as designated in theMassachusetts Surface Water Quality Standards, 314 CMR 4.00?a.Yes No5.Is any portion of the site subject to a Wetlands Restriction Order under the Inland Wetlands Restriction Act (M.G.L.c. 131, §40A) or the Coastal Wetlands Restriction Act (M.G.L.c. 130, § 105)?a.Yes No6.Is this project subject to provisions of the MassDEP Stormwater Management Standards?1.Applying for Low Impact Development (LID) site design credits (as described in Stormwater Management HandbookVol.2, Chapter 3)2.A portion of the site constitutes redevelopment3.Proprietary BMPs are included in the Stormwater Management Systemb.No, Explain why the project is exempt:1.Single Family Home2.Emergency Road Repair3.Small Residential Subdivision (less than or equal to 4 single­family houses or less than or equal to 4 units in multi­familyhousing project) with no discharge to Critical Areas.D. Additional InformationApplicants must include the following with this Notice of Intent (NOI). See instructions for details.Online Users: Attach the document transaction number (provided on your receipt page) for any of the following information yousubmit to the Department by regular mail delivery.1.USGS or other map of the area (along with a narrative description, if necessary) containing sufficient information for theConservation Commission and the Department to locate the site. (Electronic filers may omit this item.)2.Plans identifying the location of proposed activities (including activities proposed to serve as a Bordering Vegetated Wetland[BVW] replication area or other mitigating measure) relative to the boundaries of each affected resource area.3.Identify the method for BVW and other resource area boundary delineations (MassDEP BVW Field Data Form(s).Determination of Applicability, Order of Resource Area Delineation, etc.), and attach documentation of the methodology.4.List the titles and dates for all plans and other materials submitted with this NOI.a. Plan Title:b. Plan Prepared By:c. Plan Signed/Stamped By:c. Revised Final Date:e. Scale:SITE MC­3:STANDISH WAYSTORMWATERRETROFIT DESIGNANDIMPLEMENTATIONPROJECT ­ 75%DESIGN YARMOUTH,MASSACHUSETTS HORSLEY WITTENGROUP, INC.RICHARD CLAYTOR, P.E.AUGUST 2024 1"=10'STORMWATERMANAGEMENTREPORT ­ STANDISHWAY YARMOUTH,MA/STORMWATERCHECKLIST HORSLEY WITTENGROUP, INC SEPTEMBER 2024SITE MC­3 STANDISHWAY STORMWATERRETROFIT DESIGNANDIMPLEMENTATION PROJECT YARMOUTH, MASSACHUSETTS ­ EXISTING CONDITIONS PLAN HORSLEY WITTEN GROUP, INC.DANIEL MACKENZIE, PLS MARCH, 2024 1"=30' 5.If there is more than one property owner, please attach a list of these property owners not listed on this form. 6.Attach proof of mailing for Natural Heritage and Endangered Species Program, if needed. 7.Attach proof of mailing for Massachusetts Division of Marine Fisheries, if needed. 8.Attach NOI Wetland Fee Transmittal Form. 9.Attach Stormwater Report, if needed. E. Fees 1. Fee Exempt: No filing fee shall be assessed for projects of any city, town, county, or district of the Commonwealth, federally recognized Indian tribe housing authority, municipal housing authority, or the Massachusetts Bay Transportation Authority. Applicants must submit the following information (in addition to pages 1 and 2 of the NOI Wetland Fee Transmittal Form) to confirm fee payment: 2. Municipal Check Number 3. Check date 4. State Check Number 5. Check date 6. Payer name on check: First Name 7. Payer name on check: Last Name F. Signatures and Submittal Requirements I hereby certify under the penalties of perjury that the foregoing Notice of Intent and accompanying plans, documents, and supporting data are true and complete to the best of my knowledge. I understand that the Conservation Commission will place notification of this Notice in a local newspaper at the expense of the applicant in accordance with the wetlands regulations, 310 CMR 10.05(5)(a). I further certify under penalties of perjury that all abutters were notified of this application, pursuant to the requirements of M.G.L. c. 131, § 40. Notice must be made by Certificate of Mailing or in writing by hand delivery or certified mail (return receipt requested) to all abutters within 100 feet of the property line of the project location. 1. Signature of Applicant 2. Date 3. Signature of Property Owner(if different)4. Date 5. Signature of Representative (if any)6. Date For Conservation Commission: Two copies of the completed Notice of Intent (Form 3), including supporting plans and documents, two copies of the NOI Wetland Fee Transmittal Form, and the city/town fee payment, to the Conservation Commission by certified mail or hand delivery. For MassDEP: One copy of the completed Notice of Intent (Form 3), including supporting plans and documents, one copy of the NOI Wetland Fee Transmittal Form, and a copy of the state fee payment to the MassDEP Regional Office (see Instructions) by certified mail or hand delivery. Other: If the applicant has checked the "yes" box in Section C, Items 1­3, above, refer to that section and the Instructions for additional submittal requirements. The original and copies must be sent simultaneously. Failure by the applicant to send copies in a timely manner may result in dismissal of the Notice of Intent. Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 3 ­ Notice of Intent Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #: eDEP Transaction #:1739280 City/Town:YARMOUTH Page 7 of 8 * ELECTRONIC COPY 9/18/2024 A. Applicant Information 1. Applicant: a. First Name JEFFREY b.Last Name COLBY c. Organization TOWN OF YARMOUTH d. Mailing Address 1146 ROUTE 28 e. City/Town SOUTH YARMOUTH f. State MA g. Zip Code 02664 h. Phone Number 5083982231 i. Fax j. Email Jcolby@yarmouth.ma.us 2.Property Owner:(if different) a. First Name JEFFERY b. Last Name COLBY c. Organization TOWN OF YARMOUTH d. Mailing Address 1146 ROUTE 28 e. City/Town SOUTH YARMOUTH f.State MA g. Zip Code 02664 h. Phone Number 5083982231 i. Fax j.Email Jcolby@yarmouth.ma.us 3. Project Location: a. Street Address STANDISH WAY b. City/Town YARMOUTH Are you exempted from Fee? (YOU HAVE SELECTED 'YES') Note: Fee will be exempted if you are one of the following: City/Town/County/District Municipal Housing Authority Indian Tribe Housing Authority MBTA State agencies are only exempt if the fee is less than $100 B. Fees Activity Type Activity Number Activity Fee RF Multiplier Sub Total City/Town share of filling fee $0.00 State share of filing fee $0.00 Total Project Fee $0.00 Massachusetts Department of Environmental Protection Bureau of Resource Protection ­ Wetlands WPA Form 3 ­ Notice of Wetland FeeTransmittal Form Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 Provided by MassDEP: MassDEP File #: eDEP Transaction #:1739280 City/Town:YARMOUTH Page 1 of 1 * ELECTRONIC COPY Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 Rev 3/2023 Page 1 of 2 Administrative Checklist Notice of Intent General Information: All filings must be made on Town of Yarmouth forms. The filing deadline is two weeks prior to the next scheduled Conservation Commission meeting for new applications. Failure to follow this Checklist shall result in an Administratively Incomplete Application and will not be advertised for a Public Hearing. Refer to the meeting schedule. Contact the Conservation Office if you need assistance. Submitting an Application: Does the property have any outstanding/expired Orders of Conditions? If so, please file a Request for Certificate of Compliance for each outstanding/expired Order, as the Commission may not issue a new Order until any outstanding/expired Orders have been closed and recorded. (*see page 2) Hardcopy filing dropped off or mailed to the Conservation Office including: 1 Administrative Checklist 1 NOI application with original signatures (double sided). Typed signatures will not be accepted. 1 detailed narrative of the project including: existing & proposed conditions, construction sequence, type of equipment, staging locations, drainage and stormwater, erosion controls, invasive species management and alternative analysis. The narrative shall include how the project meets performance standards per 310 CMR 10.0 & TOY Wetland Bylaw, Chapter 143, BVW delineation sheets or other resource area calculations, and supporting information. 1 100’ radius map, current abutters list identifying the property owners who are to be notified per 310 CMR 10.00 and abutter notification form. Abutters list must be certified by the Town Assessor’s office. The Assessor’s office requires 7 days advance notice. All abutters must be notified via certified mail. Certified Mail Receipts (PS Form 3800) for all abutters. Green cards to be submitted at the hearing. 1 original and 6 copies of the plan, folded separately, right side out with title and project address visible. All plans shall reference NAVD1988 unless otherwise noted. Landscape plans shall be detailed to show proposed & existing conditions, native species, size and spacing. See plan requirements Yarmouth’s share of State filing fee: Separate check made payable to “Town of Yarmouth” (refer to NOI Wetland Fee Transmittal Form) By-law filing fee: Separate check made payable to “Town of Yarmouth” Legal ad fee: Separate check made payable to “Town of Yarmouth” Please list project property’s street address on checks. Refer to Fee Schedule DEP share of the fee (refer to NOI form) shall be sent to: Dept. of Environmental Protection Box 4062 Boston, MA 02211 CONSERVATION OFFICE NA Town of Yarmouth is the applicant Yarmouth Conservation Commission • 1146 Route 28 • South Yarmouth, MA 02664-4492 Tel. (508)-398-2231 Ext. 1288 • Fax (508)-398-0836 • TTD# (508) 398-2231 Rev 3/2023 Page 2 of 2 Digital filing emailed to bdirienzo@yarmouth.ma.us including: A pdf of the entire signed application, supporting information listed above, and plan. Please list project property’s street address in the pdf file name. DEP Submittal If you are filing with MassDEP using eDEP, please include a copy of the submittal confirmation with your application. If not filing via eDEP, a copy of your application, plan, and all other supporting information must be sent VIA EMAIL the same day to DEP, Southeast Region at SERO_NOI@mass.gov with the subject line in the email per DEP’s request listed as “YARMOUTH - NOI - Street Address - Applicant Name” and copied to bdirienzo@yarmouth.ma.us. We must receive a copy of this email with the application as proof that it has been submitted to DEP. Initial below I CERTIFY that all on-site requirements will be completed by noon on the Friday prior to the hearing date. All proposed structures must be staked, and all relevant resource areas and buffer zones must be staked or flagged. Please consult the Yarmouth Wetland Regulations, page 17. Without proper staking your project may be deemed incomplete and be continued to the next hearing date. If Applicable Certified Mail Receipt for Massachusetts Natural Heritage and Endangered Species Program Certified Mail Receipt for Massachusetts Division of Marine Fisheries. If filing via email, CC bdirienzo@yarmouth.ma.us Waterway’s jurisdiction – Any coastal projects such as, but not limited to, docks, piers, bulkheads, revetments, dredging and boardwalks shall require submittal of all Notice of Intent, plans and supplemental information to the Town of Yarmouth Waterways/Shellfish Committee via the Natural Resources office by certified mail or hand delivery. The applicant or his/her representative must provide the Conservation office proof that this has been done or the filing will not be accepted. Other Requirements o Does the proposed project meet the applicable regulations of the Town of Yarmouth Zoning bylaws? Do you need to file with the Yarmouth Board of Appeals? If so, you must file with both boards at the same time. o If a vacant lot, have you completed and received a determination for the Building Department for a lot inquiry form? *To view all Conservation files/permits for the property address online, go to www.yarmouth.ma.us/LF NA NA NA MW 21 day waiver Rev July 2024 New Logo CONSERVATION OFFICE Town of Yarmouth Conservation Commission 21-DAY WAIVER Please complete this form, sign at the bottom and return to the Conservation Office. I, , hereby waive the 21-day time period for a public hearing/meeting and/or issuance of the: OOC / DOA / COC / ORAD following receipt of my filing of a: Notice of Intent Request for Determination of Applicability Request for Certificate of Compliance Other by the Yarmouth Conservation Commission under Massachusetts General Laws, Ch. 131, sec. 40, and/or under Yarmouth Wetland Bylaw. The application was submitted on (date received by Conservation Office) for work at (project address/location) I am the: Applicant Applicant's Representative Property Owner Signature Date NOTE: Please be advised that you will be notified of the meeting date once this application has been assigned to a Conservation Meeting Agenda at the email address listed on the application. Jeffrey Colby, P.E., DPW Director x September 19, 2024 Standish Way right-of-way x 21/ 37/ / / MANGIONE WELTON BELINDA MANGIONE LUFF CLAUDIA 255 OXFORD RD OXFORD, CT 06478 21/ 38/ / / MANGIONE MARY ELLEN TRS 1 MANGIONE DR OXFORD, CT 06483 21/ 40/ / / RANDO JOSEPH P C/O RANDO JOSEPH P (LIFE EST) 47 HERMAINE AVE DEDHAM, MA 02026 21/ 42/ / / WARNER THEOREN L TRS C/O WARNER JAY C 23 LEWIS DR MIDDLETON, MA 01949 29/ 232/ / / CRIVELLI ANDREW H TRS C/O ITINERANT STAYS LLC 90 RIPPLE COVE RD HYANNIS, MA 02601 21/ 30/ / / OCEAN RESORTS MARKETING INC C/O COLONIAL ACRES RESORT 114 STANDISH WAY WEST YARMOUTH, MA 02673 30/ 115/ / / HALLORAN JOHN B HALLORAN MARY JANE 65 WEBSTER RD WEST YARMOUTH, MA 02673 22/ 20.1.1/ / / MALLEGNI BRENDA L TRS BLM REALTY TRUST 6 WOLFPEN LN SOUTHBOROUGH, MA 01772-1129 22/ 55/ / / KINGS ENTERPRISE LLC 820 HERON COVE CIR VENICE, FL 34285 21/ 43/ / / HARTRANFT TERESA M TRS T M H NOMINEE TRUST 224 MID PINE DR YARMOUTH PORT, MA 02675-1642 21/ 36/ / / WHELAN MARY L PO BOX 291077 PORT ORANGE, FL 32129-1077 21/ 35/ / / CAREY MICHAEL A TRS CAREY DEBORAH B TRS 33 RED GATE LN COHASSET, MA 02025 21/ 34/ / / RANDO JOSEPH P C/O RANDO DONNA L (LIFE EST) 47 HERMAINE AVE DEDHAM, MA 02026 21/ 33.1/ C1/ / BROWN ROBERT J BROWN DEBRA J 10 WINDEMERE RD UNIT 1 WEST YARMOUTH, MA 02673 21/ 31/ / / BULL RUN INVESTMENT CORPORATION 24 WOODLAND AVE NORTH ATTLEBORO, MA 02760 21/ 51/ / / QUINN BRIAN ROBERT QUINN GAIL JOANNE P O BOX 775 WEST YARMOUTH , MA 02673 29/ 122/ / / CATALONI RAYMOND J TR CATALONI FAMILY TRUST 20 PILGRIM RD WEST YARMOUTH, MA 02673 29/ 123/ / / CATALONI RAYMOND J CO-TRS CATALONI ROSEMARY A CO-TRS 115 STANDISH WAY WEST YARMOUTH, MA 02673 29/ 124/ / / MACDONALD DENNIS J JR MACDONALD DARCIE M 97 BONNEY HILL LN HANSON, MA 02341 29/ 239/ / / THOMPSON MICHAEL W THOMPSON CATHERINE R 4 LEDGEWOOD DR DOVER, MA 02030 29/ 241.1/ / / CARPENTER JOYCE 106 STANDISH WAY WEST YARMOUTH, MA 02673 29/ 240.1/ / / MARCELLINO STEPHEN M MARCELLINO KAREN KELLY 45 BRADFORD BLVD YONKERS, NY 10710-3639 29/ 135/ / / CALLAHAN JOSEPHINE S TR CALLAHAN QPRT TRUST 109 STANDISH WAY WEST YARMOUTH, MA 02673 29/ 233/ / / EBURN LINDA L TR EBURN WILLIAM H III TR 43 WEBSTER RD WEST YARMOUTH, MA 02673 29/ 238/ / / THOMPSON MICHAEL W THOMPSON CATHERINE R 4 LEDGEWOOD DR DOVER, MA 02030 29/ 231/ / / VASILAUSKAS BARBARA ANN P O BOX 5094 NORWELL, MA 02061 29/ 230/ / / MARAVELIS CHRISTOS MARAVELIS HELEN 90 ORCHARD ST BOSTON, MA 02130 30/ 117/ / / WALSH BERNARD L C/O BSC PROPERTY MANAGEMENT 75 RITA RD BRAINTREE, MA 02184 22/ 58/ / / THOMAS SARAH P TRS MARY ELLEN PIERCE IRREV TRST 760 HIGHLAND AVE #19 NEEDHAM HEIGHTS, MA 02494 30/ 9/ / / TOWN OF YARMOUTH 1146 ROUTE 28 SOUTH YARMOUTH, MA 02664-4463 22/ 56/ / / VALLEY ROAD PARTNERSHIP C/O RICHARD A PARKER 430 SILVERGATE AVE SAN DIEGO , CA 92106 30/ 116/ / / TOWN OF YARMOUTH 1146 ROUTE 28 SOUTH YARMOUTH, MA 02664 22/ 20.1.2/ / / MALLEGNI BRENDA L TR BLM REALTY TRUST 6 WOLFPEN LN SOUTHBOROUGH, MA 01772-1129 21/ 45.1/ C1/ / RYAN CHARLES R RYAN KATHI A 18 MAGNOLIA DR ROCKLAND, MA 02370 21/ 45.1/ C2/ / 149 PLUM LLC 80 CRANBERRY RIDGE MARSTONS MILLS, MA 02648 21/ 45.1/ C3/ / BENTLEY DALE J 77 NORTH HULL ST EAST PROVIDENCE, RI 02194 21/ 45.1/ C4/ / GRAHAM MARY GRAHAM MARTIN C 2221 OLIVE BRANCH DR SUN CITY CENTER , FL 33573 21/ 45.1/ C5/ / HEATH PAUL HEATH AMY 412 BETHIAN TRAIL SEVERNA PARK, MD 21146 21/ 45.1/ C6/ / HEATH PAUL R HEATH AMY LOU 412 BETHIAN TRAIL SEVERNA PARK, MD 21146 21/ 45.1/ C7/ / FOX CAROLINE 3811 HOLLIWELL PASS CUMMING, GA 30040 21/ 45.1/ C8/ / MILANO SANDRA L 12 FAST BROOK RD WEST YARMOUTH, MA 02673 21/ 45.1/ C9/ / KELLEHER SHEILA C 6 ALDEN TERR PLYMOUTH, MA 02360 21/ 45.1/ C10/ / 9 WINDEMERE RD LLC C/O WINDEMERE2024 LLC 33 SLEEPER ST UNIT 601 BOSTON, MA 02210 BEACH BANK CONDO CONDO MAIN 9 WINDEMERE RD SOUTH YARMOUTH, MA 02664 21/ 33.1/ C2/ / DEVINCENT JAMES P C/O QUATRO IRMAS LLC 11 STEAMBOAT LN HINGHAM, MA 02043 Please use this signature to certify this list of propertiesabutting within 100' of the parcel located at:114 Standish Way, West Yarmouth, MA 02673Assessors Map 21, Lot 30_____________________________________Andy Machado, Director of AssessingJune 14, 2024 NOTIFICATION TO ABUTTERS UNDER THE MASSACHUSETTS WETLANDS PROTECTION ACT & TOWN OF YARMOUTH WETLAND BY-LAW, CHAPTER 143 In accordance with the second paragraph of the Massachusetts General Laws Chapter 131, Section 40, you are hereby notified of the following: A. The name of the applicant is ________________________________________________ B. The applicant has filed a Notice of Intent with the Yarmouth Conservation Commission, seeking permission to remove, fill, dredge or alter an Area Subject to Protection under the Wetlands Protection Act (MGL c. 131 s. 40 & Town of Yarmouth Wetland By-Law, Chapter 143). C. The address of the lot where the activity is proposed is ______________________________ D. Proposed work is _____________________________________________________________ ____________________________________________________________________________ E.Copies of the Notice of Intent may be examined at the Yarmouth Town Hall at the Conservation Commission office between the hours of 9:00 a.m. and 4:00 p.m. Monday thru Friday. For more information, call (508) 398-2231 ext. 1288. F.Copies of the Notice of Intent may be obtained from either the applicant or applicant’s representative. Applicant’s phone number _____________________________________ Or Applicant’s representatives phone number ___________________________________ G.Information regarding the date, time and place of the public hearing may be obtained by calling the Yarmouth Conservation Commission office at (508) 398-2231 ext. 1288 H. Person sending this notification (applicant, representative or other) Name __________________________________________ Address ________________________________________ Town _________________ State _______ Zip _________ Telephone _______________________________________ NOTES : •Notice of the public hearing, including date, time and place will be published at least five (5) days in advance in a newspaper of general circulation. •Notice of the public hearing, including date, time and place will be posted in the Town Hall not less than forty-eight hours in advance. •You may also contact the Southeast Regional Office of the Department of Environmental Protection at (508) 946-2800 for more information about this application. 508-398-2231 Michelle West, P.E., Horsley Witten Group, Inc. Jeffery Colby, P.E., DPW Director 508-833-6600 90 Route 6A, Unit #1 Sandwich MA 508-833-6600 x109 02563 ROW along Standish Way, Map 21 Lot 30 Manage and treat stormwater runoff from Standish Way using Green Stormwater Infrastructure (GSI) including a infiltration trench, a bioretention area,and porous pavement to reduce the amount of pollutants entering Lewis Bay. Revised 2/17/2017 AFFIDAVIT OF SERVICE Under the Massachusetts Wetlands Protection Act and the Town of Yarmouth Wetlands Protection Bylaw (To be submitted to the Massachusetts Department of Environmental Protection and the Conservation Commission when filing a Notice of Intent) I, , hereby certify under the (Name of person making the Affidavit) pains and penalties of perjury that on I gave notification to abutters (Date) in compliance with the second paragraph of Massachusetts General Laws Chapter 131, Section 40, and the DEP Guide to Abutter Notification dated April 8, 1994, in connection with the following matter: A Notice of Intent filed under the Massachusetts Wetlands Protection Act by with the (Name of Municipality) (Name of Applicants) Conservation Commission on for property located at (Address of land where work is proposed) The form of the notification and a list of the abutters to whom it was given and their addresses, are attached to this Affidavit of Service. (Name) (Date) the right-of-way at the south end of Standish Way, near 124 Standish Way, Yarmouth, MA 02673 September 18, 2024 October 3, 2024 September 18, 2024 Michelle West, Horsley Witten Group, Inc. Jeffrey Colby, Town of Yarmouth Yarmouth Project Narrative i Yarmouth Stormwater Retrofit Design and Implementation Project Standish Way (MC-3), Yarmouth, MA Table of Contents SUMMARY ....................................................................................................................... 1 1.0 INTRODUCTION ...................................................................................................... 2 1.1 Background ....................................................................................................................................... 2 1.2 Project Goals .................................................................................................................................... 2 2.0 GENERAL SITE DESCRIPTION .................................................................................. 3 2.1 FEMA Designation ............................................................................................................................ 3 2.2 State-listed Rare Species Habitat ..................................................................................................... 4 2.3 Wetland Resource Areas .................................................................................................................. 4 2.4 Receiving Water and Watershed ...................................................................................................... 5 2.5 Environmental Justice Communities ................................................................................................ 5 3.0 PROPOSED PROJECT .............................................................................................. 6 3.1 Project Elements .............................................................................................................................. 6 3.2 Affected Jurisdictional Areas ............................................................................................................ 7 4.0 PROTECTION OF RESOURCE AREA INTERESTS ....................................................... 7 4.1 Riverfront Area Redevelopment ...................................................................................................... 7 4.2 Erosion and Sedimentation Control ................................................................................................. 9 4.3 Stormwater Management ................................................................................................................ 9 5.0 REFERENCES ......................................................................................................... 10 ATTACHMENTS Attachment A – Locus Maps Figure 1 – USGS Topographic Map Figure 2 – Aerial Photograph Figure 3 – FEMA Flood Zones & National Flood Insurance Program, Flood Insurance Rate Maps Figure 4 – Environmental Constraints Figure 5 – Soils Figure 6 – Environmental Justice Communities Figure 7 – Impaired Waters Attachment B – Project Plans Attachment C – Stormwater Report [electronic copy only] Notice of Intent Horsley Witten Group, Inc. Standish Way (MC-3), Yarmouth, MA September 2024 Page 1 of 11 Yarmouth Stormwater Retrofit Design and Implementation Project Standish Way, Yarmouth, MA September 2024 SUMMARY The Town of Yarmouth (the Applicant) proposes a stormwater retrofit project at Standish Way in Yarmouth, MA, aimed at enhancing water quality. The project has received backing from the Office of Coastal Zone Management's (CZM) Coastal Habitat and Water Quality grant program. Additionally, it has been designed with support from both Association to Preserve Cape Cod (APCC) and the Town of Yarmouth for potential construction sponsorship under the Cape Cod Water Resources Restoration Project, a partnership between the USDA Natural Resources Conservation Service (NRCS) and the Cape Cod Conservation District (CCCD). The proposed stormwater retrofit project at Standish Way will involve the installation of green stormwater infrastructure and replacement of impervious surfaces with porous pavement. The project naturally removes stormwater pollutants with bioretention system and native plants and reduce the volume of stormwater runoff. The proposed project has been designed to retrofit existing areas for water quality improvements while also managing runoff from larger storms and improving overall site conditions. As required for retrofit projects, the stormwater system for the project has been designed to conform to the requirements of the Massachusetts Stormwater Standards to the maximum extent practicable. Portions of the proposed project will occur within 100-200-foot Riverfront Area and Land Subject to Coastal Storm Flowage (LSCSF), coastal resource areas which are protected and regulated under the Massachusetts Wetlands Protection Act (M.G.L. Ch. 131 § 40) and the Town of Yarmouth Wetlands Protection Bylaw. The entirety of the proposed project will naturally occur in LSCSF. However, only small portions of the proposed activities will occur within the 100-200-foot riverfront area. The net result of this project will be improved water quality, reduced runoff, and improved infiltration, all of which is anticipated to significantly improve stormwater conditions at Standish Way and reduce on-going impacts to its surrounding resource areas and watershed. Downgradient resource areas will be protected during and immediately following construction through implementation of an erosion and sedimentation control program. Notice of Intent Horsley Witten Group, Inc. Standish Way (MC-3), Yarmouth, MA September 2024 Page 2 of 11 1.0 INTRODUCTION Coastal embayments across Cape Cod are significantly degraded by nutrient and bacteria impairment. Land uses, including stormwater runoff and fertilizer use, contribute on average 20% of the controllable nitrogen load within our coastal watersheds (Cape Cod Commission 208 Plan, 2015) and bacterial contamination, including cyanobacteria, regularly causes closures of shellfish beds and beaches. In the report by the Association to Preserve Cape Cod (APCC) (APCC’s 2022 State of the Waters), 90% of the coastal embayments and 39% of the freshwater ponds assessed received unacceptable water quality scores. These high nutrient loads are of concern for the environment, our coastal economy, and public health as they negatively impact habitat for fish and shellfish and can result in unsafe conditions for swimming, fishing, and boating. 1.1 Background As part of a Coastal Zone Management (CZM) Coastal Habitat and Water Quality Grant, the Town of Yarmouth Department of Public Works (DPW), together with APCC, and Horsley Witten Group, Inc. (HW) conducted a comprehensive assessment and developed a town-wide stormwater management plan. This plan identified and prioritized stormwater retrofit sites along the south shore of Yarmouth. Concept designs were evaluated and ranked based on several criteria: potential pollutant removal (including load and drainage area), the water quality status of the associated waterbody, construction cost and feasibility, and additional benefits such as restored shellfish and anadromous fish habitats, improved climate resilience, and opportunities for public education. With support from a second Coastal Habitat and Water Quality Grant, 25% designs were developed for five high-priority sites. Two sites, including the one on Standish Way, were selected to advance to 75% design and permitting. Funding is available to progress these sites to 100% design and construction. Additionally, the Standish Way project is intended for submission for construction sponsorship under the Cape Cod Water Resources Restoration Project, a collaborative initiative by the USDA Natural Resources Conservation Service (NRCS) and the Cape Cod Conservation District (CCCD). 1.2 Project Goals The goal of this project is to enhance water quality in shellfishing areas within Mill Creek and Lewis Bay by reducing or eliminating pollutant loads from stormwater runoff at the end of Standish Way through the implementation of green stormwater infrastructure (GSI) and stormwater control measures (SCMs). The primary objectives are to maximize pollutant removal—specifically bacteria, nitrogen, and phosphorus—and to increase the volume of water treated. Notice of Intent Horsley Witten Group, Inc. Standish Way (MC-3), Yarmouth, MA September 2024 Page 3 of 11 The existing SCMs in the Colonial Acres Beach parking lot offer partial treatment for runoff from Standish Way. However, due to site constraints, these systems are not adequately sized to handle a full one-inch storm. This project proposes to install additional SCMs along Standish Way to manage the untreated runoff flowing into the existing, undersized SCMs (such as porous pavement and gravel wetlands). By combining the new and existing GSI systems, the project aims to effectively treat the full one-inch storm event for the Standish Way drainage area. 2.0 GENERAL SITE DESCRIPTION Standish Way is a water access point on Lewis Bay (Attachment A, Figures 1 and 2).The site has typical characteristics of local roads in Cape Cod, featuring asphalt pavement, curbs and sidewalks. The site is situated along the southern end of Standish Way, within the right-of-way (ROW) between Windemere Road and Brewster Road, primarily bordered by residential properties except for the Colonial Acres Resort located on the east side of Standish Way. A public parking area southwest of the Standish Way and Windemere Road intersection provides additional access to Colonial Acres Beach. The southern end of the site features a riverfront area associated with a tidally influenced stream that flows east to west along the northern edge of Colonial Acres Beach. 2.1 FEMA Designation The current FEMA Flood Insurance Rate Map (Community Panel No. 25001C0569J, effective July 16, 2014) indicates that the Standish Way Road site (MC-3) is located within Special Flood Hazard Area, Zone AE (1% annual chance of flooding, base flood elevations 11 & 12 feet) and Other Areas of Flood Hazard, Zone X (0.2% annual chance of flooding with average depth less than one foot or with drainage areas less than one square mile) (Attachment A, Figures 3 and 3A). Photo 1. View of Standish Way Road leading to Lewis Bay Notice of Intent Horsley Witten Group, Inc. Standish Way (MC-3), Yarmouth, MA September 2024 Page 4 of 11 2.2 State-listed Rare Species Habitat According to the most recent version of the Massachusetts Natural Heritage Atlas (15th Edition, August 1, 2021), the project site does not occur within areas of Estimated Habitat of Rare Wildlife and/or Priority Habitat of Rare Species located at the site, as designated by the Massachusetts Natural Heritage and Endangered Species Program (NHESP) (Attachment A, Figure 4). 2.3 Wetland Resource Areas As noted, the southern end of the site supports coastal wetland resource areas, as defined under the Massachusetts Wetlands Protection Act (M.G.L. Ch. 131 § 40) and the Town of Yarmouth Wetlands Protection By-law (Chapter 143) and their respective regulations. Horsley Witten Group, Inc. (HW) wetland biologists identified and delineated the Riverfront boundary. Jurisdictional area identified on the site include; 200 foot Riverfront Area. Riverfront Area is defined under Massachusetts WPA Regulations at 310 CMR 10.58(2)(a) as: “A Riverfront Area is the area of land between a river's mean annual high water line and a parallel line measured horizontally. The riverfront area may include or overlap other resource areas or their buffer zones. The riverfront area does not have a buffer zone. The boundary of Riverfront Area is defined at 310CMR 10.58(2)3 as the river’s mean annual high-water line measured horizontally outward from the river and a parallel line located 200 feet away,” The Yarmouth Wetland Protection Regulations define Riverfront Area [2.09(1)] as follows: “The banks of and land under the ocean, ponds, streams, rivers, lakes or creeks that underlie an anadromous / catadromous fish run are important to the protection of marine fisheries, wildlife, and wildlife habitat. Land within 100 feet of such banks is likely to be significant to the protection and maintenance of these banks, and therefore to the protection of the wetlands values these areas contain.” Photo 2. Land Subject to Coastal Storm Flowage at Standish Way Notice of Intent Horsley Witten Group, Inc. Standish Way (MC-3), Yarmouth, MA September 2024 Page 5 of 11 Riverfront Area is present at the southern end of the site, associated with the unnamed tidally influenced stream that flows east to west along the north side of the Colonial Acres Beach. The stream flows into Lewis Bay through a culvert at the west side Colonial Acres Beach, beneath the revetment-protected access path that leads out to the beach from the parking area. The Riverfront Area extends landward 200 feet from the Mean High Water (MHW) Line of the unnamed stream and encompasses portions of the project site between Pilgrim Road and Windemere Road, and overlapping with LSCSF. The MHW elevation was determined using LiDAR elevation data from MassGIS in combination with hydrographic survey data from a nearby NOAA tidal station located in Chatham, MA (Station ID - 8447435). Based on this data, the Riverfront Area is present over land areas between elevation 2.31’ (NAVD88) and a parallel line that is extended 200 feet horizontally (landward) from this elevation contour. 2.4 Receiving Water and Watershed Runoff from Standish Way eventually flows into Mill Creek, which is part of the Lewis Bay watershed and ultimately discharges into Nantucket Sound. Mill Creek serves as an important habitat for shellfish cultivation but has been identified as impaired for total nitrogen and fecal coliform, according to the Massachusetts DEP 303(d) – 2022 Integrated List of Waters. The Lewis Bay Watershed, which includes Mill Creek, has an established Total Maximum Daily Load (TMDL) for nitrogen. However, Lewis Bay itself is classified under Category 5, indicating that it requires a TMDL for several impairments. The impairments for this area are as follows: • Lewis Bay (MA96-36): Located in Yarmouth within the Lewis Bay Watershed, this area is impaired for total nitrogen, estuarine bioassessments, fecal coliform, and nutrient/eutrophication biological indicators. It falls under Category 5 of the 2022 Integrated List of Waters, which means a TMDL is required. • Mill Creek (MA96-80): Located in Yarmouth within the Lewis Bay Watershed, Mill Creek is impaired for total nitrogen and fecal coliform and is listed as Category 4a in the 2022 Integrated List of Waters, indicating that a TMDL has been completed. 2.5 Environmental Justice Communities The project site is located within an EJ area where 25% of households have a median household income 65% or less than the state median household income (Attachment A, Figure 6). In Massachusetts, a neighborhood is defined as an EJ population if one or more of the following four criteria are true: the annual median household income is not more than 65 percent of the statewide annual median household income; minorities comprise 40 percent or more of the population; 25 percent or more of households lack English language proficiency, or minorities comprise 25 percent or more of the population and the annual median household income of Notice of Intent Horsley Witten Group, Inc. Standish Way (MC-3), Yarmouth, MA September 2024 Page 6 of 11 the municipality in which the neighborhood is located does not exceed 150 percent of the statewide annual median household income. The project site is located within an EJ area where 25% of households have a median household income 65% or less than the state median household income The proposed retrofit project is anticipated to benefit this community as well as the larger community in Yarmouth and the visiting public. The Commonwealth of Massachusetts defines Environmental Justice as the principle that all people have the right to be protected from environmental hazards and to live in and enjoy a clean and healthful environment. Environmental Justice entails the equal protection and meaningful involvement of all people in the development, implementation, and enforcement of environmental laws, regulations, and policies, as well as the equitable distribution of environmental benefits. Overall, the proposed project is expected to benefit both the local community and the broader population of the Town of Yarmouth, as well as the visiting public, by improving water quality within the watershed and enhancing the recreational amenities of Lewis Bay 3.0 PROPOSED PROJECT While portions of the project will occur within the 100-200-ft Buffer to Riverfront Area and LSCSF, much of the proposed work is located in the upper portions of the watershed that will result in vast improvements to the downgradient resource areas. An overview of the various project components and a discussion of the affected jurisdictional areas are described below. 3.1 Project Elements Overall, the proposed work will improve the management of over 0.4 acres of impervious cover. The proposed project consists of the following stormwater and related site development improvements: • Infiltration Trench: Designed to capture and filter stormwater, enhancing pollutant removal and promoting infiltration. • Bioretention System: Aimed at treating stormwater through a specialized soil media to effectively remove pollutants. • Porous pavement to reduce overall impervious cover and ensure compliance with ADA requirements. The proposed GSI system is designed to meet the following major objectives: • Capture, treat, and infiltrate at least the first one inch of runoff; and • Reduce peak flows and runoff volumes from the site by infiltrating the 25-year storm runoff volume (chambers only). Notice of Intent Horsley Witten Group, Inc. Standish Way (MC-3), Yarmouth, MA September 2024 Page 7 of 11 Details of the proposed project are provided on the attached project plans, entitled “Standish Way, Cape Cod Boat Stormwater Retrofit Project – Permitting Plans, Yarmouth, MA,” dated September 2024 prepared by HW (Attachment B) and within the Stormwater Management Report, dated August 2024, provided in Attachment C. 3.2 Affected Jurisdictional Areas The site supports coastal resource areas, as defined under the Massachusetts Wetlands Protection Act (M.G.L. Ch. 131 § 40) and the Town of Yarmouth Wetlands Protection Bylaw and their respective regulations. Horsley Witten Group, Inc. (HW) wetland biologists identified and delineated these resource areas during a site visit on May 21, 2024. Jurisdictional areas identified on or adjacent to the site loci include Riverfront Area and LSCSF. The project will occur entirely within the LSCSF and will be limited in the 100–200-foot Riverfront Area to support GSI implementation. Table 1. Summary of Resource Area Impacts Jurisdictional Area Impacts (SF) Nature of Impact Temporary Permanent Coastal Flood Zone (LSCSF) (el. 11) 3,100 2,600 Bioretention Area, Infiltration Trench, Timber Wall, Porous Pavement 100-200-foot Riverfront Area 640 350 Bioretention Area, Porous Pavement Note: Resource area buffers overlap within the LOW; impacts are not additive. 4.0 PROTECTION OF RESOURCE AREA INTERESTS As described in detail within the Stormwater Management Report (Attachment C), the primary purpose of this retrofit project is to improve water quality within Mill Creek and Lewis Bay. The proposed infiltration trench, bioretention system, and installation of porous pavement sidewalk will allow for removal of pollutants (specifically, bacteria, total suspended solids, phosphorus, and nitrogen) from the watershed and result in a subsequent improvement of water quality within the receiving waters. While the retrofit project will necessarily occur within the 100-200- foot Buffer to Riverfront Area and LSCSF, the proposed project is designed to meet the performance standards for work within the coastal resource areas. 4.1 Riverfront Area Redevelopment (a) At a minimum, proposed work shall result in an improvement over existing conditions of the capacity of the riverfront area to protect the interests identified in M.G.L. c. 131 § 40. Notice of Intent Horsley Witten Group, Inc. Standish Way (MC-3), Yarmouth, MA September 2024 Page 8 of 11 As noted, the proposed project aims to restore the existing degraded Riverfront Area by implementing green stormwater infrastructure (GSI) and replacing impervious surfaces with pervious ones. These efforts are expected to improve the condition of the Riverfront Area, enhance water quality within the Riverfront Area and the downgradient resources, and potentially provide improved shellfish habitat value. This would further protect the interests under the Massachusetts Wetlands Protection Act. (b) Stormwater management is provided according to standards established by the Department. The proposed stormwater BMPs are designed to meet the Massachusetts Stormwater Management Standards to the maximum extent practicable for a redevelopment project (see Attachment C – Stormwater Management Report). (c) Within 200 foot riverfront areas, proposed work shall not be located closer to the river than existing conditions or 100 feet, whichever is less, or not closer than existing conditions within 25 foot riverfront areas, except in accordance with 310 CMR 10.58(5)(f) or (g). As the entire Riverfront Area is degraded to the limits of MAHW, the proposed project will occur no closer to the river than under existing conditions. (d) Proposed work, including expansion of existing structures, shall be located outside the riverfront area or toward the riverfront area boundary and away from the river, except in accordance with 310 CMR 10.58(5)(f) or (g). The entire proposed work within the Riverfront Area will occur beyond the first one hundred feet of the unnamed tidal river and will be retrofitted to better manage and treat stormwater. (e) The area of proposed work shall not exceed the amount of degraded area, provided that the proposed work may alter up to 10% if the degraded area is less than 10% of the riverfront area, except in accordance with 310 CMR 10.58(5)(f) or (g). The proposed project will not exceed the amount of degraded area. (f) When an applicant proposes restoration on-site of degraded riverfront area, alteration may be allowed notwithstanding the criteria of 310 CMR 10.58(5)(c), (d), and (e) at a ratio in square feet of at least 1:1 of restored area to area of alteration not conforming to the criteria. Areas immediately along the river shall be selected for restoration. (…) Not applicable. The proposed project is designed to meet the redevelopment standards for work within Riverfront Area. Notice of Intent Horsley Witten Group, Inc. Standish Way (MC-3), Yarmouth, MA September 2024 Page 9 of 11 (g) When an applicant proposes mitigation either on-site or in the riverfront area within the same general area of the river basin, alteration may be allowed notwithstanding the criteria of 310 CMR 10.58(5)(c), (d), or (e) at a ratio in square feet of at least 2:1 of mitigation area to area of alteration not conforming to the criteria or an equivalent level of environmental protection where square footage is not a relevant measure. (…) Not applicable. The proposed project is designed to meet the redevelopment standards for work within Riverfront Area. 4.2 Erosion and Sedimentation Control Managing erosion and sedimentation effectively on the construction site is crucial for achieving the water quality objectives of this retrofit project and adhering to MASMS Standard 8. Although the site disturbance is less than 1 acre, thus exempting it from requiring an NPDES Construction General Permit Stormwater Pollution Plan (SWPPP), the project design incorporates a comprehensive Erosion and Sediment Control (ESC) Plan (Attachment B). This plan includes a sequence of construction activities and specific ESC measures. To address sediment control, silt socks will be placed along the downgradient edges of the disturbance area, and silt sacks will be used for inlet protection in the catch basins located downstream. Regular street sweeping along Standish Way will help prevent sediment tracking. As there is no designated construction entrance or exit, meticulous monitoring and road sweeping will be essential to manage sediment tracking effectively. Additional sediment traps or basins will be implemented as needed. Disturbed areas will be promptly stabilized using pavement, seeding, and/or erosion control blankets to further reduce erosion and sedimentation The contractor must establish all erosion controls before commencing any other project activities. The ESC Plan will define the work limits, beyond which the contractor is prohibited from performing any work. Continuous monitoring and adjustment of erosion control practices will be the contractor’s responsibility throughout the project. Erosion control measures will remain in place until the project is completed and approved by the project engineer or landscape architect. 4.3 Stormwater Management The proposed stormwater management includes a GSI approach to capture, treat, infiltrate, and detain runoff by using four stormwater GSI practices proposed throughout the site. The project includes several structural and non-structural stormwater control measures (SCMs), such as a infiltration trench for pollutant filtration and infiltration, bioretention to filter stormwater pollutants through soil media, and porous pavement sidewalks to reduce impervious cover and enhance infiltration. The stormwater management systems were Notice of Intent Horsley Witten Group, Inc. Standish Way (MC-3), Yarmouth, MA September 2024 Page 10 of 11 designed to meet Standard 1, so that no new untreated stormwater runoff will be directed to any off-site areas or resource areas. Since the proposed stormwater management system is a retrofit project undertaken solely to improve water quality at the site, it falls under the redevelopment category in accordance with the Massachusetts Stormwater Management Standards (MASMS 2008), as described in Massachusetts Stormwater Handbook, Volume 1 Chapter 1. As a redevelopment project, the design is required to meet the MASMS standards only to the maximum extent practicable (MEP). Overall, this project will significantly improve conditions at Colonial Acres Beach and reduce on-going impacts to Mill Creek and Lewis Bay. Details of the proposed stormwater design are provided in the project plans (Attachment B) and in the Stormwater Management Report (Attachment C). 5.0 REFERENCES Association to Preserve Cape Cod. 2022. State of the Waters: Cape Cod Report. Cape Cod Commission. 2015. 208 Plan – Cape Cod’s Area Wide Water Quality Management Plan Updated. Massachusetts Department of Environmental Protection (MADEP). 2008. Massachusetts Stormwater Standards Manual. MassGIS (Massachusetts Office of Geographic and Environmental Information). 2023. See their homepage at: http://www.mass.gov/mgis/. Attachment A – Locus Maps Attachment B – Project Plans Site MC-3: Standish Way Stormwater Retrofit Design and Implementation Project, 75% Design Permitting Plans Yarmouth, MA prepared by Horsley Witten Group, Inc. August 2024 AND Site MC-3 Standish Way Stormwater Retrofit Design and Implementation Project Existing Condition Plan Yarmouth, MA prepared by Horsley Witten Group, Inc. March 2024 WINDEMERE RDLEWIS BAYST A N D I S H W A Y SAGAMORE RDPILGRIM RDBREWSTER RDSAGAMORE RDBREWSTER RDProject Number:Registration:VICINITY MAPlast modified: 09/10/24 printed: 09/18/24 by jv H:\Projects\2022\22108 APCC Yarmouth\Drawings\STANDISH\22108A STANDISH CV.dwg 1234567Checked By:Drawn By:Designed By:Date Issued:Sheet Number:RevisionsAppr.Rev.DateByDescriptionGraphic Scale1-inch = 100-feetDrawing Number:Horsley Witten Group, Inc.Sustainable Environmental Solutionswww.horsleywitten.comHeadquarters90 Route 6A, Unit 1Sandwich, MA 02563Phone: (508) 833-6600Fax: (508) 833-3150112 Water Street, 6th FloorBoston, MA 02109Phone: (857) 263-81931 Turks Head Place, Suite 300Providence, RI 02903Phone: (401) 272-1717Fax: (401) 437-8368Prepared By:Plan Set:Prepared For:MASSACHUSETTSSCALE IN FEETNorthGraphic ScaleYARMOUTHNorthSCALE IN FEETGraphic ScaleSITE MC-3: STANDISH WAYSTORMWATER RETROFIT DESIGN ANDIMPLEMENTATION PROJECT - 75% DESIGNYARMOUTH, MASSACHUSETTSSEPTEMBER 202422108Aof17SITE MC-3: STANDISH WAYSTORMWATER RETROFIT DESIGN ANDIMPLEMENTATION PROJECT - 75% DESIGNYARMOUTH, MASSACHUSETTSTown of Yarmouth DPW74 Town Brook RoadWest Yarmouth, MA 02673(508) 398-2231 ext. 1250SEPTEMBER 2024JLVJLVMW113 R2 Water StreetExeter, NH 03833Phone: (603) 658-1660 YARMOUTHSITE0120001:1200001500001:150000LOCUS1CV -PERMITTING SET ONLYNOT FOR CONSTRUCTIONSheet List TableSheet NumberSheet Title1COVER SHEET2NOTES AND LEGEND3EROSION AND SEDIMENT CONTROL PLAN4SITE AND GRADING PLAN5DETAILS6PLANTING PLAN7PLANTING DETAILSGENERAL NOTES:1.SURVEY CONDUCTED BY HORSLEY WITTEN GROUP (HW) IN DECEMBER, 2023. HORIZONTAL DATUM IS MASSSTATE PLANE COORDINATE SYSTEM. DATUM ESTABLISHED BY GNSS OBSERVATIONS. THE ELEVATIONSDEPICTED HEREON WERE BASED ON THE NORTH AMERICAN VERTICAL DATUM (NAVD) OF 1988.2.THE PROPERTY LINES AND RIGHTS OF WAYS DEPICTED HAVE BEEN ESTABLISHED BY FIELD SURVEY ANDDEEDS AND PLANS OF RECORD. THE ABUTTING PROPERTIES ARE APPROXIMATE ONLY AND ARE PROVIDEDBY THE BUREAU OF GEOGRAPHIC INFORMATION (MASSGIS), COMMONWEALTH OF MASSACHUSETTS,EXECUTIVE OFFICE OF TECHNOLOGY AND SECURITY SERVICES.3.SITE INFORMATION:ADDRESS:STANDISH WAY YARMOUTH, MAZONING DISTRICT:RESIDENTIAL (R-25)4.THE PROPERTY IS LOCATED WITHIN F.I.R.M ZONE AE (EL. 11) AS SHOWN ON COMMUNITY PANEL NO.25001C0569J DATED JULY 16, 2014.5.THE WETLAND DELINEATION SHOWN HEREON WAS CONDUCTED BY THE HORSLEY WITTEN GROUP, INC. ONNOVEMBER 28, 2023.6.THIS PROJECT HAS BEEN SUPPORTED BY THE OFFICE OF COASTAL ZONE MANAGEMENT COASTAL HABITATAND WATER QUALITY GRANT PROGRAM. IN ADDITION, THIS PROJECT WAS DESIGNED IN COLLABORATIONWITH THE ASSOCIATION TO PRESERVE CAPE COD AND THE TOWN OF YARMOUTH, WITH INTENT TO BESUBMITTED FOR CONSTRUCTION SPONSORSHIP UNDER THE CAPE COD WATER RESOURCES RESTORATIONPROJECT, A JOINT INITIATIVE BY THE USDA NATURAL RESOURCES CONSERVATION SERVICE AND THE CAPECOD CONSERVATION DISTRICT. 27ofRevisions Appr.Rev.Date By Description 1 2 3 4 5 6 7NOTES AND LEGEND SITE MC-3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT - 75% DESIGN YARMOUTH, MASSACHUSETTS Survey Provided By:Sheet Number:Project Number:Registration:Prepared For:Plan Set: Plan Title:Sheet :Horsley Witten Group, Inc. 90 Route 6A Sandwich, MA 02536 Phone: 508-833-6600 Fax: 508-833-3150 Dated: December 1, 2023 Town of Yarmouth DPW 74 Town Brook Road West Yarmouth, MA 02673 Phone: (508) 398-2231 ext. 125022108Alast modified: 09/10/24 printed: 09/18/24 by jv H:\Projects\2022\22108 APCC Yarmouth\Drawings\STANDISH\22108A STANDISH CV.dwg SEPTEMBER 2024 JLV JLV MW Checked By:Designed By:Date:Drawn By: Sustainable Environmental Solutions www.horsleywitten.com 90 Route 6A, Unit 1 Sandwich, MA 02563 Phone: (508) 833-6600 Fax: (508) 833-3150 Horsley Witten Group, Inc.2CV -GENERAL CONSTRUCTION NOTES:1.ALL SITE WORK TO COMPLETE THIS PROJECT, AS INDICATED ON THE DRAWINGS, IN THE SPECIFICATIONS AND AS DESCRIBED BELOW ISTHE SOLE RESPONSIBILITY OF THE CONTRACTOR.2.IMMEDIATELY CONTACT AND COORDINATE WITH THE ENGINEER AND OWNER IF ANY DEVIATION OR ALTERATION OF THE WORKPROPOSED ON THESE DRAWINGS IS REQUIRED.3.UTILIZE ALL PRECAUTIONS AND MEASURES TO ENSURE THE SAFETY OF THE PUBLIC, ALL PERSONNEL AND PROPERTY DURINGCONSTRUCTION IN ACCORDANCE WITH OSHA STANDARDS, INCLUDING THE INSTALLATION OF TEMPORARY FENCING BARRICADES,SAFETY LIGHTING, CONES, POLICE DETAIL AND/OR FLAGMEN AS DETERMINED NECESSARY BY THE TOWN. THE CONTRACTOR ISRESPONSIBLE FOR THE COST OF POLICE DETAIL AND FOR COORDINATING WITH THE LOCAL OR STATE POLICE DEPARTMENT FOR ALLREQUIRED POLICE DETAIL.4.MAKE ALL NECESSARY CONSTRUCTION NOTIFICATIONS AND APPLY FOR AND OBTAIN ALL NECESSARY CONSTRUCTION PERMITS, PAYALL FEES INCLUDING POLICE DETAILS AND POST ALL BONDS, IF NECESSARY, ASSOCIATED WITH THE SAME, AND COORDINATE WITHTHE OWNER AND THE ENGINEER.5.ALL EXISTING CONDITIONS SHOWN ARE APPROXIMATE AND ARE BASED ON THE BEST INFORMATION AVAILABLE. PRIOR TO THE STARTOF CONSTRUCTION VERIFY THAT THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS DO NOT CONFLICT WITH ANY KNOWNEXISTING OR OTHER PROPOSED IMPROVEMENTS. IF ANY CONFLICTS ARE DISCOVERED, NOTIFY THE OWNER AND THE ENGINEERPRIOR TO INSTALLING ANY PORTION OF THE SITE WORK WHICH WOULD BE AFFECTED.6.THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES AND STRUCTURES AS INDICATED ON THE DRAWINGS ARE BASED ONRECORDS OF VARIOUS UTILITY COMPANIES, AND WHEREVER POSSIBLE, MEASUREMENTS TAKEN IN THE FIELD. THIS INFORMATION ISNOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. VERIFY THE LOCATION OF ALL UNDERGROUND UTILITIES AND STRUCTURESIN THE FIELD PRIOR TO THE START OF CONSTRUCTION. CONTACT THE APPROPRIATE UTILITY COMPANY, ANY GOVERNING PERMITTINGAUTHORITY IN THE TOWN, AND "DIGSAFE" (1-888-344-7233) AT LEAST THREE BUSINESS DAYS PRIOR TO ANY EXCAVATION WORK TOREQUEST EXACT FIELD LOCATION OF UTILITIES. THE CONTRACTOR MUST RESOLVE CONFLICTS BETWEEN THE PROPOSED UTILITIESAND FIELD-LOCATED UTILITIES AND REPORT ANY DISCREPANCIES TO THE ENGINEER IMMEDIATELY. THE ENGINEER ASSUMES NORESPONSIBILITY FOR DAMAGES INCURRED AS A RESULT OF UTILITIES OMITTED, INCOMPLETELY OR INACCURATELY SHOWN. THECONTRACTOR MUST MAINTAIN ACCURATE RECORDS OF THE LOCATION AND ELEVATION OF ALL WORK INSTALLED AND EXISTINGUTILITIES FOUND DURING CONSTRUCTION FOR THE PREPARATION OF THE AS-BUILT PLAN.7.MAINTAIN ALL EXISTING UTILITIES IN WORKING ORDER AND FREE FROM DAMAGE DURING THE ENTIRE DURATION OF THE PROJECT.REPAIR ANY DAMAGE TO EXISTING UTILITY LINES OR STRUCTURES INCURRED DURING CONSTRUCTION OPERATIONS AT NO COST TOTHE OWNER. THE CONTRACTOR IS RESPONSIBLE FOR ALL COST RELATED TO THE REPAIR OF UTILITIES. EXCAVATION REQUIREDWITHIN THE PROXIMITY OF EXISTING UTILITY LINES MUST BE DONE BY HAND.8.SAWCUT EXISTING PAVEMENT AS INDICATED ON THE DRAWINGS. BACKFILL AND COMPACT AS INDICATED ON THE DRAWING AND IN THESPECIFICATIONS. IF SETTLEMENT OCCURS DUE TO INADEQUATE COMPACTION, AS DETERMINED BY THE ENGINEER, WITHIN THEWARRANTY PERIOD, CONTRACTOR IS REQUIRED TO REMOVE, PATCH AND REPAVE AFTER ONE COMPLETE 12-MONTH CYCLE.9.IMPORT ONLY CLEAN MATERIAL. MATERIAL FROM AN EXISTING OR FORMER 21E SITE AS DEFINED BY THE MASSACHUSETTSCONTINGENCY PLAN 310 CMR 40.0000 WILL NOT BE ACCEPTED .10.ESTABLISH AND MAINTAIN ALL CONTROL POINTS AND BENCHMARKS DURING CONSTRUCTION INCLUDING BENCHMARK LOCATIONS ANDELEVATIONS AT CRITICAL AREAS. COORDINATE WITH THE ENGINEER THE LOCATION OF ALL CONTROL POINTS AND BENCHMARKS.11.SITE LAYOUT SURVEY REQUIRED FOR CONSTRUCTION MUST BE PROVIDED BY THE CONTRACTOR AND PERFORMED BY AMASSACHUSETTS' REGISTERED PROFESSIONAL LAND SURVEYOR. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING WITH THESURVEYOR FOR ALL SITE SURVEY WORK.12.MAINTAIN ALL GRADE STAKES SET BY THE SURVEYOR. GRADE STAKES ARE TO REMAIN UNTIL A FINAL INSPECTION OF THE ITEM HASBEEN COMPLETED BY THE ENGINEER. RE-STAKING OF PREVIOUSLY SURVEYED SITE FEATURES IS THE RESPONSIBILITY (INCLUDINGCOST) OF THE CONTRACTOR.13.UNLESS OTHERWISE INDICATED ON THE DRAWINGS AND/OR IN THE SPECIFICATIONS, ALL SITE CONSTRUCTION MATERIALS ANDMETHODOLOGIES ARE TO CONFORM TO THE MOST RECENT VERSION OF THE MASSACHUSETTS DEPARTMENT OF TRANSPORTATIONSTANDARD SPECIFICATIONS.14.PROVIDE ALL CONSTRUCTION SERVICE IN ACCORDANCE WITH APPLICABLE LAWS AND REGULATIONS REGARDING NOISE, VIBRATION,DUST, SEDIMENTATION CONTAINMENT, AND TRENCH WORK.15.COLLECT SOLID WASTES AND STORE IN A SECURED DUMPSTER. THE DUMPSTER MUST MEET ALL LOCAL AND STATE SOLID WASTEMANAGEMENT REGULATIONS.16.RESTORE ALL SURFACES EQUAL TO THEIR ORIGINAL CONDITION AFTER CONSTRUCTION IS COMPLETE PER SPECIFICATIONS. LEAVEALL AREAS NOT DISTURBED BY CONSTRUCTION IN THEIR NATURAL STATE. TAKE CARE TO PREVENT DAMAGE TO SHRUBS, TREES,OTHER LANDSCAPING AND/OR NATURAL FEATURES. WHEREAS THE PLANS DO NOT SHOW ALL LANDSCAPE FEATURES, EXISTINGCONDITIONS MUST BE VERIFIED BY THE CONTRACTOR IN ADVANCE OF THE WORK.17.REGULARLY INSPECT THE PERIMETER OF THE PROPERTY TO CLEAN UP AND REMOVE LOOSE CONSTRUCTION DEBRIS BEFORE ITLEAVES THE SITE. PROMPTLY REMOVE ALL DEMOLITION DEBRIS FROM THE SITE TO AN APPROVED DUMP SITE.18.ALL TRUCKS LEAVING THE SITE MUST BE COVERED.19.DO NOT WASH ANY CONCRETE TRUCKS ONSITE. REMOVE BY HAND ANY CEMENT OR CONCRETE DEBRIS LEFT IN THE DISTURBED AREA.20.BURIAL OF ANY STUMPS, SOLID DEBRIS, AND/OR STONES/BOULDERS ONSITE IS PROHIBITED. DO NOT USE ROAD SALT OR OTHERDE-ICING CHEMICALS ON THE ACCESS ROADWAY.21.AT THE END OF CONSTRUCTION, REMOVE ALL CONSTRUCTION DEBRIS AND SURPLUS MATERIALS FROM THE SITE AS INDICATED IN THESPECIFICATIONS. PERFORM A THOROUGH INSPECTION OF THE WORK PERIMETER. COLLECT AND REMOVE ALL MATERIALS AND BLOWNOR WATER CARRIED DEBRIS FROM THE SITE.GENERAL DEMOLITION NOTES:THIS PLAN SET DOES NOT INCLUDE DETAILS & SPECIFICATIONS FOR ALL DEMOLITION WORK REQUIRED WITHIN THE PROPOSEDCONSTRUCTION LIMITS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE WITH THE OWNER AND PROJECT ENGINEERS INVOLVEDWITH THE PROPOSED NEW CONSTRUCTION TO DEVELOP A SUITABLE DEMOLITION PLAN.1.UNLESS OTHERWISE NOTED, THE CONTRACTOR IS RESPONSIBLE FOR THE RELOCATION, DEMOLITION, REMOVAL AND DISPOSAL, IN ALOCATION APPROVED BY ALL GOVERNING AUTHORITIES, OF ALL EXISTING SITE ELEMENTS AND STRUCTURES INCLUDING, BUT NOTLIMITED TO ROADWAY, BITUMINOUS CONCRETE, SIDEWALKS, BERMS, FENCES, SIGNS, PLANTING BEDS, TREES, SHRUBS, UTILITIES,DRAINAGE STRUCTURES AND ALL OTHER STRUCTURES SHOWN AND NOT SHOWN WITHIN CONSTRUCTION LIMITS, AND WHERE NEEDED,TO ALLOW FOR NEW CONSTRUCTION. ALL FACILITIES TO BE REMOVED ARE TO BE UNDERCUT TO SUITABLE MATERIAL AND BROUGHTTO GRADE WITH SUITABLE COMPACTED FILL MATERIAL PER SPECIFICATIONS.2.PRIOR TO DEMOLITION OCCURRING, ALL EROSION CONTROL DEVICES ARE TO BE INSTALLED.3.REMOVE ALL DEBRIS FROM THE SITE AND DISPOSE OF THE DEBRIS IN A PROPER AND LEGAL MANNER.4.OBTAIN ALL PERMITS REQUIRED FOR DEMOLITION AND DISPOSAL.5.MAINTAIN CONTINUOUS ACCESS AND OPERATION FOR SURROUNDING FACILITIES, AS DEEMED BY THE OWNER, AT ALL TIMES DURINGDEMOLITION OF THE EXISTING FACILITIES.DEWATERING:1.IF THE WATER TABLE IS ENCOUNTERED DURING EXCAVATION, TEMPORARILY LOWER THE WATER TABLE PER SPECIFICATIONS.2.PRIOR TO ANY DEWATERING, THE DEWATERING PLAN MUST BE APPROVED BY THE ENGINEER AND THE TOWN OF YARMOUTH.3.IF DEWATERING IS NECESSARY DURING CONSTRUCTION, IMPLEMENT THE PROPER ESC MEASURES ON SITE TO PREVENT EROSION ORSEDIMENT RUNOFF. THESE MEASURES CAN INCLUDE DEWATERING BAGS, TEMPORARY STRAWBALES, SILT FENCES, SILT SOCKSAND/OR OTHER APPROVED DEVICES AS INDICATED IN THE DETAILS.BASIC CONSTRUCTION SEQUENCE:THE FOLLOWING CONSTRUCTION SEQUENCE IS TO BE USED AS A GENERAL GUIDELINE. COORDINATE WITH THE OWNER, ENGINEERS ANDLANDSCAPE ARCHITECT AND SUBMIT A PROPOSED CONSTRUCTION SEQUENCE FOR REVIEW AND APPROVAL PRIOR TO CONSTRUCTION.1.SURVEY AND STAKE THE PROPOSED LIMIT OF DISTURBANCE AND LIMIT OF SEDIMENTATION BARRIERS.2.PLACE SEDIMENTATION BARRIERS AS INDICATED ON DRAWINGS AND STAKED OUT IN THE FIELD. UNDER NO CIRCUMSTANCES IS THELIMIT OF WORK TO EXTEND BEYOND THE LIMIT OF DISTURBANCE AS INDICATED ON DRAWINGS AS APPROVED BY THE LOCALCONSERVATION COMMISSION AND DEPARTMENT OF ENVIRONMENTAL PROTECTION (DEP).3.BEGIN SITE PREPARATION, CLEARING AND DEMOLITION AS REQUIRED. TOPSOIL IS TO BE STRIPPED AND STOCKPILED IN APPROVEDLOCATIONS. TOPSOIL STOCKPILES MUST BE PROTECTED BY A SEDIMENT BARRIER4.SURVEY AND STAKE CENTERLINE OF THE PROPOSED SIDEWALK, STORMWATER MANAGEMENT AREAS AND DRAINAGE LINES.5.EXCAVATE AND ROUGH GRADE THE PROPOSED STORMWATER MANAGEMENT AREAS AND ANY ADDITIONAL TEMPORARY BASINSNECESSARY TO CONTROL SITE RUNOFF AND SEDIMENTS. TEMPORARILY STABILIZE/SEED PERMANENT STORMWATER MANAGEMENTAREAS AS NECESSARY TO REDUCE SIDE SLOPE EROSION AND SEDIMENT ACCUMULATION.6.INSTALL TEMPORARY CONVEYANCE DEVICES AS NECESSARY TO CONVEY RUNOFF AWAY FROM STORMWATER MANAGEMENT AREASDURING CONSTRUCTION.7.BEGIN ROUGH GRADING. BRING ROUGH GRADING TO PROPER ELEVATIONS AS SOON AS PRACTICABLE. COORDINATE WORK TOMINIMIZE TIME SOILS ARE UN-STABILIZED.8.INSTALL DRAINAGE PIPES AND WATER QUALITY UNIT. BEGIN WORK AT THE STORMWATER MANAGEMENT AREAS AND PROGRESSUP-GRADIENT. THE STORMWATER MANAGEMENT AREA(S) AND DRAINAGE NETWORK ARE TO BE PROTECTED FROM SEDIMENTATIONUNTIL ALL UN-STABILIZED AREAS ARE STABILIZED WITH STONE SUB-BASE OR VEGETATION. INSTALL SEDIMENT BARRIERS/INLETPROTECTION AT ALL POINTS OF ENTRY INTO THE DRAINAGE NETWORK. TAKE PARTICULAR CARE TO PROTECT THE UNDERGROUNDSTRUCTURES FROM SEDIMENT. BLOCK STORMWATER RUNOFF FROM ENTERING THE PAVED FLUME/BIORETENTION AREA UNTILENGINEER HAS APPROVED THE INSTALLED STORMWATER INFRASTRUCTURE AS INDICATED ON DRAWINGS.9.BEGIN ROAD AND SIDEWALK CONSTRUCTION PER SITE DRAWINGS. PLACE COMPACTED GRAVEL FOUNDATION AND ROUGH GRADE THEROADWAYS/SIDEWALKS IN ACCORDANCE WITH DRAWINGS WITH APPLICABLE STATE AND LOCAL REGULATIONS AS SOON AS POSSIBLE.10.ROAD AND SIDEWALK ARE NOT TO BE PAVED UNTIL THE ENTIRE PERMANENT DRAINAGE SYSTEM HAS BEEN INSTALLED AND ALL PIPECONNECTIONS COMPLETE.11.FINISH PERMANENT STABILIZATION. COMPLETE PERMANENT STORMWATER MANAGEMENT AREA SEEDING AND PLANTING AFTER THECONTRIBUTING AREA TO THE BASIN HAS REACHED A MINIMUM OF 80% STABILIZATION AND IS NO LONGER REQUIRED AS ACONSTRUCTION SEDIMENTATION BASIN.12.COMPLETE ALL REMAINING PLANTING AND SEEDING.13.SWEEP THE ROADWAY TO REMOVE ALL SEDIMENTS. REPAIR DRAINAGE OUTLETS AND BASINS AS REQUIRED. CLEAN AND FLUSH THEDRAINAGE STRUCTURES AND PIPES AT THE END OF CONSTRUCTION AND REMOVE ALL ACCUMULATED SEDIMENTS IN THESTORMWATER MANAGEMENT AREAS. CONTRACTOR MUST INSPECT THE DRAINAGE NETWORK AND REPAIR ANY DAMAGE IMMEDIATELY.14.ENGINEER TO APPROVE THE REMOVAL OF ALL TEMPORARY SOIL EROSION AND SEDIMENTATION CONTROL MEASURES INCLUDINGTHOSE BLOCKING RUNOFF FROM ENTERING THE PAVED FLUME/BIORETENTION AREA FOLLOWING VEGETATIVE ESTABLISHMENT OF ALLDISTURBED AREAS AND DETERMINE WHEN THE CONTRIBUTING AREA HAS REACHED A MINIMUM OF 80% STABILIZATION.GENERAL GRADING AND DRAINAGE NOTES:1.ALL CUT AND FILL SLOPES SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE NOTED.2.EXISTING GRADE CONTOUR INTERVALS SHOWN AT 1 FOOT.3.PROPOSED GRADE CONTOUR INTERVALS SHOWN AT 1 FOOT.4.ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE.5.PROPOSED ELEVATIONS ARE SHOWN TO FINISH PAVEMENT OR GRADE UNLESS NOTED OTHERWISE.6.ALL EARTHWORK AND SITE PREPARATION MUST BE DONE IN STRICT ACCORDANCE WITH THE RECOMMENDATIONS OF ANYSUBSURFACE INVESTIGATION OR GEOTECHNICAL REPORTS PREPARED FOR THIS SITE.7.ALL DRAINAGE STRUCTURES AND PIPES MUST BE CONNECTED TO THE DRAINAGE SYSTEM PRIOR TO THE INSTALLATION OF ANYPAVEMENT. PAVING WILL NOT BE ALLOWED IF THE DRAINAGE SYSTEM FOR THE PROPOSED PAVED AREA IS NOT COMPLETELY ANDPROPERLY INSTALLED. THIS INCLUDES THE STABILIZATION OF ALL DISTURBED AREAS CONTRIBUTING TO THE DRAINAGE SYSTEMSAND ANY STORMWATER BASIN FLOORS AND SIDE SLOPESSTORMWATER FACILITY OPERATION & MAINTENANCE:THE CONTRACTOR IS RESPONSIBLE FOR THE PROPER INSPECTION AND MAINTENANCE OF ALL STORMWATER MANAGEMENT FACILITIES ASOUTLINED BELOW DURING CONSTRUCTION AND UNTIL SUCH TIME THAT THE ROADWAYS AND ASSOCIATED UTILITIES ARE ACCEPTED BY THEOWNER AND THE ENGINEER.1.INSPECT AND RESTORE/CLEAN ALL FACILITIES (INLETS, MANHOLES, INFILTRATION BASINS, STORMWATER MANAGEMENT AREAS ASDESCRIBED BELOW OF SEDIMENT AND DEBRIS PRIOR TO THE OWNER'S ACCEPTANCE.2.REMOVE AND DISPOSE ALL SEDIMENT AND DEBRIS TO A PRE-APPROVED LOCATION.3.REFER TO THE STORMWATER REPORT FOR ADDITIONAL INFORMATION PERTAINING TO STORMWATER FACILITY OPERATION ANDMAINTENANCE REQUIREMENTS.4.AT A MINIMUM INSPECT MONTHLY AND AFTER STORM EVENTS GREATER THAN OR EQUAL TO 1" OF RAINFALL AS NECESSARY FOR THEENTIRE DURATION OF THE CONSTRUCTION PROJECT AND THE FIRST 3 MONTHS AFTER CONSTRUCTION TO ENSURE PROPERSTABILIZATION.5.SPECIFIC MAINTENANCE REQUIRED DURING CONSTRUCTION:A.DRAINAGE STRUCTURES (INLETS, CLEANOUTS, WATER QUALITY UNITS): MONITOR AND REGULARLY INSPECT ALL EXISTING ANDPROPOSED DRAINAGE STRUCTURES FOR PROPER OPERATION, COLLECTION OF LITTER OR TRASH, AND STRUCTURALDETERIORATION. CLEAN AND REMOVE SEDIMENT FRO THE STRUCTURES (INCLUDING SUMPS) AS NECESSARY, AND REPAIRWHEN REQUIRED.B.SEDIMENT FOREBAY: REGULARLY INSPECT TO ENSURE PROPER FUNCTION. REMOVE SEDIMENT BUILD-UP ON THE FLOOR OFTHE FOREBAY AND PROPERLY DISPOSE , AS NECESSARY, TO LIMIT CLOGGING. CLEAN SEDIMENT FOREBAYS PRIOR TOCOMPLETION OF CONSTRUCTION.C.BIORETENTION SYSTEMS: TAKE CARE NOT TO DRIVE MACHINERY OVER THE BIORETENTION AREA TO PREVENT SOILCOMPACTION. IT IS CRITICAL TO PREVENET STORMWATER INFLOW UNTIL FINAL SURFACE STABILIZATION IS ACHIEVED.REGULARLY INSPECT TO ENSURE PROPER FUNCTION. MONITOR AND INSPECT STRUCTURAL COMPONENTS, INCLUDING WEIRWALLS, DRAINAGE INLETS, OUTLET STRUCTURES AND SPILLWAYS, FOR PROPER FUNCTION. CLEAN AND REPAIR ANYCLOGGED STRUCTURES DURING INSPECTIONS. PRIOR TO THE COMPLETION OF CONSTRUCTION, REMOVE AND REPLACEILL-ESTABLISHED, DEAD OR SEVERELY DISEASED PLANTS, REMOVE SEDIMENT BUILD-UP AS NEEDED, AND REPLACE SOIL WHENNECESSARY. IF SEDIMENT OR ORGANIC DEBRIS BUILD-UP LIMITS THE INFILTRATION CAPABILITIES, REMOVE THE TOP 6" ORGREATER AND SURFACE ROTO-TILLED TO A DEPTH OF 12".D.INFILTRATION TRENCH: TAKE CARE NOT TO DRIVE MACHINERY OVER THE INFILTRATION TRENCH AREA TO PREVENT SOILCOMPACTION. PROTECT (INLET PROTECTION) AND REGULARLY INSPECT THE WATER QUALITY UNIT TO ENSURE PROPERFUNCTION AND SEDIMENT ACCUMULATION. CLEAN AND BUILD-UP AS NEEDED, AND CLEAN CLOGGED PIPES WHEN NECESSARY.E.ROUTINE MAINTENANCE: OTHER ROUTINE MAINTENANCE INCLUDES THE REMOVAL OF TRASH AND LITTER FROM PAVED ANDPERIMETER AREAS, AND STREET AND PARKING LOT SWEEPING UPON COMPLETION OF CONSTRUCTION TO AVOID EXCESSIVEACCUMULATION OF SEDIMENT IN THE DRAINAGE SYSTEM. INSPECT THE PIPES AND STRUCTURES FOR SEDIMENTACCUMULATION AND PROPER FLOW.EROSION & SEDIMENT CONTROL NOTES:1.DESIGNATE THE SITE CONSTRUCTION FOREMAN AS THE ON-SITE PERSONNEL RESPONSIBLE FOR THE DAILY INSPECTION ANDMAINTENANCE OF ALL SEDIMENT AND EROSION CONTROLS AND IMPLEMENTATION OF ALL NECESSARY MEASURES TO CONTROLEROSION AND PREVENT SEDIMENT FROM LEAVING THE SITE.2.INSTALL ALL EROSION AND SEDIMENT CONTROL (ESC) MEASURES AS INDICATED ON DRAWINGS IN CONSULTATION WITH THECONSERVATION AGENT, AND ENGINEER BEFORE ANY CONSTRUCTION ACTIVITIES BEGIN. INSPECT, MAINTAIN REPAIR AND REPLACEEROSION CONTROL MEASURES, AS NECESSARY, DURING THE ENTIRE CONSTRUCTION PERIOD OF THE PROJECT. THE SITE PERIMETEREROSION CONTROLS ARE THE DESIGNATED LIMIT OF WORK. INFORM ALL PERSONNEL WORKING ON THE PROJECT SITE THAT NOCONSTRUCTION ACTIVITY IS TO OCCUR BEYOND THE LIMIT OF WORK AT ANY TIME THROUGHOUT THE CONSTRUCTION PERIOD.3.MAINTAIN A MINIMUM SURPLUS OF 100 FEET OF EROSION CONTROL BARRIER (SILT FENCE, STRAWBALE, &/OR SILT SOCK) ONSITE ATALL TIMES.4.PROTECT THE EXISTING DRAINAGE INFRASTRUCTURE FROM SEDIMENTATION DURING PROJECT CONSTRUCTION UNTIL ACCEPTANCEBY THE OWNER & IN CONFORMANCE WITH THE ORDER OF CONDITIONS.5.PROTECT THE ADJACENT RESOURCE AREA FROM SEDIMENTATION DURING PROJECT CONSTRUCTION UNTIL ACCEPTANCE BY THEOWNER & IN CONFORMANCE WITH THE ORDER OF CONDITIONS.6.KEEP THE LIMIT OF CLEARING, GRADING AND DISTURBANCES TO A MINIMUM WITHIN THE PROPOSED AREA OF CONSTRUCTION. PHASETHE SITE WORK IN A MANNER TO MINIMIZE AREAS OF EXPOSED SOIL. PROPERLY INSTALL THE SEDIMENTATION CONTROLS PRIOR TOBEGINNING ANY LAND CLEARING ACTIVITY AND/OR OTHER CONSTRUCTION RELATED WORK.7.MONITOR LOCAL WEATHER REPORTS DURING CONSTRUCTION AND PRIOR TO SCHEDULING EARTHMOVING OR OTHER CONSTRUCTIONACTIVITIES WHICH LEAVE LARGE DISTURBED AREAS UNSTABILIZED. IF INCLEMENT WEATHER IS PREDICTED, USE BESTPROFESSIONAL JUDGEMENT AND GOOD CONSTRUCTION PRACTICES WHEN SCHEDULING CONSTRUCTION ACTIVITIES AND ENSURETHE NECESSARY EROSION CONTROL DEVICES ARE INSTALLED AND FUNCTIONING PROPERLY TO MINIMIZE EROSION FROM ANYIMPENDING WEATHER EVENTS.8.INSPECT EROSION AND SEDIMENT CONTROL DEVICES AND STABILIZED SLOPES ON A WEEKLY BASIS AND AFTER EACH RAINFALL EVENTOF .25 INCH OR GREATER. REPAIR IDENTIFIED PROBLEMS WITHIN 24 HOURS TO ENSURE EROSION AND SEDIMENT CONTROLS ARE INGOOD WORKING ORDER. RESET OR REPLACE MATERIALS AS REQUIRED.9.SURROUND THE PERIMETER OF SOIL STOCKPILES WITH SILT SOCK, SILT FENCE, STRAWBALES, OR A COMBINATION OF SILT FENCEWITH STRAWBALE, AS DETERMINED NECESSARY.10.DISTURBED AREAS AND SLOPES MUST NOT BE LEFT UNATTENDED OR EXPOSED FOR EXCESSIVE PERIODS OF TIME SUCH AS THEINACTIVE WINTER SEASON. PROVIDE APPROPRIATE STABILIZATION PRACTICES ON ALL DISTURBED AREAS AS SOON AS POSSIBLE BUTNOT MORE THAN 14 DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY OR PERMANENTLY CEASED,REINFORCE TEMPORARY AREAS HAVING A SLOPE GREATER THAN 3:1 WITH EROSION BLANKETS OR APPROVED EQUAL UNTIL THE SITEIS PROPERLY STABILIZED. TEMPORARY SWALES MAY ALSO BE REQUIRED IF DETERMINED NECESSARY IN THE FIELD BY THE ENGINEER.11.INSTALL A SILT SACK OR APPROVED EQUIVALENT IN EACH EXISTING CATCHBASIN RECEIVING RUNOFF FROM THE SITE. UPON THEINSTALLATION OF EACH NEW CATCH BASIN, INSTALL A SILT SACK OR APPROVED EQUIVALENT. INSPECT SILT SACKS, AFTER EACHSIGNIFICANT STORM EVENT AND REMOVE AND EMPTY AS NEEDED FOR THE DURATION OF THE CONSTRUCTION PERIOD.12.TEMPORARY SEDIMENTATION BASINS AND SWALES WILL BE CONSTRUCTED ON AN AS-NEEDED BASIS DURING CONSTRUCTION TO AIDIN THE CAPTURE OF SITE RUNOFF AND SEDIMENT. IT WILL BE THE RESPONSIBILITY OF THE SITE CONTRACTOR, IN CONSULTATION WITHTHE ENGINEER, TO SIZE AND CREATE THESE BASINS IN APPROPRIATE LOCATIONS.13.CONTAIN ALL SEDIMENT ONSITE. SWEEP ALL EXITS FROM THE SITE AS NECESSARY INCLUDING ANY SEDIMENT TRACKING. SWEEPPAVED AREAS AS NEEDED TO REMOVE SEDIMENT AND POTENTIAL POLLUTANTS ACCUMULATED DURING SITE CONSTRUCTION. TAKEEXTRA CARE IN MONITORING SEDIMENT TRACKING AND SWEEPING ROAD.14.REGULARLY REMOVE ACCUMULATED SEDIMENT FROM ALL TEMPORARY PRACTICES AND AFTER RAIN EVENTS TO MAINTAIN PROPERDRAINAGE. DISPOSE OF IN A PRE-APPROVED LOCATION.15.PROVIDE ON SITE OR MAKE READILY AVAILABLE THE NECESSARY EQUIPMENT AND SITE PERSONNEL DURING CONSTRUCTION HOURSFOR THE DURATION OF THE PROJECT TO ENSURE ALL EROSION AND SEDIMENTATION CONTROL DEVICES ARE PROPERLY MAINTAINEDAND REPAIRED IN A TIMELY AND RESPONSIBLE MANNER. IF SITE WORK IS SUSPENDED DURING THE WINTER MONTHS THECONTRACTOR MUST CONTINUE TO PROVIDE PERSONNEL AND EQUIPMENT EITHER ON SITE OR READILY AVAILABLE TO PROPERLYMAINTAIN AND REPAIR ALL EROSION AND SEDIMENTATION CONTROL DEVICES IN A TIMELY AND RESPONSIBLE MANNER16.PRIOR TO THE INSTALLATION OF FILTER FABRIC AND MEDIA WITHIN THE BIORETENTION AREAS, REMOVE AND PROPERLY DISPOSE OFSEDIMENT ACCUMULATED IN ANY PARTIALLY CONSTRUCTED OR TEMPORARY BIORETENTION/DRAINAGE AREA USED FOR SEDIMENTCONTROL DURING CONSTRUCTION. PROVIDE A SURFACE ELEVATION AT A MINIMUM 1-FOOT ABOVE THE BOTTOM OF MEDIA ELEVATIONAS SHOWN IN THE BIORETENTION SCHEDULE FOR PARTIALLY CONSTRUCTED BIORETENTION AREAS. THIS ALLOWS FOR AN OVER-DIGOF THE COLLECTED SEDIMENT FROM WITHIN THE BIORETENTION AREA PRIOR TO MEDIA/FABRIC INSTALLATION.17.CONTROL DUST BY WATERING OR OTHER APPROVED METHODS AS NECESSARY, OR AS DIRECTED BY THE ENGINEER.18.THE CONTRACTOR IS RESPONSIBLE FOR THE INSPECTION AND MAINTENANCE DURING CONSTRUCTION OF ALL STORMWATERFACILITIES INSTALLED OR AFFECTED BY THE PROJECT. REMOVE SEDIMENT OR DEBRIS COLLECTED WITHIN THESE FACILITIES ASREQUIRED FOR PROPER FUNCTION AND CONTROL OF SITE RUNOFF DURING CONSTRUCTION AND PRIOR TO THE OWNER'SACCEPTANCE.HYDWALL - RETAININGCONTOUR - MAJORCENTERLINEBERMCONTOUR - MINORWOODEN GUARDRAIL4450LIMIT OF WORKSSSILT SOCKSTORMWATER AREASYMBOLSBOULDEREXISTING TREEHANDICAP SYMBOLSIGNEXISTING SPOT GRADETEST PITCROSSWALK/PAVEMENTSTRIPING10NUMBER OF PARKING SPACESTPEL:98.45PROPOSED SPOT GRADEEL:95.00ENVIRONMENTAL4450PROPOSEDGENERALEXISTINGTREE LINECURBXXVISIBILITY FENCECONSTRUCTION FENCEPAVEMENT REMOVALDOWN SPOUTUTILITIESGAS LINEOVERHEAD WIREWATER LINESFSILT FENCESAWCUTPOROUS PAVEMENTFENCE - CHAIN LINKWALL - STONEBUILDINGGVSTONEBENCHMARKLIGHT POSTGAS VALVESEWER MANHOLESPROPERTY LINE - SURVEYFENCE VINYLEDGE OF PAVEMENTFENCE - WOOD35' UNDISTURBED BUFFER TO SALT MARSHSALT MARSHHYDRANTBOUNDARYWVCBWFPROPERTY INFORMATIONMAIL BOXWATER VALVEWETLAND FLAGCATCHBASINUP1UTILITY POLEGUYCONCRETEGRAVELDIRT PATHPROPERTY LINE - GIS50' BUFFER TO SALT MARSH100' BUFFER TO SALT MARSHSHRUBTIDAL STREAM100' RIVERFRONT AREA200' RIVERFRONT AREAFLOODZONELEGEND:WVPERMITTING SET ONLYNOT FOR CONSTRUCTIONPLAN VIEWSECTIONAREA TO BEPROTECTEDNOTES:1.SILT SOCK: SILTSOXX ORIGINAL, EXTREME, NATURAL ORIGINAL, NATURAL ORIGINAL PLUS+ WITH ALLNATURAL BIODEGRADEABLE COTTON FIBER OR MULTI-FILAMENT POLYPROPYLENE (MFPP)MANUFACTURED BY FILTREXX (WWW.FILTREX.COM) OR APPROVED EQUIVALENT.2.ALL MATERIAL TO MEET MANUFACTURER'S SPECIFICATIONS.3.SEDIMENT SILT SOCK TO BE FILLED WITH LOCALLY SOURCED FILTER MEDIA (LEAF COMPOST AND/ORWOODY MULCH) PER MANUFACTURER'S REQUIREMENTS.4.FOLLOWING CONSTRUCTION AND SITE STABILIZATION, COMPOST MATERIAL TO BE REMOVED ORDISPERSED ON SITE, AS APPROVED BY THE OWNER AND/OR ENGINEER.SILT SOCKNOT TO SCALE1'-0"±3"-4"2" x 2" WOODEN STAKE12" SILT SOCKSEDIMENT SILT SOCKSTAKE ON 10'-0"LINEAL SPACINGWATERFLOWWORK AREAAREA TO BEPROTECTEDWORK AREAINLET PROTECTIONNOT TO SCALENOTES:1.SEDIMENT CONTROL INSERTS WILL BE INSTALLEDOVER ALL CATCH BASINS/INLETS THAT WILLRECEIVE RUNOFF FROM THE PROJECT SITE.2.TEMPORARY INLET PROTECTION WILL BE REMOVEDAFTER CONTRIBUTING DRAINAGE AREA HAS BEENPERMANENTLY STABILIZED.3.MANUFACTURER WILL BE SILT SACK OR APPROVEDEQUIVALENT.1'-4" MIN.CATCH BASINOUTLETEXPANSIONRESTRAINT1" REBAR OR EQUALFOR BAG REMOVALFROM INLETOVERFLOW SLOTS ORAPPROVED EQUIV.DUMP LOOPHANDLESPROPOSEDAND/OR EXISTINGCATCH BASINSAWCUT & PAVEMENT PATCHNOT TO SCALENOTES:1.EXISTING BITUMINOUS PAVEMENT WILL BE REMOVED TO A CLEAN STRAIGHT EDGE VIA SAWCUTTING. THE SAW CUT WILL BE COMPLETED PERPENDICULAR TO THE ROADWAY/SIDEWALK.2.PRIOR TO INSTALLING THE WEARING COURSE, THE EXISTING VERTICAL PAVEMENT SURFACEWILL BE SWEPT COMPLETELY CLEAN.3.AFTER PROPER COMPACTION (SEE PAVEMENT DETAIL), SAW CUT NEW PAVEMENT ABUTMENT3/4" DEEP & FILL WITH FIBER MODIFIED ASPHALT SEALER AS SHOWN.NEW TYPE I-1 BIT. PAVEMENT WEARINGSURFACE & BINDER COURSE PAVEMENT(SEE PAVEMENT DETAIL)PAVEMENT PATCH (SEE NOTES)EX. PAVEMENTCOMPACTED SUB-BASE(SEE PAVEMENT DETAIL)SAW KERF FILLED WITH FIBERMODIFIED ASPHALT SEALER34"14" XXMB 123 UP 148/23 MB 115 UP 148/22 MB 113 RIM: 7.60' LEACHING SUMP: 3.27' RIM: 4.13' NO PIPES FOUND WATER: 1.88' SUMP: 1.13' ST A N D I S H W A YWINDEMERE ROADPILGRIM ROADSAGAMOREROADSAGAMORE ROADRETAINING WALL GRAVEL DRIVEWAY SIGN IN WOOD PLANTER BI T . W A L K VINYL FENCE SPLIT RAIL FENCE VINYL FENCE 20 PILGRIM ROAD N/F CATALONI 115 STANDISH WAY N/F CATALONI 113 STANDISH WAY N/F MACDONALD 114 STANDISH WAY N/F OCEAN RESORTS MARKETING INC. 124 STANDISH WAY N/F BULL RUN INVESTMENT CORP. C B / D H FN D 200' RIVERFRONT AREA SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSAWCUT & PAVEMENT PATCH LENGTH = 320 LF± LIMIT OF WORK 5,700 SF± REMOVE AND RESET EXISTING FENCE ONTO OWNER'S PROPERTY (COORDINATE WITH OWNER) LENGTH = 175 LF± SEE INSET 1 FOR INLET PROTECTION LOCATIONS OUTSIDE OF LIMIT OF WORK INLET PROTECTION, TYP. PAVEMENT REMOVAL AREA = 1,750 SF± PROTECT EXISTING SIGN PROTECT EXISTING HYDRANT, WATER LINE, AND VALVE REMOVE AND RESET EXISTING SIGN SILT SOCK LENGTH = 310 LF± PROTECT EXISTING SIGN/PLANTER MASS STATE PLANE RIM: 3.78' NO PIPES FOUND WATER: 1.86' SUMP: 0.70' RIM: 4.17' NO PIPES FOUND WATER: 2.00' SUMP: -0.08'50' BUFFER TO SALT MARSHBIT. BERM LENGTH = 7 LF±5' GAP IN BIT. BERM SSINLET PROTECTION, TYP. 3 7ofRevisions Appr.Rev.DateByDescription1234567EROSION AND SEDIMENT CONTROL PLANSITE MC-3: STANDISH WAYSTORMWATER RETROFIT DESIGN ANDIMPLEMENTATION PROJECT - 75% DESIGNYARMOUTH, MASSACHUSETTSSurvey Provided By:Sheet Number: Project Number: Registration:Plan Set:Plan Title:Sheet :Horsley WittenGroup, Inc.90 Route 6ASandwich, MA 02536Phone: 508-833-6600Fax: 508-833-3150Dated: December 1, 202322108A last modified: 08/06/24 printed: 09/18/24 by jvH:\Projects\2022\22108 APCC Yarmouth\Drawings\STANDISH\22108A STANDISH DM.dwgSEPTEMBER 2024JLVJLVMWChecked By:Designed By:Date:Drawn By: (in feet) GRAPHIC SCALE 010 5 10 20 40 1 INCH = 10 FEET Sustainable Environmental Solutionswww.horsleywitten.com90 Route 6A, Unit 1Sandwich, MA 02563Phone: (508) 833-6600Fax: (508) 833-3150Horsley Witten Group, Inc.3C - A 10YR 2/2 LOAMY SAND B 10YR 4/6 LOAMY SAND C 10YR 5/6 COARSE SAND NO MOTTLING SEEPAGE @ EL 1.2 ESHGW @ EL 2.3* *BASED ON MEAN HIGH WATER OF NEARBY STREAM 39" 27" 24" 0"4.5 2.5 2.2 1.2 TP 1 PERFORMED BY M. LEHMAN HORSLEY WITTEN GROUP, INC JANUARY 3, 2024 SOIL TEST PIT DATA PERMITTING SET ONLY NOT FOR CONSTRUCTION SURVEY NOTES: 1.THE TOPOGRAPHY AND EXISTING SITE CONDITIONS HEREON WERE TAKEN FROM THE SURVEY PLAN ENTITLED "EXISTING CONDITIONS PLAN" BY HORSLEY WITTEN GROUP, INC. DATED MARCH 7, 2024. INSET 1 Town of Yarmouth DPW74 Town Brook RoadWest Yarmouth, MA 02673Phone: (508) 398-2231 ext. 1250Prepared For: XXMB 123 UP 148/23 MB 115 UP 148/22 MB 113 12" RIM: 7.60' LEACHING SUMP: 3.27' RIM: 4.13' NO PIPES FOUND WATER: 1.88' SUMP: 1.13' ST A N D I S H W A YWINDEMERE ROADPILGRIM ROADSAGAMOREROADSAGAMORE ROADRETAINING WALL GRAVEL DRIVEWAY SIGN IN WOOD PLANTER BI T . W A L K VINYL FENCE SPLIT RAIL FENCE VINYL FENCE 20 PILGRIM ROAD N/F CATALONI 115 STANDISH WAY N/F CATALONI 113 STANDISH WAY N/F MACDONALD 114 STANDISH WAY N/F OCEAN RESORTS MARKETING INC. 124 STANDISH WAY N/F BULL RUN INVESTMENT CORP. C B / D H FN D 200' RIVERFRONT AREA 2%2%INFILTRATION TRENCH 1 AREA = 600 SF± WATER-DRAINAGE CROSSING 4' 2' 10' 60' BIT. BERM LENGTH = 240 LF± POROUS PAVEMENT SIDEWALK AREA = 1,220 SF± WQU 100 RIM:7.75 8" INV OUT:5.30 8" HDPE L = 10' S = 1.45% 8" PERF. PIPE L = 60' S = 0.00% CLEANOUT, TYP. 6 55 55 8 7 7 9 BIORETENTION 1 AREA = 250 SF± 3' 4.5 4.5 5.5 5.5 PAVED FLUME FOREBAY WEIR TOP: 5.00 NOTCH: 4.75 EDUCATIONAL SIGN LIMIT OF WORK 5,600 SF± LP: 4.75FOREBAY AREA = 34 SF± 4.3 6 7 7 TIMBER RETAINING WALL LENGTH = 35 LF± MAX. HEIGHT = 1.4 FT TW: 6.0 BW: 5.6 TW: 7.0 BW: 5.6 TW: 7.0 BW: 5.6 TW: 6.2 BW: 5.6 5' BIT. BERM LENGTH = 50 LF± BIT. BERM LENGTH = 7 LF± 8 8HP: 8.2 5.5 TB: 5.65 BB: 5.4 TB: 5.5 BB: 5.0 TB: 5.5 BB: 5.25 TB: 5.5 BB: 5.12 TB: 4.45 BB: 4.2 4.5 4.4 5' GAP IN BIT. BERM 5.58 5.58 4.75 4.85 2' X 4' DETECTABLE WARNING PANEL (AS PER MASSDOT STANDARDS) 2' X 4' DETECTABLE WARNING PANEL (AS PER MASSDOT STANDARDS) REINSTALL EXISTING SIGN INSTALL SIDEWALK AROUND EXISTING HYDRANT BLOCK PAVED FLUME TO PREVENT STORMWATER INFLOW UNTIL FINAL STABILIZATION HAS BEEN APPROVED BY ENGINEER 5' X 5' LANDING TO COMPLY WITH ADA REQUIREMENTS 3:1 SLOPE (MAX.) ADJUST VALVE HEIGHT TO MATCH PROPOSED GRADE 5' (MIN.) 8' 14' 11'TRANSITION LENGTH, TYP. 4' 4' MASS STATE PLANE RevisionsAppr.Rev.DateByDescription1234567SITE AND GRADING PLANSITE MC-3: STANDISH WAYSTORMWATER RETROFIT DESIGN ANDIMPLEMENTATION PROJECT - 75% DESIGNYARMOUTH, MASSACHUSETTSSurvey Provided By:Sheet Number: Project Number: Registration:Prepared For:Plan Set:Plan Title:Sheet : 4C -Horsley WittenGroup, Inc.90 Route 6ASandwich, MA 02536Phone: 508-833-6600Fax: 508-833-3150Dated: December 1, 20234 722108Aof (in feet) GRAPHIC SCALE 010 5 10 20 40 1 INCH = 10 FEET SEPTEMBER 2024JLVJLVMWChecked By:Designed By:Date:Drawn By:Sustainable Environmental Solutionswww.horsleywitten.com90 Route 6ASandwich, MA 02563508-833-6600 voice508-833-3150 faxHorsley Witten Group, Inc. GENERAL NOTES: 1.SUB-GRADE (EXISTING MATERIAL) SHALL CONSIST OF INERT MATERIAL THAT IS HARD, DURABLE STONE AND/OR COARSE SAND, FREE FROM LOAM AND CLAY TO A DEPTH NOT LESS THAN 4-FT BELOW THE FINISH PAVEMENT SURFACE. EXCAVATE SANDY-LOAM AND/OR LOAMY-SAND TOPSOIL MATERIAL FROM ALL PAVED AREAS PRIOR TO SUB-BASE INSTALLATION. 2.PLACE SUB-BASE IN MAXIMUM 8" LIFTS (COMPACTED TO 95%). 3.COMPACT SUB-GRADE FILL TO 95% COMPACTION. 4.SEE SITE LAYOUT PLAN FOR PAVEMENT WIDTH AND LOCATION. 5.SEE GRADING PLANS FOR PAVEMENT SLOPE AND CROSS SLOPE. 6.SWEEP CLEAN THE EXISTING BINDER COURSE SURFACE PRIOR TO INSTALLING THE WEARING COURSE BY A STREET SWEEPING MACHINE . 7.APPLY A TACK COAT PER SPECIFICATIONS. BITUMINOUS PAVEMENT NOT TO SCALE APPROVED SUBGRADE COMPACTED DENSE GRADE, DENSE BLENDED CRUSHED STONE OR RECLAIMED PAVEMENT BORROW CONFORMING TO STATE DOT STANDARD SPECIFICATIONS CLASS I TYPE I-1 BIT. PAVEMENT: WEARING SURFACE, ON BINDER COURSE (PER STATE DOT STANDARDS) 1 1 2" 1 12" 8" BITUMINOUS BERM NOT TO SCALE 1'-0" 3" (MIN.) 6" (MAX.) NOTES: 1.PAVEMENT PATCH WILL BE 3" TYPE I-1 BITUMINOUS CONCRETE (2" BINDER, 1" TOP). PRIOR TO INSTALLATION OF THE BITUMINOUS TOP COAT, SAWCUT & MILL 1" INTO THE EXISTING PAVEMENT AT A DISTANCE OF 1'-0" FROM THE PAVEMENT EDGE. INSTALL TOP COAT OVER THE BINDER COARSE & 1'-0" MILLED SECTION. 2.BERM CONSTRUCTED OF BITUMINOUS CONCRETE WEARING SURFACE COURSE AS SHOWN. 3.PROVIDE 1" CHAMFER OF EDGE ALONG BERM FACE. 4.BERM WILL BE CONSTRUCTED INTEGRAL WITH TOP PAVEMENT COURSE. 5.ADJUST BACKFILL GRADE (MAX. 2:1 SLOPE) TO MEET EXISTING GRADE. 1% MIN., 33% MAX.1'-0" COMPACTED APPROVED SUBGRADE EXISTING (EX.) BASE LOAM & SEED EX. GRADE BITUMINOUS BERM 8" CLEAN BANK GRAVEL EDGE OF EX. PAVEMENT NOTES: 1.SANDY-LOAM AND/OR LOAMY-SAND TOPSOIL MATERIAL WILL BE EXCAVATED FROM ALL PAVED AREAS PRIOR TO SUB-BASE INSTALLATION. 2.SUB-GRADE (EXISTING MATERIAL) WILL CONSIST OF INERT MATERIAL THAT IS HARD, DURABLE STONE AND/OR COARSE SAND, FREE FROM LOAM & CLAY TO A DEPTH NOT LESS THAN 4'-0" BELOW THE FINISH PAVEMENT SURFACE. 3.SUBGRADE FILL WILL BE COMPACTED TO 95% COMPACTION UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 4.SEE SITE AND GRADING PLAN FOR SIDEWALK WIDTH, LOCATION, & SLOPE. POROUS PAVEMENT SIDEWALK NOT TO SCALE 4" 8" 4" POROUS ASPHALT PER SPECS. CHOKER COURSE: 34" CRUSHED STONE RESERVOIR COURSE: 1-2" CLEAN WASHED CRUSHED STONE APPROVED SUBGRADE SOIL PERMEABILITY > 0.5 IN./HR. 1.0% TYP. - 2.0% MAX. PERMITTING SET ONLY NOT FOR CONSTRUCTION TIMBER RETAINING WALL NOT TO SCALE EACH TIE SET BACK 2" COMPACTED SUBGRADE EMBED TIMBER 6" MINIMUM BELOW GRADE GROUND CONTACT PRESSURE TREATED TIMBER TIE 8"X8" 4" REBAR-LOCATE 9' O.C. OR 10" TIMBERLOK SCREWS 6" LAYER OF 3/4" CRUSHED STONE Town of Yarmouth DPW74 Town Brook RoadWest Yarmouth, MA 02673Phone: (508) 398-2231 ext. 1250 5C - 5 7ofRevisions Appr.Rev.DateByDescription1234567DETAILSSITE MC-3: STANDISH WAYSTORMWATER RETROFIT DESIGN ANDIMPLEMENTATION PROJECT - 75% DESIGNYARMOUTH, MASSACHUSETTSSurvey Provided By:Sheet Number: Project Number: Registration:Plan Set:Plan Title:Sheet :Horsley WittenGroup, Inc.90 Route 6ASandwich, MA 02536Phone: 508-833-6600Fax: 508-833-3150Dated: December 1, 202322108A last modified: 09/17/24 printed: 09/18/24 by jvH:\Projects\2022\22108 APCC Yarmouth\Drawings\STANDISH\22108A STANDISH DE.dwgSEPTEMBER 2024JLVJLVMWChecked By:Designed By:Date:Drawn By:Sustainable Environmental Solutionswww.horsleywitten.com90 Route 6ASandwich, MA 02563508-833-6600 voice508-833-3150 faxHorsley Witten Group, Inc. 6" PONDING DEPTH BIORETENTION NOT TO SCALE 3 12" PLANTING SOIL SEE SPECIFICATION NOTES 3" PEA GRAVEL 1 3' MIN 3" MIN NOTES: 1.SEE BIORETENTION NOTES AND SPECIFICATIONS FOR ALL MATERIAL SPECIFICATIONS. 2.CONTRACTOR RESPONSIBLE FOR SLOPE STABILIZATION AND SAFETY MEASURES DURING CONSTRUCTION. SIDE SLOPES TO BE 3:1 MAXIMUM SLOPE. 3.LOAM AND SEED SIDE SLOPES PER SPECIFICATIONS. BOTTOM OF SOIL: 3.50 BOTTOM OF PEA GRAVEL: 3.25 BIORETENTION SURFACE : 4.50 FILTER FABRIC MIRAFI 140N OR APPROVED EQUAL SIDEWALLS ONLY APPROVED NATIVE BACKFILL MATERIAL VERTICAL EXCAVATION SLOPE PREFERRED OR ALTERNATIVE SLOPE (MAX 1:1) BIORETENTION PLANTINGS SEE PLANTING PLAN 2' (MIN.) ESTIMATED SEASONAL HIGH GROUNDWATER: 2.3' TOP OF WEIR FOREBAY NOT TO SCALE NOTES: 1.SEE PLANTABLE PAVER DETAIL AND SPECIFICATIONS FOR PLANTABLE PAVER REQUIREMENTS. 2.INSTALL PLANTABLE/PERMEABLE PAVER SYSTEM PER MANUFACTURERS REQUIREMENTS. 3.SHAPE FOREBAY AS REQUIRED WITH MIN. 6" SIDE SLOPE DEPTH. DO NOT EXCEED 3:1 SIDE SLOPES. 4.STEEL LANDSCAPE EDGING TO BE 14" THICKNESS HEAVY-DUTY STEEL WITH NATURAL FINISH. A A SECTION B-B B B SECTION A-A 6" 2" REVEAL MAX.3:1 SL O P E M A X . 12"SEE PLAN(S) SEE PLAN(S) 3" PLANTABLE CONCRETE PAVER SYSTEM (SEE DETAIL) PAVER SYSTEM BEDDING MATERIAL AND SUBGRADE COMPACTION PER MANUFACTURER'S REQUIREMENTS FLOW FOREBAY WEIR SEE LANDSCAPE PLAN(S) FOR PLANTINGS STEEL LANDSCAPE EDGING INFLOW 6" PAVED FLUME SEE DETAIL PAVED FLUME NOT TO SCALE 2 1 2 1 6" 6" 3" EXTEND FLUME TO TOE OF SLOPE 2' 1' A A 2'TOP OF SLOPE4' TRANSITION FROM CAPE COD BERM TO SIDE OF PAVED FLUME GUTTER LINE LOW POINT AT INLET CAPE COD BERM-SEE PLANS BOTTOM TREATMENT SEE SITE PLAN BITUMINOUS DRAINAGE FLUME APRON APPROVED SUBGRADE FINISH PAVEMENT BERM (SEE DETAIL) 6" CRUSHED STONE 3" TYPE I-1 BIT. CONCRETE (2" BINDER, 1" TOP) APPROVED SUBGRADE PLAN VIEW CHANNEL SECTION SECTION VIEW R = 2.0' TYP.TOE OFSLOPETOE OFSLOPETOP OFSLOPENOTES: 1.THE END SECTION TO BE UNDERCUT SO THAT THE INVERT OF THE APRON TO BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. 2.THE WIDTH OF THE END OF THE APRON TO BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1. 6.THE GEOTEXTILE FILTER FABRIC TO BE MIRAFI 140N OR EQUIVALENT BOTTOM TREATMENT PAVEMENT TO EXTEND PAST FIRST ROW OF PAVERS 4' MIN.4' 2'-0" STREET TAPERED STREET RELIEF FLOW 3" BUTT JOINT TIGHT TOGETHER SEE NOTE NOTES: 1.USE RECYCLED/RECLAIMED GRANITE CURB WHEN POSSIBLE OR BUTT TIGHTLY TO FACE OF GRANITE CURB. 2.KEY CHECKDAM INTO FOREBAY SIDE SLOPES A MINIMUM OF 24" TO PREVENT FLOW FROM DIVERTING THE CHECK DAM. 3.SEE PLAN(S) FOR CHECKDAM DIMENSIONS AND LAYOUT. FOREBAY WEIR NOT TO SCALE 6" MIN.6" 12" 6" KEY INTO SLOPE 24" MIN. ELEVATION SECTION SEE PLAN(S) NATIVE SUBGRADE FILTER FABRIC WASHED CRUSHED STONE SPLASH PAD ROUNDED RIVER STONE D50 = 3" FILTER FABRIC GRANITE VERTICAL CURB CURBING SET LEVEL 6" EDUCATIONAL SIGN NOT TO SCALE CL CL W H NOTES: 1.PANEL SIZE (WxH): 2'-0"x1'-6", 2'-0"x2'-0", 3'-0"x2'-0", 3'-6"x2'-0" (OR CUSTOM SIZE AS APPROVED). 2.NO FIELD WELDING. 3.CONTRACTOR TO ENSURE THAT DRAIN/VENT HOLES ARE DRILLED AS SPECIFIED. 4.CONTRACTOR/OWNER TO ENSURE THAT THE GRAPHIC PANEL TYPE MEETS THE SPECIFICATIONS. 5.DELIVER THE FOLLOWING ITEMS TO THE OWNER: FRAME TOUCH UP PAINT, EXTRA VANDAL-RESISTANT FASTENERS AND BIT/TOOL REQUIRED TO INSTALL/REMOVE THE FASTENERS. 6.THE COMPLETE SYSTEM, EXCEPT CONCRETE FOOTING, IS AVAILABLE FROM SOLE SOURCE PROPRIETER: ARTCRAFT DISPLAY GRAPHICS INC. #112-1533 BROADWAY ST., PORT CONQUITLAM, B.C., CANADA V3C 6P3. PHONE: 1-800-994-9451. WWW.ARTCRFT.COM (OR APPROVED EQUAL). 7.EQUAL PRODUCT TO BE VANDAL RESISTANT AND GRAFFITI RESISTANT. GRAPHIC PANEL TO BE REPLACEABLE, WATERPROOF AND NON-FADING. MATERIALS TO BE RECYCLABLE. PROVIDE 1400 DPI PRINTING PROCESS. 8.PROVIDE FINAL GRAPHIC FILES ON CD TO OWNER WITH RECORD DOCUMENT AT PROJECT CLOSE OUT. 9.PROVIDE TEN YEAR MANUFACTURER'S MATERIAL AND WORKMANSHIP WARRANTY ON ALL PRODUCTS. 1/3W 2 3 8" 1 14" CL 2'-6" TYP. 2'-3" MIN. CLR. 1'-0" 2'-6"2'-6" 2'-6" FRAMING METHOD 1 (PREFERRED) FRAMING METHOD 2 (AS APPROVED) 2'-0" CL 2'-0" 1 14" 6" SIDE ELEVATION EMBEDMENT FOOTING METHODFRONT ELEVATION EMBEDMENT FOOTING METHOD FRAME PLAN 95% COMPACTED SUBGRADE #3 REBAR WELDED TO POST CONC. FOOTING CLASS 5 (TYP.) CONDITION VARIES FINISH GRADE 3"Ø SCH. 40 STEEL POSTS WELDED TO STEEL BACK PLATE. POWDER COATED BLACK. 1/8" THK. STEEL BACK PLATE. POWDER COATED BLACK. SLOPE TO DRAIN 30° GRAPHICS ON ALUM. BACKING. ATTACHED TO STEEL BACK PLATE WITH VELCRO. ALUM. FRAME VENT HOLES FOR ALL SIDES OF FRAME WHEN USED WITH POLYCARBONATE COVER. 6" MIN. O.C. 1/8" THK. PROTECTIVE POLYCARBONATE COVER, ULTRAVIOLET STABILIZED 1" X 1" x1/16" THICK ALUM. FRAME WITH ROUNDED EDGE & MITER CUT CORNERS (TYP.) GRAPHICS EMBEDDED IN POLYCARBONATE ON 1/16" THK. ALUM. BACKING 1/8" THK. STEEL BACK PLATE POWDER COATED BLACK OPTIONAL DRAIN HOLE. DRAIN HOLES AT BOTTOM SIDE OF FRAME ONLY. 6" MIN. O.C. VANDAL RESISTANT FASTENERS IN THE BACK OF FRAME CORNERS (TYP.) SLOPE TO DRAIN 3"Ø SCH. 40 STEEL POST WELDED TO STEEL BACK PLATE. POWDER COATED BLACK. 95% COMPACTED SUBGRADE #3 REBAR WELDED TO POST CONC. FOOTING CLASS 5 (TYP.) CONDITION VARIES FINISH GRADE PLANTABLE CONCRETE PAVERS NOT TO SCALE NOTES: 1.SEE SPECIFICATIONS FOR PLANTABLE CONCRETE PAVER REQUIREMENTS. 2.REFER TO MANUFACTURERS REQUIREMENTS FOR ADDITIONAL INSTALLATION REQUIREMENTS 3.FILTER FABRIC AROUND PERIMETER AND BOTTOM OF STONE BASE. KEY IN MINIMUM 6". 12" MIN. FILTER FABRIC OVERLAP 8" SECTION A-A 0.5" A A 24" 24" COMPACTED SAND FOR LEVELING CRUSHED STONE NON-WOVEN FILTER FABRIC SUBBASE FLATTENED TO MATCH PAVERS PAVER MAT PLAN VIEW AGGREGATE INFILL. STAKING DETAIL FLOW DIRECTION STAKES PER MANUFACTURER'S SPECIFICATIONS STAKING NOTE: FOR PAVER FOREBAY, USE TWO (2) 8" GALV. RING SHANKS (14" GAUGE, 916" HEAD) PER DRIVABLE GRASS MAT OR ANY CUT MATS ON THE UPSTREAM SIDE OF MAT AT INFLOW. DRAINAGE STRUCTURE FRAME & GRATE NOT TO SCALE NOTES: 1.BASED ON EAST JORDAN IRON WORKS 2'-0" X 2'-0" ECONOMY GRATE. 2.GRATE MATERIAL-DUCTILE IRON. SECTION A-A GRATE PLAN 1'-11 34" 2'-9" 2'-9" 5 12"1'-10" 2'-0 14" 2"AA 8" GUTTER LINE 1" 916"2 516" 2" NOTES: 1.INSTALL DRAIN PIPE & FITTINGS IN STRICT ACCORDANCE WITH THE INSTALLATION RECOMMENDATIONS OF THE PIPE FITTING MANUFACTURER. SUCH INSTRUCTIONS INCLUDE BUT ARE NOT LIMITED TO CUTTING, SOLVENT CEMENTING & PRIMING, JOINTS, CONNECTIONS, TRANSITIONS & ALLOWANCE FOR THERMAL EXPANSION. 2.FOUNDATION: WHERE THE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR WILL EXCAVATE TO A DEPTH REQUIRED BY THE ENGINEER & REPLACE WITH A SUITABLE COMPACTED GRAVEL MATERIAL OR AS AN ALTERNATIVE & AT THE DISCRETION OF THE ENGINEER. THE TRENCH BOTTOM MAY BE STABILIZED USING A WOVEN GEOTEXTILE FABRIC. 3.BEDDING, HAUNCHING & INITIAL BACKFILL: SUITABLE MATERIAL WILL CONSIST OF CLEAN, HARD, PARTICLES OF GRAVEL MEETING THE FOLLOWING: SIEVE SIZE PERCENT PASSING 3/4"85-95 # 4 5-15 # 8 0-3 4.BEDDING: UNLESS OTHERWISE APPROVED BY ENGINEER, MATERIAL WILL BE INSTALLED AS REQUIRED IN ASTM D2321, LATEST EDITION. UNLESS OTHERWISE SPECIFIED BY THE ENGINEER, MINIMUM BEDDING THICKNESS WILL BE 4" FOR 4" - 2'-0" PIPE, 6" FOR 2'-6" - 3'-6 PIPE", & 1'-0" FOR 4'-0" & LARGER PIPE. 5.FINAL BACKFILL: COMPACTED NATIVE GRAVEL OR FLOWABLE FILL. 6.GENERAL BACKFILLING: (INCLUDING DISTURBED AREAS SURROUNDING TRENCHES) WILL BE PLACED & COMPACTED IN 1'-0" MAXIMUM VERTICAL LIFTS. CONTRACTOR WILL ACHIEVE 95% COMPACTION FOR THE BEDDING UNLESS OTHERWISE APPROVED BY THE ENGINEER. 7.TRENCH WIDTH: UNLESS OTHERWISE SPECIFIED BY THE ENGINEER, MINIMUM TRENCH WIDTHS WILL BE AS FOLLOWS: PAVED AREA LANDSCAPED AREA DRAINAGE PIPE TRENCH NOT TO SCALE MIN. PIPE COVER 30" REMOVE PAVEMENT WITH NEAT SAWCUT LINES MATCH EX. PAVEMENT & SUB-BASE WHERE NECESSARY NOMINAL Ø 8" 10" 1'-0" 1'-3" >1'-6" MIN. RECOMMENDED TRENCH WIDTH 2'-6" 3'-0" 3'-0" 3'-6" 5'-0" FOUNDATION UNDISTURBED EARTH SURFACE MATERIAL PER PLANS DRAINAGE PIPE MIN. TRENCH WIDTH BEDDING MATERIAL HAUNCHING TO SPRINGLINE OF PIPE INITIAL BACKFILL 6" - 1'-0" ABOVE TOP OF PIPE FINAL BACKFILL VARIES 3" 3' 6" 4" 3" SHRUB PLANTING (SEE PLANTING PLAN) POROUS PAVEMENT SIDEWALK SEE DETAIL NON-WOVEN GEOTEXTILE OR EQUAL ON TOP AND SIDES OF STONE 34" WASHED CRUSHED STONE LEVEL, STABLE SUBGRADE SCARIFIED TO 3" DEPTH. DO NOT COMPACT. 38" WASHED PEA GRAVEL INFILTRATION TRENCH CROSS SECTION A-A' NOT TO SCALE BOTTOM OF PEA GRAVEL: 4.33 BOTTOM OF 34" WASHED CRUSHED STONE: 4.58 INVERT PERFORATED PIPE: 5.08 TOP OF 34" WASHED CRUSHED STONE: 6.01 0.5' 2' (MIN.) ESTIMATED SEASONAL HIGH GROUNDWATER: 2.3' 10' 8" PERFORATED SDR-35 PVC PIPE 3/8" PERFORATIONS 3 ROWS SET AT 4-8-12 O'CLOCK (120° APART) INFILTRATION TRENCH PLAN VIEW NOT TO SCALE A' A 60' 3' (TYP.) 8" PERFORATED SDR-35 PVC PIPE CLEANOUT (TYP.) SEE DETAIL 10' POROUS PAVEMENT SIDEWALK SEE DETAIL WATER QUALITY UNIT SEE SITE PLAN FOR EXACT LOCATION LOAM AND SEED/ SHRUB PLANTING (SEE PLANTING PLAN) CLEANOUT (CO) NOT TO SCALE 1' 34" WASHED CRUSHED STONE 8" PERFORATED PVC PIPE 38" WASHED PEA GRAVEL 45° ELBOW ADAPTER FOR 8" PVC UNDERDRAIN PIPE CAST IRON CLEANOUT COVER VARIES 6" PVC THREADED CAP 6" DIA. PVC PIPE 8" TO 6" DIA. PVC REDUCER NATIVE SUBGRADE 4" LOAM AND SEED LOAMY SAND WATER QUALITY UNIT (WQU) CONTECH CDS2015-4-C CDS (OR APPROVED EQUAL) NOT TO SCALE ELEVATION A-A PLAN VIEW B-B GENERAL NOTES 1.CONTECH TO PROVIDE ALL MATERIALS UNLESS NOTED OTHERWISE. 2.FOR FABRICATION DRAWINGS WITH DETAILED STRUCTURE DIMENSIONS AND WEIGHTS, PLEASE CONTACT YOUR CONTECH CONSTRUCTION PRODUCTS REPRESENTATIVE. 3.CDS WATER QUALITY STRUCTURE SHALL BE IN ACCORDANCE WITH ALL DESIGN DATA AND INFORMATION CONTAINED IN THIS DRAWING. 4.STRUCTURE SHALL MEET AASHTO HS20 AND CASTINGS SHALL MEET AASHTO M306 LOAD RATING. 5.PVC HYDRAULIC SHEAR PLATE IS PLACED ON SHELF AT BOTTOM OF SCREEN CYLINDER. REMOVE AND REPLACE AS NECESSARY DURING MAINTENANCE CLEANING. INSTALLATION NOTES 1. ANY SUB-BASE, BACKFILL DEPTH, AND/OR ANTI-FLOTATION PROVISIONS ARE SITE-SPECIFIC DESIGN CONSIDERATIONS AND SHALL BE SPECIFIED BY ENGINEER OF RECORD. 2. CONTRACTOR TO PROVIDE EQUIPMENT WITH SUFFICIENT LIFTING AND REACH CAPACITY TO LIFT AND SET THE CDS MANHOLE STRUCTURE (LIFTING CLUTCHES PROVIDED). 3. CONTRACTOR TO ADD JOINT SEALANT BETWEEN ALL STRUCTURE SECTIONS, AND ASSEMBLE STRUCTURE. 4. CONTRACTOR TO PROVIDE, INSTALL, AND GROUT PIPES. MATCH PIPE INVERTS WITH ELEVATIONS SHOWN. 5. CONTRACTOR TO TAKE APPROPRIATE MEASURES TO ASSURE UNIT IS WATER TIGHT, HOLDING WATER TO FLOWLINE INVERT MINIMUM. IT IS SUGGESTED THAT ALL JOINTS BELOW PIPE INVERTS ARE GROUTED. CENTER OF CDS STRUCTURE, SCREEN AND SUMP OPENING PVC HYDRAULIC SHEAR PLATE 8"(8 1/8")7" FIBERGLASS SEPARATION CYLINDER AND INLET SOLIDS STORAGE SUMP SEPARATION SCREEN OUTLET PIPE PVC HYDRAULIC SHEAR PLATE (1'-4 1/8")PERMANENT POOL ELEV. OIL BAFFLE SKIRT CONTRACTOR TO GROUT TO FINISHED GRADE GRADE RINGS/RISERS A A 48" I.D. MANHOLE STRUCTURE TOP SLAB ACCESS (SEE FRAME AND GRATE DETAIL)+/-135°MAX.+/-65°MAX.BB FIBERGLASS SEPARATION CYLINDER AND INLET FRAME AND GRATE SEE DETAIL PERMITTING SET ONLY NOT FOR CONSTRUCTION Prepared For:Town of Yarmouth DPW74 Town Brook RoadWest Yarmouth, MA 02673Phone: (508) 398-2231 ext. 1250 X X12"655 55 877967788 BIORETENTION PLANTING (607 sf)(126) AM1(189) PC(252) SS2(63) SSLIMIT OF WORKINFILTRATION TRENCH(6) AMSEED MIX #1 (2,699 sf)MASS STATE PLANE1L -67ofRevisions Appr.Rev.Date By Description 1 2 3 4 5 6 7PLANTING PLAN SITE MC-3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT - 75% DESIGN YARMOUTH, MASSACHUSETTS Survey Provided By:Sheet Number:Project Number:Registration:Plan Set: Plan Title:Sheet :Horsley Witten Group, Inc. 90 Route 6A Sandwich, MA 02536 Phone: 508-833-6600 Fax: 508-833-3150 Dated: December 1, 202322108Alast modified: 09/18/24 printed: 09/18/24 by jv H:\Projects\2022\22108 APCC Yarmouth\Drawings\STANDISH\22108A STANDISH LA.dwg SEPTEMBER 2024 KJK KJK MBE Checked By:Designed By:Date:Drawn By: Sustainable Environmental Solutions www.horsleywitten.com 90 Route 6A, Unit 1 Sandwich, MA 02563 508-833-6600 phone 508-833-3150 fax Horsley Witten Group, Inc. (in feet)GRAPHIC SCALE01051020401 INCH = 10 FEETPERMITTING SET ONLYNOT FOR CONSTRUCTIONPrepared For: Town of Yarmouth DPW 74 Town Brook Road West Yarmouth, MA 02673 Phone: (508) 398-2231 ext. 1250PLANTING LAYOUT NOTES1.FOR AREAS WITH MIXED PERENNIALS AND/OR GRASSES (SHOWN AS HATCHED AREAS ON PLANS), DONOT PLANT IN A PATTERN OR WITH LARGE AREAS OF THE SAME SPECIES. RANDOMLY PLANT ASINDICATED ON THE PLANTING PLANS INTO SMALL GROUPINGS OF THE SAME SPECIES TO CREATE AMORE NATURALISTIC APPEARANCE. PLANT THE SAME PLANT SPECIES IN GROUPS OF 5-7 AND NOTLARGER THAN 7, DEPENDING ON THE OVERALL NUMBER OF PLANTINGS.SYMBOLCODEQTYBOTANICAL NAMECOMMON NAMESIZESPACINGSHRUBSAM6Aronia melanocarpaBlack Chokeberry#548" o.c.GROUND COVERS607 sfBIORETENTION PLANTINGAM1126Achillea millefoliumCommon YarrowPlugs20% @ 12" o.c.PC189Panicum virgatum 'Cape Breeze'Cape Breeze Switch GrassPlugs30% @ 12" o.c.SS2252Schizachyrium scoparium 'Standing Ovation'Standing Ovation Little BluestemPlugs40% @ 12" o.c.SS63Solidago sempervirensSeaside GoldenrodPlugs10% @ 12" o.c.2,699 sfSEED MIX #1PLANT SCHEDULESEED MIX #1Festuca ovinaSheep FescueFestuca rubra arenariaCreeping Red FescueFestuca rubra fallaxChewings FescueFestuca rubra rubraRed FescueAs Shown 2L -77ofRevisions Appr.Rev.Date By Description 1 2 3 4 5 6 7PLANTING DETAILS SITE MC-3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT - 75% DESIGN YARMOUTH, MASSACHUSETTS Survey Provided By:Sheet Number:Project Number:Registration:Plan Set: Plan Title:Sheet :Horsley Witten Group, Inc. 90 Route 6A Sandwich, MA 02536 Phone: 508-833-6600 Fax: 508-833-3150 Dated: December 1, 202322108Alast modified: 09/18/24 printed: 09/18/24 by jv H:\Projects\2022\22108 APCC Yarmouth\Drawings\STANDISH\22108A STANDISH LA.dwg SEPTEMBER 2024 KJK KJK MBE Checked By:Designed By:Date:Drawn By: Sustainable Environmental Solutions www.horsleywitten.com 90 Route 6A, Unit 1 Sandwich, MA 02563 508-833-6600 phone 508-833-3150 fax Horsley Witten Group, Inc. GENERAL PLANTING NOTES:1.THE FOLLOWING NOTES ARE PROVIDED AS GENERAL PLANTING GUIDELINESONLY. THOROUGHLY REVIEW THE PROJECT SPECIFICATIONS FOR ALLLANDSCAPE REQUIREMENTS PRIOR TO THE COMMENCEMENT OF ANY LANDSCAPEWORK. SUBMIT IN WRITING TO THE LANDSCAPE ARCHITECT ANY QUESTIONS ORCLARIFICATIONS REQUIRED AT A MINIMUM OF 30 DAYS PRIOR TO ORDERING ANYMATERIALS OR BEGINNING ANY LANDSCAPE CONSTRUCTION.2.SUBMIT TO THE LANDSCAPE ARCHITECT FOR REVIEW AND APPROVAL ALLREQUIRED LANDSCAPE SUBMITTALS AS DESCRIBED IN THE SPECIFICATIONSINCLUDING A PLANT LIST WITH PLANT SIZE AND QUANTITIES TO BE ORDEREDPRIOR TO DELIVERY TO THE PROJECT SITE.3.FURNISH AND INSTALL ALL PLANTS AS SHOWN ON THE DRAWINGS AND IN THESIZE AND QUANTITIES SPECIFIED ON THE PLANTING SCHEDULE. PLANTSUBSTITUTION SELECTION MUST BE APPROVED BY BIOLOGIST OR LANDSCAPEARCHITECT PRIOR TO INSTALLATION.4.ALL PLANTS TO COMPLY WITH APPLICABLE REQUIREMENTS OF ANSI Z60.1"AMERICAN STANDARD FOR NURSERY STOCK." LATEST EDITION, PUBLISHED BYTHE AMERICAN NURSERY AND LANDSCAPE ASSOCIATION INC.5.PLANTS TO BE GROWN UNDER CLIMATIC CONDITIONS SIMILAR TO THOSE IN THELOCALITY OF THE PROJECT FOR AT LEAST TWO (2) YEARS. USE HEALTHYNURSERY GROWN PLANTS THAT HAVE A WELL DEVELOPED ROOT SYSTEM.PLANTS MUST BE FREE OF DISEASE, INSECTS, EGGS OR LARVAE.6.INSTALL PLANTS WITHIN ONE (1) WEEK OF PURCHASE. IF PLANTS ARE TO BESTORED AT THE SITE PRIOR TO PLANTING, IT IS THE CONTRACTOR'SRESPONSIBILITY TO ENSURE THEY ARE PROPERLY MAINTAINED, WATERED, ANDREMAIN HEALTHY.7.PROCEED WITH PLANTING ONLY WHEN EXISTING AND FORECASTED WEATHERCONDITIONS PERMIT. SUBMIT TO THE LANDSCAPE ARCHITECT IN WRITING THEPROPOSED PLANTING SCHEDULE. OBTAIN APPROVAL OF PLANTING SCHEDULEFROM THE LANDSCAPE ARCHITECT PRIOR TO PERFORMING ANY WORK.8.SEASONS FOR PLANTING:SPRING:DECIDUOUS: APRIL 1 TO JUNE 15EVERGREEN:APRIL 1 TO JUNE 15PERENNIALS:APRIL 15 TO JUNE 1GROUNDCOVERS:APRIL 15 TO JUNE 1FALL:DECIDUOUS:SEPTEMBER 15 TO NOVEMBER 15EVERGREEN:SEPTEMBER 15 TO NOVEMBER 15PERENNIALS:SEPTEMBER 15 TO NOVEMBER 15GROUNDCOVERS:SEPTEMBER 15 TO NOVEMBER 159.PLANTING UNDER FROZEN CONDITIONS WILL NOT BE PERMITTED. PLANTINGBEFORE OR AFTER THE ABOVE REFERENCED PLANTING DATES WILL INCREASETHE LIKELIHOOD OF PLANT ESTABLISHMENT FAILURE. ANY DEVIATION FROM THEABOVE REFERENCED PLANTING DATES IS UNDERTAKEN AT SOLE RISK OF THECONTRACTOR AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PROVIDEANY ADDITIONAL MAINTENANCE AND WATERING WHICH MAY BE REQUIRED TOENSURE SATISFACTORY PLANT ESTABLISHMENT.10.FURNISH ONE YEAR MANUFACTURER WARRANTY FOR PLANTS, AND GROUNDCOVER AGAINST DEFECTS INCLUDING DEATH AND UNSATISFACTORY GROWTH.EXCEPTIONS ARE DEFECTS RESULTING FROM LACK OF ADEQUATE MAINTENANCE,NEGLECT OR ABUSE BY OWNER, OR ABNORMAL WEATHER CONDITIONS UNUSUALFOR WARRANTY PERIOD. THE DATE OF FINAL ACCEPTANCE OF ALL COMPLETEDPLANTING WORK ESTABLISHES THE END OF INSTALLATION AND INITIALMAINTENANCE PERIOD AND THE COMMENCEMENT OF THE GUARANTEE PERIOD.11.INSPECT ALL AREAS TO BE PLANTED OR SEEDED PRIOR TO STARTING ANYLANDSCAPE WORK. REPORT ANY DEFECTS SUCH AS INCORRECT GRADING,INCORRECT SUBGRADE ELEVATIONS OR DRAINAGE PROBLEMS, ETC. TO THELANDSCAPE ARCHITECT AND ENGINEER PRIOR TO BEGINNING WORK.COMMENCEMENT OF WORK INDICATES ACCEPTANCE OF SUBGRADE AREAS TO BEPLANTED, AND THE LANDSCAPE CONTRACTOR ASSUMES RESPONSIBILITY FORALL LANDSCAPE WORK.12.PROVIDE PROPER PREPARATION OF ALL PROPOSED PLANTED AND SEEDEDAREAS PER THE NOTES AND SPECIFICATIONS.13.ALL PLANT LAYOUT AND ACTUAL PLANTING LOCATIONS ARE TO BE FIELD VERIFIEDBY LANDSCAPE ARCHITECT PRIOR TO PLANTING. NOTIFY THE LANDSCAPEARCHITECT AT A MINIMUM OF 48 HOURS IN ADVANCE PRIOR TO SCHEDULING ANYFIELD INSPECTIONS.14.BALL AND BURLAP: REMOVE BURLAP AND WIRE BASKETS FROM TOPS OF BALLSAND FROM TOP HALF OF ROOTBALL AS INDICATED ON DRAWINGS. REMOVEPALLETS, IF ANY, BEFORE SETTING.15.POTTED PLANTS: REMOVE THE PLANT FROM THE POT AND LOOSEN OR SCORETHE ROOTS BEFORE PLANTING TO PROMOTE OUTWARDS ROOT GROWTH INTOTHE SOIL.16.PLUGS: PLANT UPRIGHT AND NOT AT AN ANGLE. DIG PLANTING HOLES LARGEENOUGH AND DEEP ENOUGH TO ACCOMMODATE THE ENTIRE ROOT MASS. PLANTPLUGS WITH NO TWISTED OR BALLED ROOTS AND WITH NO ROOTS EXPOSEDABOVE THE GRADE LINE. HAND PACK THE SOIL AROUND THE ENTIRE PLUG ROOTMASS.17.DIG THE THE PLANTING HOLE TO THE SAME DEPTH AS THE ROOT BALL AND TWOTO THREE TIMES WIDER. SCORE ALL SIDES OF THE HOLE, PLACE THE PLANT INTHE HOLE SO THE TOP OF ROOT BALL IS EVEN WITH SOIL SURFACE. FILL THEHOLE HALFWAY AND THEN ADD WATER ALLOWING IT TO SEEP INTO BACK FILLEDMATERIAL. BE SURE TO REMOVE ALL AIR POCKETS FROM BACK FILLED SOIL. DONOT SPREAD SOIL ON TOP OF THE ROOTBALL. IF SOIL IS EXTREMELY POOR,REPLACE BACK FILL WITH GOOD QUALITY TOP SOIL. AMEND THE SOIL, ASNECESSARY.18.CREATE A 2" TO 4" BERM AROUND THE EDGE OF PLANTING HOLE WITH REMAININGSOIL TO RETAIN WATER.19.REMOVE ALL PLANT TAGS AND FLAGS FROM THE PLANTS.20.MULCH ALL PLANTING BEDS AS INDICATED ON DRAWINGS. UNLESS NOTEDOTHERWISE, ALL PLANTS TO RECEIVE 2-3 INCHES OF MULCH. DO NOT PILE ORMOUND MULCH AROUND THE PLANT STEMS OR TRUNK.21.TRIM BROKEN AND DEAD BRANCHES FROM SHRUBS AFTER PLANTING. NEVERCUT A LEADER.22.DO NOT USE FERTILIZERS UNLESS SPECIFICALLY INDICATED IN THESPECIFICATIONS OR APPROVED BY THE LANDSCAPE ARCHITECT. DURINGPLANTING AND MAINTENANCE OF THE LANDSCAPING OR LAWN AREAS.ADDITIONALLY, DO NOT USE PESTICIDES, OR HERBICIDES CONTAININGINORGANIC COMPOUNDS (IOC) AS LISTED IN THE MASSACHUSETTS DRINKINGWATER REGULATION (310 CMR 22.06), OR SYNTHETIC ORGANIC COMPOUNDS (SOC)OR VOLATILE ORGANIC COMPOUNDS (VOC) AS LISTED IN THE MASSACHUSETTSDRINKING WATER REGULATION (310 CMR 22.07).GENERAL SEEDING NOTES:1.SEND A REPRESENTATIVE SAMPLE OF THE TOPSOIL TO A TESTING LABORATORY FORSTANDARD SOIL ANALYSIS AS DESCRIBED IN THE SPECIFICATIONS. SUBMIT TO THELANDSCAPE ARCHITECT AND ENGINEER TEST RESULTS WITH RECOMMENDED SOILTREATMENTS TO PROMOTE PLANT AND GRASS GROWTH. CORRECT DEFICIENCIES INTHE LOAM AND STOCKPILED TOPSOIL AS DIRECTED BY THE TESTING AGENCY.2.ALL AREAS THAT ARE DISTURBED AND/OR GRADED DURING CONSTRUCTION ARE TOBE BROUGHT TO FINISHED GRADE WITH AT LEAST 4" MINIMUM DEPTH OF GOODQUALITY LOAM AND SEEDED WITH A QUICK GERMINATING GRASS SEED SUCH AS NEWENGLAND EROSION CONTROL RESTORATION MIX OR AS SPECIFIED ON THE PLANS.3.PRIOR TO THE PLACEMENT OF TOP SOIL, LOOSEN THE SUBGRADE OF ALL PROPOSEDSEEDED AREAS TO A DEPTH OF 6" AND RAKE TO REMOVE STONES LARGER THAN 1INCH, STICKS, ROOTS, RUBBISH AND OTHER EXTRANEOUS MATTER AND LEGALLYDISPOSE TO AN OFF SITE LOCATION.4.DO NOT SPREAD TOPSOIL IF THE SUBGRADE IS FROZEN, EXCESSIVELY WET,COMPACTED OR NOT PROPERLY PREPARED PER THE NOTES AND SPECIFICATIONS.5.SEE SPECIFICATIONS FOR SEASONAL REQUIREMENTS FOR SEEDING.WATERING NOTES:1.PROVIDE PROPER PLANT CARE, MAINTENANCE AND WATERING ON SITE UNTILSUCH TIME AS THE LANDSCAPING IS ACCEPTED BY THE PROPERTY OWNER ASSATISFACTORY PER THE SPECIFICATIONS OR AS DETERMINED BY ANY WRITTENAGREEMENTS BETWEEN THE CONTRACTOR AND PROPERTY OWNER.2.ESTABLISH AN APPROPRIATE WATERING SCHEDULE FOR ALL PLANT MATERIALBASED UPON PLANT SPECIES REQUIREMENTS AND SITE CONDITIONS. PROVIDESCHEDULE IN WRITING TO THE LANDSCAPE ARCHITECT AND OWNER FOR REVIEWAND APPROVAL. ADHERE TO THE APPROVED SCHEDULE UNTIL PLANTS AREFULLY ESTABLISHED.3.AT A MINIMUM THE NEWLY SEEDED AND/OR HYDROSEEDED AREAS SHOULD BEWATERED DAILY UNTIL FULLY ESTABLISHED. SPECIAL CARE SHOULD BE TAKENTO ENSURE THAT THE AREA IS NOT SATURATED DURING WATERING. IF ANIRRIGATION SYSTEM IS NOT PROVIDED, A TEMPORARY IRRIGATION SYSTEM ORHANDHELD GARDEN HOSE SHALL BE USED FOR WATERING SEEDED AREAS. THEAREA MUST BE MAINTAINED CONSISTENTLY MOIST FOR THE BEST GERMINATIONRESULTS. ADDITIONAL WATERING MAY BE REQUIRED IF PLANTING AND SEEDINGOCCUR OUTSIDE OF THE RECOMMENDED PLANTING SEASONS.4"LOAM AND SEEDNOT TO SCALETOPSOIL- NO STONES GREATER THAN 1" Ø,COMPACT WITH A HANDROLLER IN TWODIRECTIONS AND FINE RAKE PRIOR TOSEEDING.SUBSOIL- COMPACTION NO > 90% DENSITYFINISH GRADESEED AS SPECIFIED IN NOTESAND DRAWINGS.SUBSOIL- SCARIFY AND LOOSENROUGH GRADE PRIOR TO TOPSOILPLACEMENTNOTES:1.SEE LANDSCAPE GRADING SPECIFICATIONS FOR TOPSOIL REQUIREMENTS.2.CONFIRM SUBGRADES ARE CORRECT AND POSITIVE DRAINAGE IS MAINTAINED PRIOR TOPLACEMENT OF TOPSOIL.3.NOTIFY ENGINEER/LANDSCAPE ARCHITECT FOR REVIEW OF SUBGRADE PRIOR TO PLACEMENT OFTHE TOPSOIL.PERMITTING SET ONLYNOT FOR CONSTRUCTIONPACK BACKFILL BY HANDPLANT 12-18" ON CENTER 12-18" O.C.12-18" O.C.PLANTCELLPLUG PLANTINGNOT TO SCALEAS NOTED IN PLANT LIST6" LANDSCAPESTAPLEPrepared For: Town of Yarmouth DPW 74 Town Brook Road West Yarmouth, MA 02673 Phone: (508) 398-2231 ext. 1250LOOSEN ROOTSREMOVE CONTAINERCONTAINER PLANT ROOTBALL TREATMENTNOT TO SCALESCORE ROOTBALLIF POT-BOUNDRETAIN SAME FINISH GRADE AFTERPLANTING AS ORIGINAL GRADE BEFOREDIGGINGGENTLY HAND-LOOSEN SOIL FROM AROUNDROOTBALL WITHOUT SEVERING MAIN ROOTS.SPREAD ROOTS OVER MOUND OFUNDISTURBED SUBGRADEMULCH, SEE NOTES AND SPECIFICATIONSMOUND WITH EXCAVATED SOIL TO 2" ABOVEFINISHED GRADE.PLANTING SOIL, SEE PLAN, DETAIL ANDSPECIFICATIONS.SCARIFY BOTTOM OF PLANTING HOLE 6"DEEPAPPROVED SUBGRADEMIN. 2 x ROOT BALL,SEE PLANSCONTAINERIZED MATERIAL PLANTINGNOT TO SCALE Attachment C – Stormwater Management Report prepared by Horsley Witten Group, Inc. [electronic copy submitted to Conservation Commission] STORMWATER MANAGEMENT REPORT Standish Way - Yarmouth, MA September 2024 Yarmouth Stormwater Design and Implementation Project Partner: Association to Preserve Cape Cod Owner/Operator: Town of Yarmouth i STORMWATER MANAGEMENT REPORT STANDISH WAY YARMOUTH STORMWATER DESIGN AND IMPLEMENTATION PROJECT YARMOUTH, MA Table of Contents STORMWATER CHECKLIST ........................................................................................................ iii EXECUTIVE SUMMARY .............................................................................................................. 1 1.0 INTRODUCTION ............................................................................................................. 3 1.1 Background.................................................................................................................. 3 1.2 Project Goals ............................................................................................................... 4 1.3 Design Methodology .................................................................................................... 4 2.0 Existing Conditions ........................................................................................................ 7 2.1 Receiving Water and Watershed .................................................................................. 7 2.2 Drainage Area .............................................................................................................. 8 2.3 Resource Areas ........................................................................................................... 8 2.4 Soils ............................................................................................................................. 8 3.0 Proposed Conditions.................................................................................................... 9 3.1 SCM Selection Process ............................................................................................... 9 3.2 Drainage Areas ...........................................................................................................11 3.3 Structural Stormwater Control Measures (SCMs)........................................................11 3.4 Non-structural SCMs ...................................................................................................12 4.0 Stormwater Design Components ...............................................................................12 4.1 Water Quality ..............................................................................................................13 4.2 Recharge ....................................................................................................................14 4.3 Water Quantity ............................................................................................................15 4.4 Erosion Control ...........................................................................................................16 4.5 Operation and Maintenance ........................................................................................16 4.6 Illicit Discharges ..........................................................................................................16 5.0 REFERENCES .................................................................................................................17 ii TABLES Table 1. Project MASMS Compliance Summary ........................................................................ 2 Table 2. Test Pit (TP) Results .................................................................................................... 9 Table 3. Compliance with Water Quality Volume (WQV) Requirements ....................................13 Table 4. Compliance with Pollutant Removal Requirements .....................................................14 Table 5. Compliance with Recharge Requirements ...................................................................15 Table 6. Summary of Existing and Proposed Condition Peak Flow Rates and Runoff Volumes 15 FIGURES Under Notice of Intent (NOI) Cover Figure 1 – USGS Locus Figure 2 – Ariel Figure 3 – FEMA Figure 4 – Environmental Constraints Figure 5 – Soils Figure 6- EJ Figure 7- Impaired Waters APPENDICES Appendix A: Drainage Areas Appendix B: Hydrologic/Hydraulic Model Results Appendix C: Soil Test Pit Logs Appendix D: Operation and Maintenance Guide Appendix E: Pollutant Controls During Construction Appendix F: Site Plans iii STORMWATER CHECKLIST Standish Stormwater Report Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 1 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report A. Introduction Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A Stormwater Report must be submitted with the Notice of Intent permit application to document compliance with the Stormwater Management Standards. The following checklist is NOT a substitute for the Stormwater Report (which should provide more substantive and detailed information) but is offered here as a tool to help the applicant organize their Stormwater Management documentation for their Report and for the reviewer to assess this information in a consistent format. As noted in the Checklist, the Stormwater Report must contain the engineering computations and supporting information set forth in Volume 3 of the Massachusetts Stormwater Handbook. The Stormwater Report must be prepared and certified by a Registered Professional Engineer (RPE) licensed in the Commonwealth. The Stormwater Report must include: • The Stormwater Checklist completed and stamped by a Registered Professional Engineer (see page 2) that certifies that the Stormwater Report contains all required submittals.1 This Checklist is to be used as the cover for the completed Stormwater Report. • Applicant/Project Name • Project Address • Name of Firm and Registered Professional Engineer that prepared the Report • Long-Term Pollution Prevention Plan required by Standards 4-6 • Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan required by Standard 82 • Operation and Maintenance Plan required by Standard 9 In addition to all plans and supporting information, the Stormwater Report must include a brief narrative describing stormwater management practices, including environmentally sensitive site design and LID techniques, along with a diagram depicting runoff through the proposed BMP treatment train. Plans are required to show existing and proposed conditions, identify all wetland resource areas, NRCS soil types, critical areas, Land Uses with Higher Potential Pollutant Loads (LUHPPL), and any areas on the site where infiltration rate is greater than 2.4 inches per hour. The Plans shall identify the drainage areas for both existing and proposed conditions at a scale that enables verification of supporting calculations. As noted in the Checklist, the Stormwater Management Report shall document compliance with each of the Stormwater Management Standards as provided in the Massachusetts Stormwater Handbook. The soils evaluation and calculations shall be done using the methodologies set forth in Volume 3 of the Massachusetts Stormwater Handbook. To ensure that the Stormwater Report is complete, applicants are required to fill in the Stormwater Report Checklist by checking the box to indicate that the specified information has been included in the Stormwater Report. If any of the information specified in the checklist has not been submitted, the applicant must provide an explanation. The completed Stormwater Report Checklist and Certification must be submitted with the Stormwater Report. 1 The Stormwater Report may also include the Illicit Discharge Compliance Statement required by Standard 10. If not included in the Stormwater Report, the Illicit Discharge Compliance Statement must be submitted prior to the discharge of stormwater runoff to the post-construction best management practices. 2 For some complex projects, it may not be possible to include the Construction Period Erosion and Sedimentation Control Plan in the Stormwater Report. In that event, the issuing authority has the discretion to issue an Order of Conditions that approves the project and includes a condition requiring the proponent to submit the Construction Period Erosion and Sedimentation Control Plan before commencing any land disturbance activity on the site. Standish Stormwater Report Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 2 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report B. Stormwater Checklist and Certification The following checklist is intended to serve as a guide for applicants as to the elements that ordinarily need to be addressed in a complete Stormwater Report. The checklist is also intended to provide conservation commissions and other reviewing authorities with a summary of the components necessary for a comprehensive Stormwater Report that addresses the ten Stormwater Standards. Note: Because stormwater requirements vary from project to project, it is possible that a complete Stormwater Report may not include information on some of the subjects specified in the Checklist. If it is determined that a specific item does not apply to the project under review, please note that the item is not applicable (N.A.) and provide the reasons for that determination. A complete checklist must include the Certification set forth below signed by the Registered Professional Engineer who prepared the Stormwater Report. Registered Professional Engineer’s Certification I have reviewed the Stormwater Report, including the soil evaluation, computations, Long-term Pollution Prevention Plan, the Construction Period Erosion and Sedimentation Control Plan (if included), the Long-term Post-Construction Operation and Maintenance Plan, the Illicit Discharge Compliance Statement (if included) and the plans showing the stormwater management system, and have determined that they have been prepared in accordance with the requirements of the Stormwater Management Standards as further elaborated by the Massachusetts Stormwater Handbook. I have also determined that the information presented in the Stormwater Checklist is accurate and that the information presented in the Stormwater Report accurately reflects conditions at the site as of the date of this permit application. Registered Professional Engineer Block and Signature Signature and Date Checklist Project Type: Is the application for new development, redevelopment, or a mix of new and redevelopment? New development Redevelopment Mix of New Development and Redevelopment 9/18/24 Standish Stormwater Report Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 3 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) LID Measures: Stormwater Standards require LID measures to be considered. Document what environmentally sensitive design and LID Techniques were considered during the planning and design of the project: No disturbance to any Wetland Resource Areas Site Design Practices (e.g. clustered development, reduced frontage setbacks) Reduced Impervious Area (Redevelopment Only) Minimizing disturbance to existing trees and shrubs LID Site Design Credit Requested: Credit 1 Credit 2 Credit 3 Use of “country drainage” versus curb and gutter conveyance and pipe Bioretention Cells (includes Rain Gardens) Constructed Stormwater Wetlands (includes Gravel Wetlands designs) Treebox Filter Water Quality Swale Grass Channel Green Roof Other (describe): Porous Pavement, Public Education Signage Standard 1: No New Untreated Discharges No new untreated discharges Outlets have been designed so there is no erosion or scour to wetlands and waters of the Commonwealth Supporting calculations specified in Volume 3 of the Massachusetts Stormwater Handbook included. Standish Stormwater Report Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 4 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 2: Peak Rate Attenuation Standard 2 waiver requested because the project is located in land subject to coastal storm flowage and stormwater discharge is to a wetland subject to coastal flooding. Evaluation provided to determine whether off-site flooding increases during the 100-year 24-hour storm. Calculations provided to show that post-development peak discharge rates do not exceed pre-development rates for the 2-year and 10-year 24-hour storms. If evaluation shows that off-site flooding increases during the 100-year 24-hour storm, calculations are also provided to show that post-development peak discharge rates do not exceed pre-development rates for the 100-year 24-hour storm. Standard 3: Recharge Soil Analysis provided. Required Recharge Volume calculation provided. Required Recharge volume reduced through use of the LID site Design Credits. Sizing the infiltration, BMPs is based on the following method: Check the method used. Static Simple Dynamic Dynamic Field1 Runoff from all impervious areas at the site discharging to the infiltration BMP. Runoff from all impervious areas at the site is not discharging to the infiltration BMP and calculations are provided showing that the drainage area contributing runoff to the infiltration BMPs is sufficient to generate the required recharge volume. Recharge BMPs have been sized to infiltrate the Required Recharge Volume. Recharge BMPs have been sized to infiltrate the Required Recharge Volume only to the maximum extent practicable for the following reason: Site is comprised solely of C and D soils and/or bedrock at the land surface M.G.L. c. 21E sites pursuant to 310 CMR 40.0000 Solid Waste Landfill pursuant to 310 CMR 19.000 Project is otherwise subject to Stormwater Management Standards only to the maximum extent practicable. Calculations showing that the infiltration BMPs will drain in 72 hours are provided. Property includes a M.G.L. c. 21E site or a solid waste landfill and a mounding analysis is included. 1 80% TSS removal is required prior to discharge to infiltration BMP if Dynamic Field method is used. Standish Stormwater Report Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 5 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 3: Recharge (continued) The infiltration BMP is used to attenuate peak flows during storms greater than or equal to the 10-year 24-hour storm and separation to seasonal high groundwater is less than 4 feet and a mounding analysis is provided. Documentation is provided showing that infiltration BMPs do not adversely impact nearby wetland resource areas. Standard 4: Water Quality The Long-Term Pollution Prevention Plan typically includes the following: • Good housekeeping practices; • Provisions for storing materials and waste products inside or under cover; • Vehicle washing controls; • Requirements for routine inspections and maintenance of stormwater BMPs; • Spill prevention and response plans; • Provisions for maintenance of lawns, gardens, and other landscaped areas; • Requirements for storage and use of fertilizers, herbicides, and pesticides; • Pet waste management provisions; • Provisions for operation and management of septic systems; • Provisions for solid waste management; • Snow disposal and plowing plans relative to Wetland Resource Areas; • Winter Road Salt and/or Sand Use and Storage restrictions; • Street sweeping schedules; • Provisions for prevention of illicit discharges to the stormwater management system; • Documentation that Stormwater BMPs are designed to provide for shutdown and containment in the event of a spill or discharges to or near critical areas or from LUHPPL; • Training for staff or personnel involved with implementing Long-Term Pollution Prevention Plan; • List of Emergency contacts for implementing Long-Term Pollution Prevention Plan. A Long-Term Pollution Prevention Plan is attached to Stormwater Report and is included as an attachment to the Wetlands Notice of Intent. Treatment BMPs subject to the 44% TSS removal pretreatment requirement and the one inch rule for calculating the water quality volume are included, and discharge: is within the Zone II or Interim Wellhead Protection Area is near or to other critical areas is within soils with a rapid infiltration rate (greater than 2.4 inches per hour) involves runoff from land uses with higher potential pollutant loads. The Required Water Quality Volume is reduced through use of the LID site Design Credits. Calculations documenting that the treatment train meets the 80% TSS removal requirement and, if applicable, the 44% TSS removal pretreatment requirement, are provided. Standish Stormwater Report Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 6 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 4: Water Quality (continued) The BMP is sized (and calculations provided) based on: The ½” or 1” Water Quality Volume or The equivalent flow rate associated with the Water Quality Volume and documentation is provided showing that the BMP treats the required water quality volume. The applicant proposes to use proprietary BMPs, and documentation supporting use of proprietary BMP and proposed TSS removal rate is provided. This documentation may be in the form of the propriety BMP checklist found in Volume 2, Chapter 4 of the Massachusetts Stormwater Handbook and submitting copies of the TARP Report, STEP Report, and/or other third party studies verifying performance of the proprietary BMPs. A TMDL exists that indicates a need to reduce pollutants other than TSS and documentation showing that the BMPs selected are consistent with the TMDL is provided. Standard 5: Land Uses With Higher Potential Pollutant Loads (LUHPPLs) The NPDES Multi-Sector General Permit covers the land use and the Stormwater Pollution Prevention Plan (SWPPP) has been included with the Stormwater Report. The NPDES Multi-Sector General Permit covers the land use and the SWPPP will be submitted prior to the discharge of stormwater to the post-construction stormwater BMPs. The NPDES Multi-Sector General Permit does not cover the land use. LUHPPLs are located at the site and industry specific source control and pollution prevention measures have been proposed to reduce or eliminate the exposure of LUHPPLs to rain, snow, snow melt and runoff, and been included in the long term Pollution Prevention Plan. All exposure has been eliminated. All exposure has not been eliminated and all BMPs selected are on MassDEP LUHPPL list. The LUHPPL has the potential to generate runoff with moderate to higher concentrations of oil and grease (e.g. all parking lots with >1000 vehicle trips per day) and the treatment train includes an oil grit separator, a filtering bioretention area, a sand filter or equivalent. Standard 6: Critical Areas The discharge is near or to a critical area and the treatment train includes only BMPs that MassDEP has approved for stormwater discharges to or near that particular class of critical area. Critical areas and BMPs are identified in the Stormwater Report. Standish Stormwater Report Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 7 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 7: Redevelopments and Other Projects Subject to the Standards only to the maximum extent practicable The project is subject to the Stormwater Management Standards only to the maximum Extent Practicable as a: Limited Project Small Residential Projects: 5-9 single family houses or 5-9 units in a multi-family development provided there is no discharge that may potentially affect a critical area. Small Residential Projects: 2-4 single family houses or 2-4 units in a multi-family development with a discharge to a critical area Marina and/or boatyard provided the hull painting, service and maintenance areas are protected from exposure to rain, snow, snow melt and runoff Bike Path and/or Foot Path Redevelopment Project Redevelopment portion of mix of new and redevelopment. Certain standards are not fully met (Standard No. 1, 8, 9, and 10 must always be fully met) and an explanation of why these standards are not met is contained in the Stormwater Report. The project involves redevelopment and a description of all measures that have been taken to improve existing conditions is provided in the Stormwater Report. The redevelopment checklist found in Volume 2 Chapter 3 of the Massachusetts Stormwater Handbook may be used to document that the proposed stormwater management system (a) complies with Standards 2, 3 and the pretreatment and structural BMP requirements of Standards 4-6 to the maximum extent practicable and (b) improves existing conditions. Standard 8: Construction Period Pollution Prevention and Erosion and Sedimentation Control A Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan must include the following information: • Narrative; • Construction Period Operation and Maintenance Plan; • Names of Persons or Entity Responsible for Plan Compliance; • Construction Period Pollution Prevention Measures; • Erosion and Sedimentation Control Plan Drawings; • Detail drawings and specifications for erosion control BMPs, including sizing calculations; • Vegetation Planning; • Site Development Plan; • Construction Sequencing Plan; • Sequencing of Erosion and Sedimentation Controls; • Operation and Maintenance of Erosion and Sedimentation Controls; • Inspection Schedule; • Maintenance Schedule; • Inspection and Maintenance Log Form. A Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan containing the information set forth above has been included in the Stormwater Report. Standish Stormwater Report Checklist.doc • 04/01/08 Stormwater Report Checklist • Page 8 of 8 Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Checklist (continued) Standard 8: Construction Period Pollution Prevention and Erosion and Sedimentation Control (continued) The project is highly complex and information is included in the Stormwater Report that explains why it is not possible to submit the Construction Period Pollution Prevention and Erosion and Sedimentation Control Plan with the application. A Construction Period Pollution Prevention and Erosion and Sedimentation Control has not been included in the Stormwater Report but will be submitted before land disturbance begins. The project is not covered by a NPDES Construction General Permit. The project is covered by a NPDES Construction General Permit and a copy of the SWPPP is in the Stormwater Report. The project is covered by a NPDES Construction General Permit but no SWPPP been submitted. The SWPPP will be submitted BEFORE land disturbance begins. Standard 9: Operation and Maintenance Plan The Post Construction Operation and Maintenance Plan is included in the Stormwater Report and includes the following information: Name of the stormwater management system owners; Party responsible for operation and maintenance; Schedule for implementation of routine and non-routine maintenance tasks; Plan showing the location of all stormwater BMPs maintenance access areas; Description and delineation of public safety features; Estimated operation and maintenance budget; and Operation and Maintenance Log Form. The responsible party is not the owner of the parcel where the BMP is located and the Stormwater Report includes the following submissions: A copy of the legal instrument (deed, homeowner’s association, utility trust or other legal entity) that establishes the terms of and legal responsibility for the operation and maintenance of the project site stormwater BMPs; A plan and easement deed that allows site access for the legal entity to operate and maintain BMP functions. Standard 10: Prohibition of Illicit Discharges The Long-Term Pollution Prevention Plan includes measures to prevent illicit discharges; An Illicit Discharge Compliance Statement is attached; NO Illicit Discharge Compliance Statement is attached but will be submitted prior to the discharge of any stormwater to post-construction BMPs. Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 1 EXECUTIVE SUMMARY The purpose of this report is to describe existing and proposed drainage conditions of the Standish Way site (MC-3) in Yarmouth, as well as proposed green stormwater infrastructure (GSI) structures and management strategies to reduce stormwater impacts. This project is part of efforts to improve water quality in shellfishing areas in the Town of Yarmouth by reducing pollutant loads in stormwater runoff, specifically nitrogen, bacteria, and sediment. The Standish Way site was identified as a priority stormwater retrofit in a CZM-funded assessment focused on green infrastructure Stormwater Control Measures (SCMs) and low impact design. The main goal for this site is to capture, manage and treat stormwater runoff from Standish Way prior to entering the existing SCM within the Colonial Acres Beach parking lot and ultimately discharging to Mill Creek and Lewis Bay. There are existing SCMs within and surrounding the Colonial Acres Beach parking lot, including an infiltration trench, porous pavement, and an underground gravel wetland. These systems currently treat the runoff from Windemere Road and Standish Way that is discharging to Mill Creek via the Colonial Acres Beach parking lot. Due to site constraints, the underground gravel wetland system is only able to treat the 1/2 inch storm event from the Standish Way drainage area. This project involves the development of new green stormwater infrastructure (GSI) systems along Standish Way to reduce the drainage area of the undersized gravel wetland/porous pavement system and ultimately treat the full 1 inch of runoff of the area draining to Mill Creek via the beach parking lot with the combination of the existing and proposed GSI systems. The project includes the following structural and non-structural stormwater control measures (SCMs): · Infiltration Trench to provide filtration of pollutants and infiltration · Bioretention to filter pollutants from stormwater through a soil media · Porous pavement sidewalk to reduce impervious cover and provide infiltration · Public Educational Signage to inform the public Since the proposed stormwater management system is a retrofit project undertaken solely to improve water quality at the site, it falls under the redevelopment category in accordance with the Massachusetts Stormwater Management Standards (MASMS 2008), as described in Massachusetts Stormwater Handbook, Volume 1 Chapter 1. As a redevelopment project, the design is required to meet the MASMS standards to the maximum extent practicable (MEP). In addition to the MASMS, the project meets the NRCS Conservation Practice Standard (CPS) Tree-Shrub Site Preparation (Code 490) (NRCS 2021), Stormwater Runoff Control (Code 570) (with the exception of pretreatment- See Section 4.1) (NRCS 2023), and Tree-Shrub Establishment (Code 612) (NRCS 2016) Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 2 As shown in Table 1, the proposed project meets or exceeds each MASMS standard. Each of the proposed treatment SCMs (infiltration trench and bioretention) are designed to capture and treat the full one inch of runoff of their contributing drainage areas. By diverting runoff from Standish Way to the two proposed SCMs, the existing underground gravel wetland is then able to treat the full one inch of runoff from the remainder of the Standish Way drainage area. Overall, this project will significantly improve conditions along Standish Way and reduce on-going impacts to Mill Creek and Lewis Bay, while also providing public education benefits. Table 1. Project MASMS Compliance Summary Minimum Standard Type Compliance Report Reference(s) 1 New Stormwater Conveyances Narrative Yes Section 3.3 2 Water Quantity Calculation Yes Section 4.3/Table 6/Appendix B 3 Recharge Calculation Yes Section 4.2/Table 5/Appendix B 4 Water Quality Calculation Yes Section 4.1/Table 3/Table 4/Appendix B 5 Land Uses with Higher Potential Pollutant Loading Narrative Not Applicable Section 2.0 6 Critical Areas Narrative Yes Section 4.1 7 Redevelopment Narrative Yes Section 4.0 8 Erosion Control Narrative Yes Section 4.4/Appendix F 9 Operation and Maintenance Narrative Yes Section 4.5/Appendix D 10 Illicit Discharges Narrative Yes Section 4.6 Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 3 1.0 INTRODUCTION This report provides a summary of the stormwater management systems proposed for Standish Way in Yarmouth, MA. The Yarmouth Department of Public Works is proposing this project in collaboration with the Association to Preserve Cape Cod (APCC) as a part of a town effort (Yarmouth Stormwater Design and Implementation Project) to improve water quality in shellfishing areas in the Town of Yarmouth. The proposed project has been designed to retrofit existing impervious areas for water quality improvements and improving overall site conditions. This report describes the existing and proposed site conditions and the practices to be implemented to reduce stormwater discharges and pollutants during and after construction. As required for retrofit projects, the stormwater system for the project has been designed to conform to the requirements of the Massachusetts Stormwater Management Standards (MASMS) to the maximum extent practicable. In addition, this site is identified as a priority under the Cape Cod Water Resources Restoration Project (CCWRRP) conducted by Natural Resources Conservation Science (NRCS) and the Cape Cod Conservation District (CCCD). Therefore, this project was also designed to meet the NRCS Conservation Practice Standard (CPS) Tree-Shrub Site Preparation (Code 490) (NRCS 2021), Stormwater Runoff Control (Code 570) (with the exception of pretreatment- See Section 4.1) (NRCS 2023), and Tree-Shrub Establishment (Code 612) (NRCS 2016). NRCS Code 570 is consistent with the MASMS standards with the exception of the below standards which include more stringent requirements. · Pretreatment to remove oil, grease, and sediments. - Refer to Section 4.1 · There is no Maximum Extent Practicable option for the recharge and water quality volume treatment required. - Refer Section 4.1 & 4.2 1.1 Background Coastal embayments across Cape Cod are significantly degraded by nutrient and bacteria impairment. Land uses, including stormwater runoff and fertilizer use, contribute on average 20% of the controllable nitrogen load within our coastal watersheds (Cape Cod Commission 208 Plan, 2015) and bacterial contamination, including cyanobacteria, regularly causes closures of beaches. In report (APCC’s 2022 State of the Waters), 90% of the coastal embayments and 39% of the freshwater ponds assessed received unacceptable water quality scores. These high nutrient loads are of concern for the environment, our coastal economy, and public health as they negatively impact habitat for fish and shellfish and can result in unsafe conditions for swimming, fishing and boating. As part of a Coastal Zone Management (CZM) Coastal Habitat and Water Quality Grant, the Town of Yarmouth Department of Public Works (DPW), APCC and Horsley Witten Group (HW) completed a comprehensive assessment and stormwater management plan identifying and prioritizing stormwater retrofit sites on the south shore of Yarmouth. Concept designs were ranked based on various criteria including potential pollutant removal (i.e., load and drainage area), water quality status of the associated waterbody, construction cost and feasibility, and additional human use and resource benefits (restored shellfish and anadromous fish habitat, proximity to environmental justice communities, improved climate resiliency, opportunity for public education, etc.). With additional support from a Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 4 second Coastal Habitat and Water Quality Grant, 25% designs were developed for five high-ranking priority sites, and two sites were chosen to advance to 75% designs and permitting, including this one on Standish Way. Funding is available to further advance the two priority sites through 100% design and construction. In addition, this project on Standish Way was designed with intent to be submitted for construction sponsorship under the Cape Cod Water Resources Restoration Project, a joint initiative by the USDA Natural Resources Conservation Service (NRCS) and the Cape Cod Conservation District (CCCD). 1.2 Project Goals The purpose of this project is to improve water quality in shellfishing areas in Mill Creek and Lewis Bay by reducing or eliminating pollutant loads from stormwater runoff at the end of Standish Way using green stormwater infrastructure (GSI) stormwater control measures (SCMs). Specifically, the project aims to maximize pollutant removal (% bacteria, nitrogen and phosphorus) and water quality volume treated. The existing SCMs within the Colonial Acres Beach parking lot provide some treatment of the runoff from Standish Way; however, due to site constraints, were not able to be sized to treat the full one-inch storm. This project specifically aims to propose SCMs along Standish Way to reduce the amount of untreated runoff flowing to the undersized SCMs (porous pavement/gravel wetland) and thus provide treatment of the full one-inch storm of the Standish Way drainage area with the combination of the existing and proposed GSI systems. 1.3 Design Methodology The design was completed by the following tasks: · Preliminary field assessment of the site and contributing drainage area to identify usage, physical and environmental constraints and opportunities, and long-term operation and maintenance concerns; · Determination of drainage areas and land coverage within the project area; · Selection and alternatives analysis of structural and non-structural SCMs best suited to site conditions, project goals, and projected sea level rise (SLR) (described further below); · Structural SCM sizing and performance estimates (described further below); · Hydrologic/Hydraulic Modeling (described further below); · Grading and layout of site plan; · Erosion control plan development; and · Operation and maintenance (O&M) plan development. SLR Projections Given the site’s proximity to the coast and because NRCS/CCCD look at a 50-year design life for their funded projects, an assessment of sea level rise impacts was performed to analyze impacts to different design options. Given that the site does not involve above ground structures or conveyance components Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 5 (such as culverts, bridges, etc.) and is already in a 100-year flood zone with anticipated storm surge, the focus was on estimated sea level rise (NOAA 2022) rather than storm surge/extreme flooding projections. Using NOAA’s online mapping tool https://coast.noaa.gov/slr/#, the closest scenario location on the south side of Cape Cod is one on Nantucket, which projects about 2.2 - 2.72ft SLR by 2070 under the intermediate and intermediate-high SLR scenarios. NOAA’s viewer shows that at 3 ft SLR, the parking lot and part of Windemere would be inundated (Figure 1), but at 2 ft SLR, none of these areas would be inundated (Figure 2). The proposed stormwater practices are slightly upgradient from the intersection of Standish and Windemere. Figure 1. Impact of 3-ft SLR for project area. 2070 scenario year projections shown below based on Nantucket Island modeled locations (NOAA 2022). Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 6 Figure 2. Graphic showing 2-ft SLR at project area (NOAA 2022). Perhaps more important to this project is the impact on groundwater. At the current time, the estimated seasonal high groundwater (ESHGW) is based on the nearest mean high water (2.31’). As groundwater will rise with sea level, we can anticipate that in 2070, the ESHGW will also rise ~2.2 – 2.72.’ These impacts were taken into consideration during SCM selection. SCM Performance Estimates The proposed SCMs were selected and sized to maximize pollutant load removals. Since the waterbodies this site drains to are shellfish growing areas, have water quality impairments and are subject to TMDLs, the SCMs were chosen to maximize not only total suspended solids (TSS) removal, but total nitrogen (TN), total phosphorus (TP) and bacteria load reductions as well. MASMS was used as a reference for TSS removal estimates for bioretentions and infiltration trenches, but the more recently developed pollutant load removal curves (USEPA 2021 & Paradigm Environmental 2019) were used for TP, TN, and bacteria.1 Hydrologic/Hydraulic Modeling Existing and proposed conditions for the project area were modeled using HydroCAD software, which combines USDA Natural Resources Conservation Service hydrology and hydraulic techniques (commonly known as SCS TR-55 and TR-20) to generate hydrographs. Conditions were evaluated for the water 1 It is important to note that these curves have a crosswalk to help users determine which specific curve to reference: for infiltrating trenches, the appropriate curve is the Infiltration Trench (Soil infiltration rate = 8.27 in/hr) Performance Curve, for infiltrating bioretentions (no liners/underdrains), the appropriate curve is the Surface Infiltration (Soil infiltration rate = 2.41 in/hr) Performance Curve, and for subsurface gravel wetlands, the appropriate curve is the Gravel Wetland Performance Curve. Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 7 quality event (storm that produces 1 inch of runoff, or a roughly 1.2-inch rain event) as well as larger storm events, including the 2-, 10-, 25- and 100-year 24-hour Type III storm events. The rainfall depths used for each storm event are the NOAA+ values (NOAA Atlas 14 90% Upper Confidence value multiplied by 0.9) (NOAA NWS, 2017). Rainfall values are included in Appendix A. 2.0 Existing Conditions The Standish Way site (MC-3) is located along the southern end of Standish Way, at the north-central side of Lewis Bay, with project elements proposed within the Standish Way ROW between Windemere Road and Sagamore Road. The Standish Way ROW is primarily bordered by residential properties in the vicinity of the proposed project with the exception of the Colonial Acres Resort located on the east side of Standish Way. Southwest of the intersection between Standish Way and Windemere Road is a public parking area providing access to Mill Creek and Colonial Acres Beach on Lewis Bay. The site’s land use is not classified as a land use with higher potential pollutant loads (LUHPPL) and thus, is not subject to MASMS Standard 5. There are several existing SCMs within and surrounding the Colonial Acres Beach parking lot, including an infiltration trench, porous pavement, and an underground gravel wetland. The infiltration trench is located at the end of Standish Way within the Right of Way (ROW). Two catch basin located at the intersection of Windemere Road and Standish Way connect into the infiltration trench. These catch basins capture runoff from Windemere Road, and it is assumed the infiltration trench was sized to treat the 1-inch storm event. Within recent years, the Town installed porous pavement in the Colonial Acres Beach parking lot with an underground gravel wetland. This system receives runoff from Standish Way in addition to the runoff from the parking lot itself. Due to site constraints, this system is only able to treat the ½-inch storm event. Additionally, there are two existing leaching catch basins at the intersection of Sagamore Road and Standish Way that capture runoff from the west side of Standish Way upgradient from the proposed site. 2.1 Receiving Water and Watershed Standish Way runoff ultimately discharges into Mill Creek, which flows into Lewis Bay, a bay opens into Nantucket Sound. Mill Creek provides habitat for shellfish growing areas. However, it is listed as impaired for total nitrogen and fecal coliform by the most recent Massachusetts DEP 303(d) – 2022 Integrated list of Waters. Mill Creek is located in the Lewis Bay Watershed, for which total maximum daily load documents (TMDLs) has been developed for nitrogen. Lewis Bay itself requires a TMDL, as it falls under Category 5. The full list of impairments for this portion of the watershed is listed below, and a map showing these resources is included in NOI Narrative Figure 7: · Lewis Bay (MA96-36) Yarmouth, Lewis Bay Watershed – Impaired for total nitrogen, estuarine bioassessments, fecal coliform, and nutrient/eutrophication biological indicators; Category 5 (TMDL required) of the 2022 Integrated List of Waters. Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 8 · Mill Creek (MA96-80) Yarmouth, Lewis Bay Watershed – Impaired for total nitrogen and fecal coliform; Category 4a (TMDL completed) of the 2022 Integrated List of Waters. 2.2 Drainage Area Two existing drainage area maps were created including the overall drainage area map and the existing project drainage area map. The overall drainage area map includes the drainage areas flowing to Mill Creek via the Colonial Acres Beach parking lot (SP1). The total area draining to SP1 is approximately 2.74 acres, with 1.30 acres of that being impervious area, and is comprised of three drainage areas: DA1, DA2, and DA3. DA1 is the project drainage area, which includes runoff from Standish Way flowing toward the Colonial Acres Beach parking lot. DA2 is the beach parking lot area itself that flows to the existing underground gravel wetland via porous pavement. DA3 is the Windemere Road drainage area that flows to the existing infiltration trench. See the overall drainage area map (to Mill Creek) and a detailed breakdown of land cover in Appendix A. This project specifically aims to provide treatment opportunities along Standish Way to reduce the amount of untreated runoff entering the undersized gravel wetland (SP1A) and therefore, the HydroCAD modelling focuses on DA1. This area is approximately 1.46 acres with 0.63 acres of that being impervious area. It consists of residential properties, lawn areas, and road pavement. See the existing drainage area map (Project MC-3) and a detailed breakdown of land cover in Appendix A, as well as the existing HydroCAD model report in Appendix B. 2.3 Resource Areas HW wetland biologists delineated several resource areas at the site in November 2023. A full description of these resource areas is included in NOI Narrative, and their locations and associated buffers are shown on the plans in Appendix F. The only wetland resource areas identified at the site are the 200-ft Buffer to Riverfront Area and the 100-year FEMA flood zone (NOI Narrative Figure 3). Since the site discharges near a public beach, shellfish growing area, and within soils with a high infiltration rate, it is considered a critical area and subject to MASMS Standard 6. 2.4 Soils Soils data from the Natural Resources Conservation Service (NRCS) indicate that the soils within the drainage area are composed of Carver coarse sand, at 3-8% slopes. Carver coarse sand is hydrologic soil group A (HSG) and hydrologic soil group B (HSG), as shown in NOI Narrative Figure 5. One test pit (TP) was conducted at the site on January 3, 2024 near the intersection of Standish Way and Windemere Road. The test pit aimed to evaluate subsurface conditions and estimate seasonal high groundwater (ESHGW) based on evidence of mottling or redox. Since no mottling or redox was observed, the ESHGW was based on the Mean High Water (MHW) of the nearby stream. The MHW elevation was determined to be 2.31’ using LiDAR elevation data from MassGIS in combination with hydrographic survey data from a nearby NOAA tidal station located in Chatham, MA (Station ID - 8447435). Similar results were found based on adjusting the observed groundwater elevation with the Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 9 Frimpter Method (USGS, 2022; Cape Cod Commission, 2006; Cape Cod Commission, 2024)2. The test pit was witnessed and logged by a HW Massachusetts Title 5 Approved Soil Evaluator, with the results shown in Table 2 below. See Appendix C for soil test pit logs. The parent material of the native soil unit, Carver Coarse Sand is sandy glaciofluvial, comprising mostly outwash terraces, plains, and delta landforms. Based on the depth of the proposed infiltration trench, a design infiltration rate (Rawls) of 8.27 in/hr is used for coarse sand. See Appendix C for soil test pit logs. Table 2. Test Pit (TP) Results Test Pit ID Surface Elevation at TP (ft) Pit Bottom Elevation (ft) Observed GW Elevation (ft) ESHGW Elevation (ft) Soil Texture(s) at SCM Design Infiltration Rate (in/hr) TP-1 4.5 1.2 1.2 2.3 Coarse sand 8.27 3.0 Proposed Conditions The proposed project consists of the following stormwater and related site development improvements: GSI including an infiltration trench and a bioretention; and · Porous pavement sidewalk to reduce overall impervious cover and meet ADA requirements. The proposed GSI system is designed to meet the following major objectives: · Capture, treat, and infiltrate to the maximum extent practicable the first one inch of runoff (Water Quality Volume (WQV)); and · Engage the community with interpretive signage. 3.1 SCM Selection Process Multiple types of SCMs and locations were analyzed and considered during the design process of this site that resulted in the proposed design of one bioretention area and one infiltration trench proposed on the east side of Standish Way. A common stormwater management option for bacteria load reductions is underground infiltration, such as leaching chambers. However, given the existing high groundwater levels and anticipated future levels, these structural practices are not ideal and not even feasible in the lower portion of the site. Instead, the focus for alternatives considered were vegetated GSI practices that maximized pollutant removal for bacteria as well as nutrients and were most resilient to anticipated climate impacts and SLR over 50 years. Alternative options considered are described below. 2 Index Well Mashpee 29 (MIW-29) Zone A adjustment factor in January 2024 of 1.3 feet was used to adjust the observed groundwater to develop the ESHGW of 2.5 feet. Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 10 Option 1: Option 1 included proposing a bioretention area along the east grass shoulder of Standish Way that extended from Sagamore Road to Windemere Road. This design included several inlets along Standish Way diverting runoff to the practice and an overflow at the lower end of the practice that directed runoff back onto Standish Way. Several constraints were identified once survey was complete that did not make this design feasible including the steepness of the grass shoulder up to the 114 Standish Way property line and the limited width of the grass shoulder. During the initial site visit, the fence line along the 124 Standish Way property was assumed to be the approximate property line/ROW line. Survey, however, determined the property line was roughly 4-5’ closer to Standish Way than the fence line, leaving limited space for a sidewalk, bioretention area, and grading. Option 2: Infiltration trenches were considered at several locations along the length of the Standish Way drainage area. During the initial site visit, an opportunity for an infiltration trench in front of 102 Standish Way was identified; however, survey identified a water service line in the location of the proposed infiltration trench. Infiltration/tree trenches were also considered in front of 127 Stanish and in front of 124 Standish Way due to the limited width of the grass shoulder. However, the soil analysis conducted along the grass shoulder identified groundwater at Elevation 2.5, which did not provide a 2’ vertical separation between the bottom of the trench and groundwater at either location. Option 3, the Selected option: The chosen design includes components of both Option 1 and 2. A bioretention area is proposed in the flatter area along 114 and 124 Standish Way with a shorter length than Option 1 resulting in less grading to the existing surface. The sidewalk is proposed to curve around the bioretention area eliminating the need for runoff to cross the sidewalk to reach the bioretention area. An infiltration trench is proposed at the upper end of the 114 Standish Way property line where the elevations are higher, and the infiltration trench design can meet the groundwater separation requirements. Once both SCMs reach capacity, runoff will bypass the inlets and continue down the existing flow path of Standish Way. This provides a safe, non-erosive bypass for runoff as well as avoiding installation of a new outlet location. The bottom of the bioretention area is approximately one foot below the sidewalk elevation and is designed to pond 6 inches before runoff bypasses the system. This minor depth change and ponding depth poses minimal risk to the safety of humans and animals and therefore, does not include any type of barrier. As sea level and thus groundwater levels rise over the next 50 years, these resilient GSI practices will be able to adapt to the wetter conditions. The bioretention area will start to convert to a wet swale as groundwater rises. Likely, the plant community will naturally change as conditions change, but wholesale replacements of the bioretention components was assumed in the O&M Plan over this design span, and more wet-loving plants would also be installed at those times. The infiltration trench will also evolve as groundwater rises and will utilize the upper reaches of the stone reservoir. The planted shrubs will continue to help absorb runoff and pollutants, and the trench would still be able to treat stormwater, but likely the treatment volume will decrease over time under these conditions. An infiltration trench as proposed will still be more resilient to changing conditions than static concrete or plastic infiltration structures installed at a set elevation. Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 11 3.2 Drainage Areas The contributing drainage area from Standish Way to the existing SCMs (SP1A) under proposed conditions is the same as existing, with a total of approximately 1.46 acres. However, the proposed project is reducing impervious cover by roughly 1,100 square feet by replacing the paved sidewalk with a porous one. The existing drainage area (DA1) was subdivided for the proposed conditions in order to model flows to the proposed SCMs, including: DA1A (northeast Standish), DA1B (southeast Standish), and DA1C (southwest Standish). The proposed SCMs were added as “ponds” in the HydroCAD model. The proposed porous asphalt was modeled with a reduced curve number (CN = 40) per the Rhode Island Stormwater Design and Installation Standards Manual (2015). DA1A and DA1B flow to the proposed GSI systems while DA1C continues to SP1A untreated. The area of untreated impervious area contributing runoff from Standish Way to the existing SCMs is reduced from approximately 0.63 acres to 0.25 acres. See the proposed drainage area map (Project MC-3) and a detailed breakdown of land cover in Appendix A, as well as the proposed HydroCAD model report in Appendix B. 3.3 Structural Stormwater Control Measures (SCMs) The proposed stormwater management includes a GSI approach to capture, detain, treat, and infiltrate runoff. The stormwater management systems were designed to meet Standard 1, so that no new untreated stormwater runoff will be directed to any off-site areas or resource areas. There are three stormwater GSI practices proposed– a bioretention area, an infiltration trench, and porous pavement. Pretreatment will be provided with sediment forebays and water quality units. Flow from large storm events will bypass the GSI practices and continue to flow down Standish Way. These SCMs are described in more detail below. Pretreatment A porous sediment forebay is provided for pretreatment of the runoff from the paved surfaces to allow for sediment and other debris to settle out prior to conveyance into the bioretention area. A proprietary water quality unit (WQU) will provide pretreatment of the runoff prior to conveyance into the infiltration trench. Bioretention Areas A bioretention area (BIO) is a shallow depression used to treat stormwater runoff using a specific planting soil and plants to filter runoff. The method combines physical filtering and adsorption with bio- geochemical processes to remove pollutants. The system consists of an inflow component, a pretreatment element, and a shallow ponding area planted with appropriate native plant species (tolerant to both wet and dry periods as well as other site conditions such as wind, salt, shade, etc.). Some BIOs located in areas with poor drainage or high groundwater are lined and/or have underdrains, while others located greater than 2 feet above ESHGW and in sandy soils can just infiltrate the treated runoff. Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 12 One BIO is proposed along the shoulder of Standish Way within the ROW. Runoff from the road enters the BIO through a paved flume. The runoff then flows through the sediment forebay and overflows into the BIO area. This BIO is not designed with an overflow structure; once the BIO reaches capacity, runoff will continue down Standish Way. This BIO captures, treats, and infiltrates the first inch of runoff from the contributing drainage area. The BIO has greater than 2-feet separation from bottom of bed to ESHGW as required and will be planted with low-maintenance, native plants tolerant of the periods of inundation and dry conditions. Infiltration Trench An infiltration trench is an underground practice that detains, treats, and infiltrates runoff. There is one infiltration trench proposed in the right of way, upgradient of the BIO. The system consists of pretreatment via a WQU with a grate, a perforated inflow pipe, the stone storage reservoir, planting soil, and shrubs. Once the trench reaches capacity, runoff will bypass the catch basin grate and continue down Standish Way. The infiltration trench has greater than 2-feet separation from the bottom of stone to the ESHGW as required. Porous Pavement Porous pavement is designed to capture and infiltrate runoff while providing the stability of traditional pavement. The system consists of a porous asphalt layer over a crushed stone reservoir. For small storms, the runoff falling directly on the porous pavement will completely infiltrate the pavement. For larger, intense storms, rainfall rate can exceed the infiltration rate of the porous pavement surface. Once this occurs, runoff will flow across the surface to the low point/drainage structure. Porous pavement should be placed to minimize “run-on” from adjacent traditional impervious pavement, as this can lead to premature clogging. Porous pavement is proposed for the sidewalk within the project site. During those larger, intense storm events, runoff from the porous pavement sidewalk will flow into the bioretention area and/or roadway. 3.4 Non-structural SCMs The non-structural SCMs proposed at the site include pavement reduction and public education. Removing the existing paved sidewalk and replacing with porous pavement reduces total volume of stormwater from the site. The proposed signage at the site will help educate the public on watershed issues, green stormwater infrastructure, and what they can do at their own homes to reduce stormwater pollutants from their lawns and driveways. 4.0 Stormwater Design Components The proposed SCMs were designed to meet a variety of goals and regulatory requirements as discussed above. As a retrofit project for managing existing impervious cover, this design must specifically comply with the redevelopment standard (MASMS Standard 7) by meeting all standards to the maximum extent practicable. The project fully meets this standard, as described in detail below. Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 13 4.1 Water Quality The main purpose of this retrofit project is to improve water quality. This section describes the treatment volumes and pollutant load reductions achieved by the proposed design and how they compare to the MASMS standards. Treatment Volume Per Standard 4 of MASMS, the stormwater management system for a new development site within soils with a rapid infiltration rate (greater than 2.4 inches per hour) must be sized to treat the first one inch of runoff and remove 80% or more of the annual post-construction load of total suspended solids (TSS). As a retrofit (falls under Standard 7 - Redevelopment), the project is only required to meet this to the maximum extent practicable. However, the proposed SCMs were sized to treat the full one-inch water quality volume (WQv) for their contributing drainage areas (DA1A and DA1B). As a result less runoff is flowing to the existing underground gravel wetland and is therefore able to treat the full one-inch of its contributing drainage area (DA1C and DA2). The proposed HydroCAD model results showing treatment of the water quality volume are included in Appendix B and summarized below in Table 3. Table 3. Compliance with Water Quality Volume (WQV) Requirements DA ID SCM ID IA* (ac) WQv Goal (ac- ft) WQv Provided (ac-ft)** % WQv Provided Meets Requirement? Notes DA1A IT1 0.28 0.024 0.024 100% Y Infiltration trench treats 1- inch runoff DA1B BIO1 0.10 0.008 0.008 100% Y Bioretention treats 1-inch runoff DA1C Existing SCMs 0.25 0.021 0.021*** 0% Y Portion of porous sidewalk; remaining runoff from DA continues to downgradient existing GSI for treatment TOTAL SITE: 0.63 0.053 0.053 100% Y Combination of proposed and existing SCM *Impervious Area **From HydroCAD results – see Appendix B for volume “discarded” for WQv Event ***Assumed treatment by downstream existing SCM designed by others. Pollutant Load Reductions The proposed bioretention area and infiltration trench exceed the MASMS requirements for TSS removal and maximize removals of the other pollutants of concern. Estimated TSS, bacteria, phosphorus (TP), and nitrogen (TN) removals for the proposed project are provided in Table 4. The proposed O&M Guide in Appendix D was developed to ensure that the stormwater system continues to function as it was designed into the future to maintain these levels of pollutant removal. While DA1C runoff is not managed within the proposed SCMs, it is fully treated by the existing SCMs (porous pavement/underground gravel wetland) downgradient. Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 14 Table 4. Compliance with Pollutant Removal Requirements DA ID SCM ID IA (ac) WQv Provided (ac-ft)* Runoff Depth Treated (in) TSS Removal (%)** Bacteria Removal (%)*** TP Removal (%)**** TN Removal (%)**** Meets Reqt? DA1A IT1 0.28 0.024 1.0 80% 98% 98% 100% Y DA1B BIO1 0.10 0.008 1.0 90% 100% 98% 100% Y DA1C EX SCMs 0.25 0.021***** 1.0 80% 77% 61% 68% Presumed; not part of proposed project TOTAL SITE: 0.63 0.053 1.0 82% 90% 83% 87% Y *From HydroCAD results – see Appendix B for volume “discarded” for WQv Event **From MASMS ***From Paradigm Environmental (2019) ****From MS4 NPDES Permit Appendix F Attachment 3 (USEPA 2021) *****Assumed treatment by downstream existing SCM designed by others. In addition, since the site is located in a critical area (near a public beach, shellfishing area, and the site has soils with a rapid infiltration rate) and must meet MASMS Standard 6, pretreatment practices before infiltration should remove 44% TSS or more. For the infiltration trench (IT1) shown above in Error! Reference source not found., CDS water quality units are proposed for pretreatment prior to infiltration into the underlying soil, providing 80% TSS removal (Appendix C of the O&M Guide) and fully meeting Standard 6. In addition, BIO1 provides 90% treatment prior to infiltrating into the underlying soils, also fully meeting Standard 6. In addition to the MASMS standards NRCS Code 570 requires pretreatment to remove oil, grease, and sediments. As the project site is on a residential road low amounts of oil and grease are expected in the drainage area. The water quality unit and sediment forebay are expected to capture the levels of oil and grease expected in the runoff. Long-term Pollution Prevention Plan Source control is important to ensure long-term functionality of the proposed SCMs and protect downstream resources and habitat. A long-term pollution prevention plan specific to this site is provided as a part of the O&M Guide in Appendix D. 4.2 Recharge Infiltrating treated runoff into the underlying native sands is a goal of this project. For new development projects, the MASMS requires a specific annual “recharge” volume (Rev) based on the HSG of the soil covered by new impervious surfaces, with a higher volume required for sandy soils (HSG A) and lower for silty, clayey soils (HSG D). This project is only required by the MASMS to provide infiltration or recharge to the maximum extent practicable as a redevelopment project, as there is already pavement at the site. However, the proposed SCMs do meet the required recharge volume by Standard 3, as well as, the NRCS Code 570 recharge requirement. IT1 and BIO1 provide the required recharge amount for the full Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 15 drainage area (DA1A, DA1B, and DA1C), however there is no actual recharge provided for DA1C in the proposed SCMs. Additionally, approximately 1,220 sf of porous pavement has been proposed to provide infiltration and reduce runoff. Another requirement of Standard 3 is that infiltrating SCMs must fully drain in 72 hours. The proposed HydroCAD model results showing nearly full recharge of the first inch of runoff by the bioretention and infiltration trench, and the drawdown times (from full basins to empty) are included in Appendix B and summarized below in Table 5. Table 5. Compliance with Recharge Requirements DA ID SCM ID IA (ac) Soil HSG Required Recharge Depth (in) Rev Goal (ac-ft) Rev Provided (ac-ft)* % Rev Provided Draw-down Time (hrs)** Meets Reqt? Notes DA1A IT1 0.28 A 0.6 0.014 0.024 167% 16 Y DA1B BIO1 0.10 A 0.6 0.005 0.008 167% 16 Y DA1C N/A 0.25 A 0.6 0.012 0.000 0% NA Y DA continues to existing GSI TOTAL SITE: 0.61 0.030 0.030 100% Y *From HydroCAD results – see Appendix B for volume “discarded” for WQv Event **From HydroCAD results – see Appendix B for hydrograph showing time from peak elevation to fully drained basins (WQv Event or 25-yr storm for Chambers) 4.3 Water Quantity The main focus of this project is to improve water quality and habitat, but reducing water quantity impacts during large storm events was also considered. The proposed bioretention area, infiltration trench, and porous pavement will reduce peak flows and runoff volumes for the 2-, 10-, 25- and 100- year storms3. The existing and proposed HydroCAD model results for these larger storm events are included in Appendix B, and the resulting peak flows and runoff volumes are summarized below in Table 6 for both existing (EX) and proposed (PR) conditions. These results show that the proposed improvements will reduce peak flows and runoff volumes for all evaluated storms, and thus, fully meet the requirements of Standard 2 of the MASMS. Table 6. Summary of Existing and Proposed Condition Peak Flow Rates and Runoff Volumes Study Point Peak Flow, cfs Runoff Volume, acre-ft 2-yr 10-yr 25-yr 100-yr 2-yr 10-yr 25-yr 100-yr SP1 EX 1.22 3.11 4.78 7.70 0.10 0.23 0.34 0.55 PR 0.53 2.87 4.55 7.30 0.05 0.17 0.27 0.44 Reduction % 57% 8% 5% 5% 51% 25% 23% 19% *From HydroCAD results – see Appendix B 3 It is important to note that while we include the results for large storm here, given the site’s location within the 100-year flood zone and an anticipated storm surge area, the area will likely be under coastal water during large storms, rendering these estimates irrelevant. Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 16 4.4 Erosion Control Controlling erosion and sedimentation from the construction site is important to meet the overall water quality goals of this retrofit project, as well as to meet MASMS Standard 8. Given this site’s size (< 1 acre of disturbance), a NPDES Construction General Permit Stormwater Pollution Plan (SWPPP) is not required. However, planning for effective erosion and sediment controls (ESCs) was important to this project’s design, and so an ESC Plan is included in the design plans (Appendix F), along with a detailed sequence of construction activities and ESC notes. Silt socks are proposed along the downgradient edges of the area of disturbance. Additionally, inlet protection (silt sacks) is proposed in downgradient catch basins. Regular street sweeping is to be provided along Standish Way to minimize tracking of sediment. Since there is no construction entrance/exit proposed at this site, extra care should be taken in monitoring sediment tracking and sweeping the road. Areas for other sediment traps/basins should be provided on an as-needed basis. Disturbed areas will be stabilized as soon as possible to minimize erosion and sedimentation with pavement, seeding and/or erosion control blankets, if necessary. A Pollutant Controls During Construction guide is also included in Appendix E that discusses these controls in more detail. With these layered ESCs implemented throughout the site, discharge of sediment-laden runoff during construction should be minimized to the maximum extent practicable. The contractor will be required to establish these erosion controls prior to beginning any other project- related work. The ESC Plan will also establish the limit of work, beyond which the contractor will not be allowed to perform any work. It is the contractor’s responsibility to monitor and correct erosion control practices throughout the duration of the project. Erosion control measures will not be removed until the project reaches completion as directed by the project engineer or landscape architect. 4.5 Operation and Maintenance Ongoing maintenance is vital for long-term success at the site. All SCMs were designed to be low- maintenance in nature. These SCMs will be operated and maintained appropriately during construction and post-construction as required on the construction drawings and O&M Guide per MASMS Standard 9 (Appendix D and F). 4.6 Illicit Discharges There will be no illicit discharges to the existing system by the proposed project per MASMS Standard 10. The Long-Term Pollution Prevention Plan in the O&M Guide (Appendix D) includes measures to prevent future illicit discharges. Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 17 5.0 REFERENCES Association to Preserve Cape Cod. 2022. State of the Waters: Cape Cod Report. Cape Cod Commission. 2015. 208 Plan – Cape Cod’s Area Wide Water Quality Management Plan Updated. Massachusetts Department of Environmental Protection (MADEP). 2008. Massachusetts Stormwater Standards Manual. MADEP. 2019. See their homepage at www.state.ma.gov/dep. MassGIS (Massachusetts Office of Geographic and Environmental Information). 2023. See their homepage at: http://www.mass.gov/mgis/. National Oceanic and Atmospheric Administration (NOAA) - National Weather Service (NWS). 2017. Point Precipitation Frequency Estimates: MA. NOAA Atlas 14, Volume 10, Version 3. https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html?bkmrk=ma National Oceanic and Atmospheric Administration (NOAA). 2022. Sea Level Rise Technical Report. Viewer at: https://coast.noaa.gov/slr/# National Oceanic and Atmospheric Administration (NOAA) – Tides & Currents. 2024. Water Levels. https://tidesandcurrents.noaa.gov/waterlevels.html?id=8447435 Natural Resources Conservation Service (NRCS). 2023. Conservation Practice Standard Stormwater Runoff Control Code 570. Natural Resources Conservation Service (NRCS). 2021. Conservation Practice Standard Tree-Shrub Site Preparation Code 490. Natural Resources Conservation Service (NRCS). 2023. Conservation Practice Standard Tree-Shrub Establishment Code 612. Paradigm Environmental. 2019. USEPA Memo. Tisbury MA Impervious Cover Disconnection (ICD) Project: An Integrated Stormwater Management Approach for Promoting Urban Community Sustainability and Resilience - Task 4D. Develop Planning Level GI SCM Performance Curves for Estimating Cumulative Reductions in SW-Related Indicator Bacteria. USEPA (United States Environmental Protection Agency). 2019. National Pollutant Discharge Elimination System (NPDES). See their homepage at: http://cfpub.epa.gov/NPDES/. USEPA. 2021. National Pollutant Discharge Elimination System (NPDES)-General Permits for Stormwater Discharges from Small Municipal Separate Storm Sewer Systems in Massachusetts (as modified). Stormwater Management Report Horsley Witten Group, Inc. Standish Way- Yarmouth Stormwater Design and Implementation Project- Yarmouth, MA September 2024 18 U.S. Geological Survey (USGS). 2022. Determining High Groundwater Levels in Massachusetts. https://www.usgs.gov/centers/new-england-water-science-center/science/updating-a-method- estimate-probable-high#web-tools. APPENDIX A – Drainage Areas • Existing and Proposed Drainage Areas Maps • Land Coverage Summaries STANDISH SW RETROFIT Calc'd by: YARMOUTH, MA Checked by: Date: DA1 DA2 WQv 1.21 DA3 1-yr 3.05 2-yr 3.61 5-yr 4.52 10-yr 5.29 25-yr 6.57 100-yr 8.64 500-yr 0.00 DA1 Cover type Area, ft2 Area, ac Note Paved 22,564 0.518 Permeable 0.000 Roof 5,025 0.115 Water 0 0.000 Woods 0.000 Grass 35,923 0.825 Area, ft2 Area, ac Percent TOTAL 63,512 1.458 27,589 0.633 43 DA2 Cover type Area, ft2 Area, ac Note Paved 4,205 0.097 Permeable 4,415 0.101 Roof 0 0.000 Water 0 0.000 Woods 0 0.000 Grass 874 0.020 Area, ft2 Area, ac Percent TOTAL 9,494 0.218 4,205 0.097 44 Existing Drainage Conditions DRAINAGE AREAS NOAA 14+ 24-hr Type III (inches) JLV MW 7/25/2024 STANDISH STANDISH WINDEMERE PARKING LOT Impervious Impervious PARKING LOT DA3 Cover type Area, ft2 Area, ac Note Paved 21,469 0.493 Permeable 0 0.000 Roof 3,621 0.083 Water 0 0.000 Woods 0 0.000 Grass 21,132 0.485 Area, ft2 Area, ac Percent TOTAL 46,222 1.061 25,090 0.576 54 ALL Cover type Area, ft2 Area, ac Note Paved 48,238 1.107 Permeable 4,415 0.101 Roof 8,646 0.115 Water 0 0.000 Woods 0 0.000 Grass 57,929 0.845 Area, ft2 Area, ac Percent TOTAL 119,228 2.737 56,884 1.306 48 ALL EX AREAS COMBINED Impervious WINDEMERE Impervious STANDISH SW RETROFIT Calc'd by: YARMOUTH, MA Checked by: Date: DA1A DA1B WQv 1.21 DA1C 1-yr 3.05 2-yr 3.61 5-yr 4.52 10-yr 5.29 25-yr 6.57 100-yr 8.64 500-yr 0.00 DA1A Cover type Area, ft2 Area, ac Note Paved 9,276 0.213 Permeable 23 0.001 Roof 2,179 0.050 Water 0.000 Woods 0.000 Grass 14,034 0.322 Area, ft2 Area, ac Percent TOTAL 25,512 0.586 11,455 0.263 45 DA1B Cover type Area, ft2 Area, ac Note Paved 2,811 0.065 Permeable 969 0.022 Roof 1,355 0.031 Water 276 0.006 Woods 0.000 Grass 10,401 0.239 Area, ft2 Area, ac Percent TOTAL 15,812 0.363 4,166 0.096 26 JLV MW Proposed Drainage Conditions (FOR DA1 ONLY)7/25/2024 DRAINAGE AREAS NOAA 14+ NORTHEAST STANDISH 24-hr Type III (inches) SOUTHEAST STANDISH SOUTHWEST STANDISH NORTHEAST STANDISH Impervious SOUTHEAST STANDISH Impervious DA1C Cover type Area, ft2 Area, ac Note Paved 9,357 0.215 Permeable 198 0.005 Roof 1,490 0.034 Water 0 0.000 Woods 0 0.000 Grass 11,143 0.256 Area, ft2 Area, ac Percent TOTAL 22,188 0.509 10,847 0.249 49 ALL Cover type Area, ft2 Area, ac Note Paved 21,444 0.492 Permeable 1,190 0.027 Roof 5,024 0.115 Water 276 0.006 Woods 0 0.000 Grass 35,578 0.817 Area, ft2 Area, ac Percent TOTAL 63,512 1.458 26,468 0.608 42 SOUTHWEST STANDISH ALL PR AREAS COMBINED Impervious Impervious CNES (2024) Distribution Airbus DS 412141416 8614 1418 184681010121086141616 6 4812WINDEMERE ROAD S A G A M O R E R O A D PI L G R I M R O A DSTANDISH WAYBR E W S T E R R O A D BR E W S T E R R O A D EXISTING UNDERGROUNDGRAVEL WETLANDEXISTING INFILTRATIONTRENCHEXISTING LEACHINGCATCH BASINPrepared For:Sheet Number:Project Number:last modified: 09/12/24 printed: 09/12/24 by jv H:\Projects\2022\22108 APCC Yarmouth\Drawings\STANDISH\22108A STANDISH DR (OVERALL).dwg Plan Set: Plan Title:of122108A3Town of Yarmouth DPW Phone: 74 Town Brook Road West Yarmouth, MA 02673 (508) 398-2231 ext. 1250 SEPTEMBER 2024 JLV JLV MW 0SCALE IN FEET80Horsley Witten Group, Inc. Sustainable Environmental Solutions 90 Route 6A Sandwich, MA 02563 horsleywittengroup.comDA1SP1P1STUDY POINTSITE MC-3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT - 75% DESIGN YARMOUTH, MASSACHUSETTS OVERALL DRAINAGE AREA MAP (TO MILL CREEK) (PROJECT T-194)DRAINAGE AREA1.005.00SOIL BOUNDARYTIME OF CONCENTRATION FLOW PATHCARVER COARSE SAND (HSG A)0 TO 3 PERCENT SLOPESCARVER COARSE SAND (HSG B)3 TO 8 PERCENT SLOPESLEGENDSOIL TYPESPOND252A252BChecked By:Drawn By:Design By:Date:252A252BDA3SP10.581.06DRAINAGEAREABOUNDARYWOODSROOFTOPGRASSPAVEMENTIMP. AREATOTAL AREA(ACRES)WATERPOROUSPAVEMENTUGWITDRAINAGE INFRASTRUCTUREDA20.100.22DA10.651.49SP1AMINOR CONTOURMAJOR CONTOUR 412141416 8614 1418 184681010121086141616 6 8121 21010 12 6 6 121 6 1214EXISTING UNDERGROUNDGRAVEL WETLANDEXISTING INFILTRATIONTRENCHEXISTING LEACHINGCATCH BASINWINDEMERE ROAD SA G A M O R E R O A D PILGRI M R O A DSTANDISH WAYB R E W S T E R R O A D BR E W S T E R R O A D Prepared For:Sheet Number:Project Number:last modified: 09/12/24 printed: 09/12/24 by jv H:\Projects\2022\22108 APCC Yarmouth\Drawings\STANDISH\22108A STANDISH DR.dwg Plan Set: Plan Title:of222108A3Town of Yarmouth DPW Phone: 74 Town Brook Road West Yarmouth, MA 02673 (508) 398-2231 ext. 1250 SEPTEMBER 2024 JLV JLV MW 0SCALE IN FEET60Horsley Witten Group, Inc. Sustainable Environmental Solutions 90 Route 6A Sandwich, MA 02563 horsleywittengroup.comDA1SP1P1STUDY POINTSITE MC-3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT - 75% DESIGN YARMOUTH, MASSACHUSETTS EXISTING DRAINAGE AREA MAP (PROJECT MC-3)DRAINAGE AREA1.005.00SOIL BOUNDARYTIME OF CONCENTRATION FLOW PATHMINOR CONTOURCARVER COARSE SAND (HSG A)0 TO 3 PERCENT SLOPESCARVER COARSE SAND (HSG B)3 TO 8 PERCENT SLOPESLEGENDSOIL TYPESPOND252A252BChecked By:Drawn By:Design By:Date:252A252BDA1SP1ADRAINAGEAREABOUNDARYWOODSROOFTOPGRASSPAVEMENTIMP. AREATOTAL AREA(ACRES)WATERDRAINAGE INFRASTRUCTURE0.651.49MAJOR CONTOUR 412141416 8614 1418 184681010121086141616 68121 21010 12 6 6 121 6 1214EXISTING UNDERGROUNDGRAVEL WETLANDEXISTING INFILTRATIONTRENCHEXISTING LEACHINGCATCH BASINWINDEMERE ROAD SA G A M O R E R O A D PILGRI M R O A DSTANDISH WAYB R E W S T E R R O A D BR E W S T E R R O A D last modified: 09/12/24 printed: 09/12/24 by jv H:\Projects\2022\22108 APCC Yarmouth\Drawings\STANDISH\22108A STANDISH DR.dwg SEPTEMBER 2024 JLV JLV MW 0SCALE IN FEET60DA1SP1P1252A252BDA1ADA1BDA1C252A252BSP1APrepared For:Sheet Number:Project Number:Plan Set: Plan Title:of322108A3Town of Yarmouth DPW Phone: 74 Town Brook Road West Yarmouth, MA 02673 (508) 398-2231 ext. 1250 Horsley Witten Group, Inc. Sustainable Environmental Solutions 90 Route 6A Sandwich, MA 02563 horsleywittengroup.comSTUDY POINTSITE MC-3: STANDISH WAY STORMWATER RETROFIT DESIGN AND IMPLEMENTATION PROJECT - 75% DESIGN YARMOUTH, MASSACHUSETTS PROPOSED DRAINAGE AREA MAP (PROJECT MC-3)DRAINAGE AREA1.005.00SOIL BOUNDARYTIME OF CONCENTRATION FLOW PATHCARVER COARSE SAND (HSG A)0 TO 3 PERCENT SLOPESCARVER COARSE SAND (HSG B)3 TO 8 PERCENT SLOPESLEGENDSOIL TYPESPONDChecked By:Drawn By:Design By:Date:0.280.610.100.360.250.51IT1BIO1DRAINAGEAREABOUNDARYWOODSROOFTOPGRASSPAVEMENTIMP. AREATOTAL AREA(ACRES)WATERDRAINAGE INFRASTRUCTUREMINOR CONTOURMAJOR CONTOUR APPENDIX B – Hydrologic/Hydraulic Model Results HydroCAD® Results • Existing • Proposed DA1 Standish SP1A Study Point 1A Routing Diagram for 22108 STANDISH EX Prepared by Horsley Witten Inc, Printed 9/12/2024 HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Subcat Reach Pond Link 22108 STANDISH EX Printed 9/12/2024Prepared by Horsley Witten Inc Page 2HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Rainfall Events Listing Event# Event Name Storm Type Curve Mode Duration (hours) B/B Depth (inches) AMC 1 2yr Type III 24-hr Default 24.00 1 3.61 2 2 10yr Type III 24-hr Default 24.00 1 5.29 2 3 25yr Type III 24-hr Default 24.00 1 6.57 2 4 100yr Type III 24-hr Default 24.00 1 8.64 2 22108 STANDISH EX Printed 9/12/2024Prepared by Horsley Witten Inc Page 3HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 1.486 HSG A DA1 0.000 HSG B 0.000 HSG C 0.000 HSG D 0.000 Other 1.486 TOTAL AREA Type III 24-hr 2yr Rainfall=3.61"22108 STANDISH EX Printed 9/12/2024Prepared by Horsley Witten Inc Page 4HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Subcatchment DA1: Standish Runoff = 1.22 cfs @ 12.10 hrs, Volume= 0.100 af, Depth= 0.81" Routed to Pond SP1A : Study Point 1A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 2yr Rainfall=3.61" Area (sf) CN Description 22,564 98 Paved parking, HSG A 5,887 98 Roofs, HSG A 36,287 39 >75% Grass cover, Good, HSG A 64,738 65 Weighted Average 36,287 56.05% Pervious Area 28,451 43.95% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Pond SP1A: Study Point 1A Inflow Area = 1.486 ac, 43.95% Impervious, Inflow Depth = 0.81" for 2yr event Inflow = 1.22 cfs @ 12.10 hrs, Volume= 0.100 af Primary = 1.22 cfs @ 12.10 hrs, Volume= 0.100 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 10yr Rainfall=5.29"22108 STANDISH EX Printed 9/12/2024Prepared by Horsley Witten Inc Page 5HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Subcatchment DA1: Standish Runoff = 3.11 cfs @ 12.09 hrs, Volume= 0.229 af, Depth= 1.85" Routed to Pond SP1A : Study Point 1A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 10yr Rainfall=5.29" Area (sf) CN Description 22,564 98 Paved parking, HSG A 5,887 98 Roofs, HSG A 36,287 39 >75% Grass cover, Good, HSG A 64,738 65 Weighted Average 36,287 56.05% Pervious Area 28,451 43.95% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Pond SP1A: Study Point 1A Inflow Area = 1.486 ac, 43.95% Impervious, Inflow Depth = 1.85" for 10yr event Inflow = 3.11 cfs @ 12.09 hrs, Volume= 0.229 af Primary = 3.11 cfs @ 12.09 hrs, Volume= 0.229 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 25yr Rainfall=6.57"22108 STANDISH EX Printed 9/12/2024Prepared by Horsley Witten Inc Page 6HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Subcatchment DA1: Standish Runoff = 4.78 cfs @ 12.08 hrs, Volume= 0.344 af, Depth= 2.77" Routed to Pond SP1A : Study Point 1A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 25yr Rainfall=6.57" Area (sf) CN Description 22,564 98 Paved parking, HSG A 5,887 98 Roofs, HSG A 36,287 39 >75% Grass cover, Good, HSG A 64,738 65 Weighted Average 36,287 56.05% Pervious Area 28,451 43.95% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Pond SP1A: Study Point 1A Inflow Area = 1.486 ac, 43.95% Impervious, Inflow Depth = 2.77" for 25yr event Inflow = 4.78 cfs @ 12.08 hrs, Volume= 0.344 af Primary = 4.78 cfs @ 12.08 hrs, Volume= 0.344 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 100yr Rainfall=8.64"22108 STANDISH EX Printed 9/12/2024Prepared by Horsley Witten Inc Page 7HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Subcatchment DA1: Standish Runoff = 7.70 cfs @ 12.08 hrs, Volume= 0.547 af, Depth= 4.42" Routed to Pond SP1A : Study Point 1A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 100yr Rainfall=8.64" Area (sf) CN Description 22,564 98 Paved parking, HSG A 5,887 98 Roofs, HSG A 36,287 39 >75% Grass cover, Good, HSG A 64,738 65 Weighted Average 36,287 56.05% Pervious Area 28,451 43.95% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Pond SP1A: Study Point 1A Inflow Area = 1.486 ac, 43.95% Impervious, Inflow Depth = 4.42" for 100yr event Inflow = 7.70 cfs @ 12.08 hrs, Volume= 0.547 af Primary = 7.70 cfs @ 12.08 hrs, Volume= 0.547 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs DA1A Northeast Standish DA1B Southeast Standish DA1C Southwest Standish BIO1 Bioretention 1 IT1 Infiltration Trench 1 SP1A Study Point 1A Routing Diagram for 22108 STANDISH PR WQv Prepared by Horsley Witten Inc, Printed 9/12/2024 HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Subcat Reach Pond Link 22108 STANDISH PR WQv Printed 9/12/2024Prepared by Horsley Witten Inc Page 2HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Rainfall Events Listing Event# Event Name Storm Type Curve Mode Duration (hours) B/B Depth (inches) AMC 1 WQv Type III 24-hr Default 24.00 1 1.22 2 22108 STANDISH PR WQv Printed 9/12/2024Prepared by Horsley Witten Inc Page 3HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 0.634 HSG A DA1A, DA1B, DA1C 0.000 HSG B 0.000 HSG C 0.000 HSG D 0.000 Other 0.634 TOTAL AREA Type III 24-hr WQv Rainfall=1.22"22108 STANDISH PR WQv Printed 9/12/2024Prepared by Horsley Witten Inc Page 4HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Subcatchment DA1A: Northeast Standish Runoff = 0.32 cfs @ 12.07 hrs, Volume= 0.024 af, Depth= 1.01" Routed to Pond IT1 : Infiltration Trench 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr WQv Rainfall=1.22" Area (sf) CN Description 9,276 98 Paved parking, HSG A 3,041 98 Roofs, HSG A 12,317 98 Weighted Average 12,317 98 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment DA1B: Southeast Standish Runoff = 0.11 cfs @ 12.07 hrs, Volume= 0.009 af, Depth= 1.01" Routed to Pond BIO1 : Bioretention 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr WQv Rainfall=1.22" Area (sf) CN Description 2,811 98 Paved parking, HSG A 1,355 98 Roofs, HSG A 276 98 Water Surface, HSG A 4,442 98 Weighted Average 4,442 98 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment DA1C: Southwest Standish Runoff = 0.28 cfs @ 12.07 hrs, Volume= 0.021 af, Depth= 1.01" Routed to Pond SP1A : Study Point 1A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr WQv Rainfall=1.22" Type III 24-hr WQv Rainfall=1.22"22108 STANDISH PR WQv Printed 9/12/2024Prepared by Horsley Witten Inc Page 5HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Area (sf) CN Description 9,357 98 Paved parking, HSG A 1,490 98 Roofs, HSG A 10,847 98 Weighted Average 10,847 98 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Pond BIO1: Bioretention 1 Inflow Area = 0.102 ac,100.00% Impervious, Inflow Depth = 1.01" for WQv event Inflow = 0.11 cfs @ 12.07 hrs, Volume= 0.009 af Outflow = 0.03 cfs @ 12.44 hrs, Volume= 0.009 af, Atten= 75%, Lag= 22.3 min Discarded = 0.03 cfs @ 12.44 hrs, Volume= 0.009 af Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af Routed to Pond SP1A : Study Point 1A Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 4.52' @ 12.44 hrs Surf.Area= 509 sf Storage= 107 cf Plug-Flow detention time= 45.7 min calculated for 0.009 af (100% of inflow) Center-of-Mass det. time= 45.7 min ( 826.3 - 780.6 ) Volume Invert Avail.Storage Storage Description #1 4.50' 588 cf Custom Stage Data (Prismatic) Listed below (Recalc) #2 3.25' 103 cf Custom Stage Data (Prismatic) Listed below (Recalc) 313 cf Overall x 33.0% Voids 691 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 4.50 250 0 0 5.00 550 200 200 5.50 1,000 388 588 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 3.25 250 0 0 4.50 250 313 313 Device Routing Invert Outlet Devices #1 Primary 5.00'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #2 Discarded 3.25'2.410 in/hr Exfiltration over Surface area Phase-In= 0.01' Type III 24-hr WQv Rainfall=1.22"22108 STANDISH PR WQv Printed 9/12/2024Prepared by Horsley Witten Inc Page 6HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Discarded OutFlow Max=0.03 cfs @ 12.44 hrs HW=4.52' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.03 cfs) Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=3.25' (Free Discharge) 1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond IT1: Infiltration Trench 1 Inflow Area = 0.283 ac,100.00% Impervious, Inflow Depth = 1.01" for WQv event Inflow = 0.32 cfs @ 12.07 hrs, Volume= 0.024 af Outflow = 0.03 cfs @ 12.45 hrs, Volume= 0.024 af, Atten= 89%, Lag= 22.7 min Discarded = 0.03 cfs @ 12.45 hrs, Volume= 0.024 af Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af Routed to Pond SP1A : Study Point 1A Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs / 2 Peak Elev= 6.97' @ 12.75 hrs Surf.Area= 620 sf Storage= 354 cf Plug-Flow detention time= 74.4 min calculated for 0.024 af (100% of inflow) Center-of-Mass det. time= 74.4 min ( 855.0 - 780.6 ) Volume Invert Avail.Storage Storage Description #1 4.31' 335 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,014 cf Overall x 33.0% Voids #2 6.00' 45 cf Custom Stage Data (Prismatic) Listed below (Recalc) 380 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 4.31 600 0 0 6.00 600 1,014 1,014 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 6.00 20 0 0 7.75 20 35 35 8.00 20 5 40 8.01 1,000 5 45 Device Routing Invert Outlet Devices #1 Discarded 4.31'2.410 in/hr Exfiltration over Surface area Phase-In= 0.01' #2 Primary 7.75'20.0' long x 0.5' breadth free overflow down road Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Discarded OutFlow Max=0.03 cfs @ 12.45 hrs HW=6.30' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.03 cfs) Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=4.31' (Free Discharge) 2=free overflow down road ( Controls 0.00 cfs) DA1A Northeast Standish DA1B Southeast Standish DA1C Southwest Standish BIO1 Bioretention 1 IT1 Infiltration Trench 1 SP1A Study Point 1A Routing Diagram for 22108 STANDISH PR Prepared by Horsley Witten Inc, Printed 9/12/2024 HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Subcat Reach Pond Link 22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 2HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Rainfall Events Listing (selected events) Event# Event Name Storm Type Curve Mode Duration (hours) B/B Depth (inches) AMC 1 2yr Type III 24-hr Default 24.00 1 3.61 2 2 10yr Type III 24-hr Default 24.00 1 5.29 2 3 25yr Type III 24-hr Default 24.00 1 6.57 2 4 100yr Type III 24-hr Default 24.00 1 8.64 2 22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 3HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 1.486 HSG A DA1A, DA1B, DA1C 0.000 HSG B 0.000 HSG C 0.000 HSG D 0.000 Other 1.486 TOTAL AREA Type III 24-hr 2yr Rainfall=3.61"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 4HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Subcatchment DA1A: Northeast Standish Runoff = 0.55 cfs @ 12.09 hrs, Volume= 0.044 af, Depth= 0.86" Routed to Pond IT1 : Infiltration Trench 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 2yr Rainfall=3.61" Area (sf) CN Description 9,276 98 Paved parking, HSG A 3,041 98 Roofs, HSG A 14,398 39 >75% Grass cover, Good, HSG A * 23 40 Permeable Pavement, HSG A 26,738 66 Weighted Average 14,421 39 53.93% Pervious Area 12,317 98 46.07% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment DA1B: Southeast Standish Runoff = 0.10 cfs @ 12.12 hrs, Volume= 0.013 af, Depth= 0.42" Routed to Pond BIO1 : Bioretention 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 2yr Rainfall=3.61" Area (sf) CN Description 2,811 98 Paved parking, HSG A 1,355 98 Roofs, HSG A 10,401 39 >75% Grass cover, Good, HSG A 276 98 Water Surface, HSG A * 969 40 Permeable Pavement, HSG A 15,812 56 Weighted Average 11,370 39 71.91% Pervious Area 4,442 98 28.09% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment DA1C: Southwest Standish Runoff = 0.53 cfs @ 12.09 hrs, Volume= 0.041 af, Depth= 0.97" Routed to Pond SP1A : Study Point 1A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 2yr Rainfall=3.61" Type III 24-hr 2yr Rainfall=3.61"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 5HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Area (sf) CN Description 9,357 98 Paved parking, HSG A 1,490 98 Roofs, HSG A * 11,143 39 >75% Grass cover, Good, HSG A * 198 40 Permeable Pavement, HSG A 22,188 68 Weighted Average 11,341 39 51.11% Pervious Area 10,847 98 48.89% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Pond BIO1: Bioretention 1 Inflow Area = 0.363 ac, 28.09% Impervious, Inflow Depth = 0.42" for 2yr event Inflow = 0.10 cfs @ 12.12 hrs, Volume= 0.013 af Outflow = 0.02 cfs @ 13.02 hrs, Volume= 0.013 af, Atten= 75%, Lag= 53.6 min Discarded = 0.02 cfs @ 13.02 hrs, Volume= 0.013 af Primary = 0.00 cfs @ 1.00 hrs, Volume= 0.000 af Routed to Pond SP1A : Study Point 1A Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 4.81' @ 13.02 hrs Surf.Area= 435 sf Storage= 105 cf Plug-Flow detention time= 39.9 min calculated for 0.013 af (100% of inflow) Center-of-Mass det. time= 39.9 min ( 965.6 - 925.8 ) Volume Invert Avail.Storage Storage Description #1 4.50' 588 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 4.50 250 0 0 5.00 550 200 200 5.50 1,000 388 588 Device Routing Invert Outlet Devices #1 Primary 5.00'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #2 Discarded 4.50'2.410 in/hr Exfiltration over Surface area Phase-In= 0.01' Discarded OutFlow Max=0.02 cfs @ 13.02 hrs HW=4.81' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.02 cfs) Primary OutFlow Max=0.00 cfs @ 1.00 hrs HW=4.50' (Free Discharge) 1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type III 24-hr 2yr Rainfall=3.61"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 6HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Pond IT1: Infiltration Trench 1 Inflow Area = 0.614 ac, 46.07% Impervious, Inflow Depth = 0.86" for 2yr event Inflow = 0.55 cfs @ 12.09 hrs, Volume= 0.044 af Outflow = 0.20 cfs @ 12.22 hrs, Volume= 0.040 af, Atten= 63%, Lag= 7.6 min Discarded = 0.03 cfs @ 12.20 hrs, Volume= 0.032 af Primary = 0.16 cfs @ 12.22 hrs, Volume= 0.008 af Routed to Pond SP1A : Study Point 1A Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs / 2 Peak Elev= 7.76' @ 12.20 hrs Surf.Area= 620 sf Storage= 370 cf Plug-Flow detention time= 159.2 min calculated for 0.040 af (90% of inflow) Center-of-Mass det. time= 112.6 min ( 992.4 - 879.7 ) Volume Invert Avail.Storage Storage Description #1 4.31' 335 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,014 cf Overall x 33.0% Voids #2 6.00' 45 cf Custom Stage Data (Prismatic) Listed below (Recalc) 380 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 4.31 600 0 0 6.00 600 1,014 1,014 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 6.00 20 0 0 7.75 20 35 35 8.00 20 5 40 8.01 1,000 5 45 Device Routing Invert Outlet Devices #1 Discarded 4.31'2.410 in/hr Exfiltration over Surface area Phase-In= 0.01' #2 Primary 7.75'20.0' long x 0.5' breadth free overflow down road Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Discarded OutFlow Max=0.03 cfs @ 12.20 hrs HW=7.76' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.03 cfs) Primary OutFlow Max=0.09 cfs @ 12.22 hrs HW=7.76' (Free Discharge) 2=free overflow down road (Weir Controls 0.09 cfs @ 0.33 fps) Type III 24-hr 2yr Rainfall=3.61"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 7HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Pond SP1A: Study Point 1A Inflow Area = 1.486 ac, 42.64% Impervious, Inflow Depth = 0.39" for 2yr event Inflow = 0.53 cfs @ 12.09 hrs, Volume= 0.049 af Primary = 0.53 cfs @ 12.09 hrs, Volume= 0.049 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 10yr Rainfall=5.29"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 8HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Subcatchment DA1A: Northeast Standish Runoff = 1.35 cfs @ 12.08 hrs, Volume= 0.099 af, Depth= 1.93" Routed to Pond IT1 : Infiltration Trench 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 10yr Rainfall=5.29" Area (sf) CN Description 9,276 98 Paved parking, HSG A 3,041 98 Roofs, HSG A 14,398 39 >75% Grass cover, Good, HSG A * 23 40 Permeable Pavement, HSG A 26,738 66 Weighted Average 14,421 39 53.93% Pervious Area 12,317 98 46.07% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment DA1B: Southeast Standish Runoff = 0.44 cfs @ 12.10 hrs, Volume= 0.036 af, Depth= 1.19" Routed to Pond BIO1 : Bioretention 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 10yr Rainfall=5.29" Area (sf) CN Description 2,811 98 Paved parking, HSG A 1,355 98 Roofs, HSG A 10,401 39 >75% Grass cover, Good, HSG A 276 98 Water Surface, HSG A * 969 40 Permeable Pavement, HSG A 15,812 56 Weighted Average 11,370 39 71.91% Pervious Area 4,442 98 28.09% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment DA1C: Southwest Standish Runoff = 1.23 cfs @ 12.08 hrs, Volume= 0.089 af, Depth= 2.09" Routed to Pond SP1A : Study Point 1A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 10yr Rainfall=5.29" Type III 24-hr 10yr Rainfall=5.29"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 9HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Area (sf) CN Description 9,357 98 Paved parking, HSG A 1,490 98 Roofs, HSG A * 11,143 39 >75% Grass cover, Good, HSG A * 198 40 Permeable Pavement, HSG A 22,188 68 Weighted Average 11,341 39 51.11% Pervious Area 10,847 98 48.89% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Pond BIO1: Bioretention 1 Inflow Area = 0.363 ac, 28.09% Impervious, Inflow Depth = 1.19" for 10yr event Inflow = 0.44 cfs @ 12.10 hrs, Volume= 0.036 af Outflow = 0.30 cfs @ 12.22 hrs, Volume= 0.036 af, Atten= 31%, Lag= 7.2 min Discarded = 0.03 cfs @ 12.22 hrs, Volume= 0.025 af Primary = 0.27 cfs @ 12.22 hrs, Volume= 0.011 af Routed to Pond SP1A : Study Point 1A Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 5.08' @ 12.22 hrs Surf.Area= 625 sf Storage= 249 cf Plug-Flow detention time= 56.3 min calculated for 0.036 af (100% of inflow) Center-of-Mass det. time= 56.3 min ( 939.3 - 883.0 ) Volume Invert Avail.Storage Storage Description #1 4.50' 588 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 4.50 250 0 0 5.00 550 200 200 5.50 1,000 388 588 Device Routing Invert Outlet Devices #1 Primary 5.00'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #2 Discarded 4.50'2.410 in/hr Exfiltration over Surface area Phase-In= 0.01' Discarded OutFlow Max=0.03 cfs @ 12.22 hrs HW=5.08' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.03 cfs) Primary OutFlow Max=0.26 cfs @ 12.22 hrs HW=5.08' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 0.26 cfs @ 0.80 fps) Type III 24-hr 10yr Rainfall=5.29"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 10HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Pond IT1: Infiltration Trench 1 Inflow Area = 0.614 ac, 46.07% Impervious, Inflow Depth = 1.93" for 10yr event Inflow = 1.35 cfs @ 12.08 hrs, Volume= 0.099 af Outflow = 1.69 cfs @ 12.08 hrs, Volume= 0.115 af, Atten= 0%, Lag= 0.0 min Discarded = 0.03 cfs @ 12.00 hrs, Volume= 0.042 af Primary = 1.66 cfs @ 12.08 hrs, Volume= 0.072 af Routed to Pond SP1A : Study Point 1A Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs / 2 Peak Elev= 7.84' @ 12.08 hrs Surf.Area= 620 sf Storage= 372 cf Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= 37.5 min ( 891.4 - 853.9 ) Volume Invert Avail.Storage Storage Description #1 4.31' 335 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,014 cf Overall x 33.0% Voids #2 6.00' 45 cf Custom Stage Data (Prismatic) Listed below (Recalc) 380 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 4.31 600 0 0 6.00 600 1,014 1,014 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 6.00 20 0 0 7.75 20 35 35 8.00 20 5 40 8.01 1,000 5 45 Device Routing Invert Outlet Devices #1 Discarded 4.31'2.410 in/hr Exfiltration over Surface area Phase-In= 0.01' #2 Primary 7.75'20.0' long x 0.5' breadth free overflow down road Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Discarded OutFlow Max=0.03 cfs @ 12.00 hrs HW=7.83' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.03 cfs) Primary OutFlow Max=1.59 cfs @ 12.08 hrs HW=7.84' (Free Discharge) 2=free overflow down road (Weir Controls 1.59 cfs @ 0.85 fps) Type III 24-hr 10yr Rainfall=5.29"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 11HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Pond SP1A: Study Point 1A Inflow Area = 1.486 ac, 42.64% Impervious, Inflow Depth = 1.39" for 10yr event Inflow = 2.87 cfs @ 12.08 hrs, Volume= 0.172 af Primary = 2.87 cfs @ 12.08 hrs, Volume= 0.172 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 25yr Rainfall=6.57"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 12HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Subcatchment DA1A: Northeast Standish Runoff = 2.05 cfs @ 12.08 hrs, Volume= 0.147 af, Depth= 2.87" Routed to Pond IT1 : Infiltration Trench 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 25yr Rainfall=6.57" Area (sf) CN Description 9,276 98 Paved parking, HSG A 3,041 98 Roofs, HSG A 14,398 39 >75% Grass cover, Good, HSG A * 23 40 Permeable Pavement, HSG A 26,738 66 Weighted Average 14,421 39 53.93% Pervious Area 12,317 98 46.07% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment DA1B: Southeast Standish Runoff = 0.77 cfs @ 12.09 hrs, Volume= 0.059 af, Depth= 1.94" Routed to Pond BIO1 : Bioretention 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 25yr Rainfall=6.57" Area (sf) CN Description 2,811 98 Paved parking, HSG A 1,355 98 Roofs, HSG A 10,401 39 >75% Grass cover, Good, HSG A 276 98 Water Surface, HSG A * 969 40 Permeable Pavement, HSG A 15,812 56 Weighted Average 11,370 39 71.91% Pervious Area 4,442 98 28.09% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment DA1C: Southwest Standish Runoff = 1.82 cfs @ 12.08 hrs, Volume= 0.130 af, Depth= 3.07" Routed to Pond SP1A : Study Point 1A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 25yr Rainfall=6.57" Type III 24-hr 25yr Rainfall=6.57"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 13HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Area (sf) CN Description 9,357 98 Paved parking, HSG A 1,490 98 Roofs, HSG A * 11,143 39 >75% Grass cover, Good, HSG A * 198 40 Permeable Pavement, HSG A 22,188 68 Weighted Average 11,341 39 51.11% Pervious Area 10,847 98 48.89% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Pond BIO1: Bioretention 1 Inflow Area = 0.363 ac, 28.09% Impervious, Inflow Depth = 1.94" for 25yr event Inflow = 0.77 cfs @ 12.09 hrs, Volume= 0.059 af Outflow = 0.74 cfs @ 12.12 hrs, Volume= 0.059 af, Atten= 5%, Lag= 2.1 min Discarded = 0.04 cfs @ 12.12 hrs, Volume= 0.030 af Primary = 0.70 cfs @ 12.12 hrs, Volume= 0.029 af Routed to Pond SP1A : Study Point 1A Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 5.16' @ 12.12 hrs Surf.Area= 692 sf Storage= 298 cf Plug-Flow detention time= 46.6 min calculated for 0.059 af (100% of inflow) Center-of-Mass det. time= 46.6 min ( 913.4 - 866.7 ) Volume Invert Avail.Storage Storage Description #1 4.50' 588 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 4.50 250 0 0 5.00 550 200 200 5.50 1,000 388 588 Device Routing Invert Outlet Devices #1 Primary 5.00'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #2 Discarded 4.50'2.410 in/hr Exfiltration over Surface area Phase-In= 0.01' Discarded OutFlow Max=0.04 cfs @ 12.12 hrs HW=5.15' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.04 cfs) Primary OutFlow Max=0.66 cfs @ 12.12 hrs HW=5.15' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 0.66 cfs @ 1.09 fps) Type III 24-hr 25yr Rainfall=6.57"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 14HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Pond IT1: Infiltration Trench 1 Inflow Area = 0.614 ac, 46.07% Impervious, Inflow Depth = 2.87" for 25yr event Inflow = 2.05 cfs @ 12.08 hrs, Volume= 0.147 af Outflow = 2.15 cfs @ 12.08 hrs, Volume= 0.153 af, Atten= 0%, Lag= 0.0 min Discarded = 0.03 cfs @ 11.80 hrs, Volume= 0.047 af Primary = 2.12 cfs @ 12.08 hrs, Volume= 0.106 af Routed to Pond SP1A : Study Point 1A Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs / 2 Peak Elev= 7.86' @ 12.08 hrs Surf.Area= 620 sf Storage= 372 cf Plug-Flow detention time= 11.8 min calculated for 0.147 af (100% of inflow) Center-of-Mass det. time= 41.1 min ( 883.1 - 842.0 ) Volume Invert Avail.Storage Storage Description #1 4.31' 335 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,014 cf Overall x 33.0% Voids #2 6.00' 45 cf Custom Stage Data (Prismatic) Listed below (Recalc) 380 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 4.31 600 0 0 6.00 600 1,014 1,014 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 6.00 20 0 0 7.75 20 35 35 8.00 20 5 40 8.01 1,000 5 45 Device Routing Invert Outlet Devices #1 Discarded 4.31'2.410 in/hr Exfiltration over Surface area Phase-In= 0.01' #2 Primary 7.75'20.0' long x 0.5' breadth free overflow down road Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Discarded OutFlow Max=0.03 cfs @ 11.80 hrs HW=6.47' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.03 cfs) Primary OutFlow Max=2.05 cfs @ 12.08 hrs HW=7.86' (Free Discharge) 2=free overflow down road (Weir Controls 2.05 cfs @ 0.93 fps) Type III 24-hr 25yr Rainfall=6.57"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 15HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Pond SP1A: Study Point 1A Inflow Area = 1.486 ac, 42.64% Impervious, Inflow Depth = 2.14" for 25yr event Inflow = 4.55 cfs @ 12.09 hrs, Volume= 0.265 af Primary = 4.55 cfs @ 12.09 hrs, Volume= 0.265 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 100yr Rainfall=8.64"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 16HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Subcatchment DA1A: Northeast Standish Runoff = 3.27 cfs @ 12.08 hrs, Volume= 0.232 af, Depth= 4.54" Routed to Pond IT1 : Infiltration Trench 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 100yr Rainfall=8.64" Area (sf) CN Description 9,276 98 Paved parking, HSG A 3,041 98 Roofs, HSG A 14,398 39 >75% Grass cover, Good, HSG A * 23 40 Permeable Pavement, HSG A 26,738 66 Weighted Average 14,421 39 53.93% Pervious Area 12,317 98 46.07% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment DA1B: Southeast Standish Runoff = 1.40 cfs @ 12.08 hrs, Volume= 0.101 af, Depth= 3.35" Routed to Pond BIO1 : Bioretention 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 100yr Rainfall=8.64" Area (sf) CN Description 2,811 98 Paved parking, HSG A 1,355 98 Roofs, HSG A 10,401 39 >75% Grass cover, Good, HSG A 276 98 Water Surface, HSG A * 969 40 Permeable Pavement, HSG A 15,812 56 Weighted Average 11,370 39 71.91% Pervious Area 4,442 98 28.09% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment DA1C: Southwest Standish Runoff = 2.86 cfs @ 12.08 hrs, Volume= 0.203 af, Depth= 4.78" Routed to Pond SP1A : Study Point 1A Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr 100yr Rainfall=8.64" Type III 24-hr 100yr Rainfall=8.64"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 17HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Area (sf) CN Description 9,357 98 Paved parking, HSG A 1,490 98 Roofs, HSG A * 11,143 39 >75% Grass cover, Good, HSG A * 198 40 Permeable Pavement, HSG A 22,188 68 Weighted Average 11,341 39 51.11% Pervious Area 10,847 98 48.89% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Pond BIO1: Bioretention 1 Inflow Area = 0.363 ac, 28.09% Impervious, Inflow Depth = 3.35" for 100yr event Inflow = 1.40 cfs @ 12.08 hrs, Volume= 0.101 af Outflow = 1.35 cfs @ 12.11 hrs, Volume= 0.101 af, Atten= 3%, Lag= 1.6 min Discarded = 0.04 cfs @ 12.11 hrs, Volume= 0.037 af Primary = 1.31 cfs @ 12.11 hrs, Volume= 0.064 af Routed to Pond SP1A : Study Point 1A Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Peak Elev= 5.24' @ 12.11 hrs Surf.Area= 764 sf Storage= 356 cf Plug-Flow detention time= 36.1 min calculated for 0.101 af (100% of inflow) Center-of-Mass det. time= 36.1 min ( 886.1 - 850.0 ) Volume Invert Avail.Storage Storage Description #1 4.50' 588 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 4.50 250 0 0 5.00 550 200 200 5.50 1,000 388 588 Device Routing Invert Outlet Devices #1 Primary 5.00'4.0' long x 0.5' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #2 Discarded 4.50'2.410 in/hr Exfiltration over Surface area Phase-In= 0.01' Discarded OutFlow Max=0.04 cfs @ 12.11 hrs HW=5.23' (Free Discharge) 2=Exfiltration (Exfiltration Controls 0.04 cfs) Primary OutFlow Max=1.27 cfs @ 12.11 hrs HW=5.23' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 1.27 cfs @ 1.36 fps) Type III 24-hr 100yr Rainfall=8.64"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 18HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Pond IT1: Infiltration Trench 1 Inflow Area = 0.614 ac, 46.07% Impervious, Inflow Depth = 4.54" for 100yr event Inflow = 3.27 cfs @ 12.08 hrs, Volume= 0.232 af Outflow = 3.24 cfs @ 12.08 hrs, Volume= 0.227 af, Atten= 1%, Lag= 0.0 min Discarded = 0.03 cfs @ 11.35 hrs, Volume= 0.051 af Primary = 3.20 cfs @ 12.08 hrs, Volume= 0.176 af Routed to Pond SP1A : Study Point 1A Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs / 2 Peak Elev= 7.90' @ 12.08 hrs Surf.Area= 620 sf Storage= 373 cf Plug-Flow detention time= 47.1 min calculated for 0.227 af (98% of inflow) Center-of-Mass det. time= 35.4 min ( 864.1 - 828.7 ) Volume Invert Avail.Storage Storage Description #1 4.31' 335 cf Custom Stage Data (Prismatic) Listed below (Recalc) 1,014 cf Overall x 33.0% Voids #2 6.00' 45 cf Custom Stage Data (Prismatic) Listed below (Recalc) 380 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 4.31 600 0 0 6.00 600 1,014 1,014 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 6.00 20 0 0 7.75 20 35 35 8.00 20 5 40 8.01 1,000 5 45 Device Routing Invert Outlet Devices #1 Discarded 4.31'2.410 in/hr Exfiltration over Surface area Phase-In= 0.01' #2 Primary 7.75'20.0' long x 0.5' breadth free overflow down road Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Discarded OutFlow Max=0.03 cfs @ 11.35 hrs HW=6.18' (Free Discharge) 1=Exfiltration (Exfiltration Controls 0.03 cfs) Primary OutFlow Max=3.09 cfs @ 12.08 hrs HW=7.89' (Free Discharge) 2=free overflow down road (Weir Controls 3.09 cfs @ 1.07 fps) Type III 24-hr 100yr Rainfall=8.64"22108 STANDISH PR Printed 9/12/2024Prepared by Horsley Witten Inc Page 19HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Pond SP1A: Study Point 1A Inflow Area = 1.486 ac, 42.64% Impervious, Inflow Depth = 3.58" for 100yr event Inflow = 7.30 cfs @ 12.08 hrs, Volume= 0.444 af Primary = 7.30 cfs @ 12.08 hrs, Volume= 0.444 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs Type III 24-hr WQv Rainfall=1.22"22108 STANDISH PR WQv Printed 9/12/2024Prepared by Horsley Witten Inc Page 7HydroCAD® 10.20-2g s/n 01445 © 2022 HydroCAD Software Solutions LLC Summary for Pond SP1A: Study Point 1A Inflow Area = 0.634 ac,100.00% Impervious, Inflow Depth = 0.39" for WQv event Inflow = 0.28 cfs @ 12.07 hrs, Volume= 0.021 af Primary = 0.28 cfs @ 12.07 hrs, Volume= 0.021 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 1.00-72.00 hrs, dt= 0.05 hrs APPENDIX C – Soil Test Pit Logs Surface elevationSE corner, intersection of Windermere Rd and Standish Way 6.7Form 11 - Soil Suitability Assessment for On-Site Sewage DisposalC. On-Site ReviewCommonwealth of MassachusettsYarmouthCity/Town of VegetationSlope (%)LatitudeLongitude41º38'49.10"N 70º15'21.98"WDeep Observation Hole Number:1 1/4/240-3NoOtherWetlands 175feetfeetfeetfeetfeetfeetIf Yes:If Yes:39"Depth standing water in holeDepth weeping from pitSoil Consistence (Moist)Soil StructureRedoximorphic FeaturesCoarse Fragments % by VolumeCobbles/StonesColorPercentGravelOtherDepthDepth (in)Soil Horizon/ LayerSoil Texture (USDA)Soil Matrix: Color-Moist (Munsell)24-27 B LS 10YR 4/6 5 -- - M Fi0-24 A LS 10YR 2/2M Fi27-39 C CS 10YR 5/6 10 - FiSoil LogAdditional Notes: LS: Loamy Sand, CS: Coarse Sand, M: Massive, Fi: FriableDrinking Water WellDrainage Way1. Land Use:Description of Location:2. Soil Parent Material:(e.g. woodland, agricultural field, vacant lot, etc.)1000A 30F CloudWeatherTimeDateHole #3. Distances From:4. Unsuitable Materials Present:5. Groundwater Observed:Open Water BodyProperty Line1755Sandy glaciofluvial deposits Moraines, outwash plainsLandformPosition on Landscape (SU, SH, BS, FS, TS)ROWSurface Stones (e.g. cobbles, stones, boulders, etc.)GrassMYesNoDisturbed SoilFill MaterialWeathered/Fractured RockBedrockYesNo APPENDIX D – Operation and Maintenance Guide Stormwater O&M Guide 1 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA Stormwater Operations & Maintenance Guide Standish Way Stormwater Retrofit Project Table of Contents 1. INTRODUCTION ......................................................................................................................... 2 2. RESPONSIBLE PARTIES AND BUDGET ........................................................................................ 3 3. GREEN STORMWATER INFRASTRUCTURE ................................................................................ 4 3.1. How Does Green Infrastructure Work? ........................................................................................ 4 3.2. What is required for Maintenance? .............................................................................................. 4 3.3. What practices are used at this site? ............................................................................................ 5 4. STRUCTURAL COMPONENTS: BIORETENTION AREA ................................................................ 6 5. STRUCTURAL COMPONENTS: INFILTRATION TRENCH .............................................................. 8 6. STRUCTURAL COMPONENTS: POROUS PAVEMENT ............................................................... 10 7. PLANTINGS .............................................................................................................................. 12 7.1. Plantings ...................................................................................................................................... 12 8. GENERAL SITE MAINTENANCE ............................................................................................... 21 9. LONG-TERM POLLUTION PREVENTION MEASURES ............................................................... 22 ATTACHMENTS A. Maintenance Checklists B. Overall Stormwater Control Measures Locations Plan C. CDS Guide: Operation, Design, Performance and Maintenance D. Planting Plan Stormwater O&M Guide 2 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA 1. INTRODUCTION This document provides a general description along with the operation and maintenance requirements for the Standish Way Stormwater Retrofit project within the Standish Way Right of Way between the intersections of Windemere Road and Sagamore Road. The responsible parties are required to inspect and maintain all measures as outlined in this maintenance guide throughout the year. Site maintenance is divided into three categories as outlined below. 1. Green Stormwater Infrastructure • Structural Components • Structural Maintenance Schedule • Planting • Landscape Maintenance Schedule • Weed Guide 2. General Site Maintenance • Trash & Debris • Pet Waste • Pavement Sweeping • Contributing Drainage Areas • Snow Removal • De-icing 3. Long-Term Pollution Prevention Measures Stormwater O&M Guide 3 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA 2. RESPONSIBLE PARTIES AND BUDGET Standish Way is a Town-owned and operated road. The Town will provide staff, volunteers as possible, and funding for the long-term O&M at the site. Estimated average annual O&M budget for the proposed system: • Bioretentions (1): $2,500 ($2,500/Bio) • Infiltration Trench (1): $1,000 ($1,000/trench) • Drainage Structures (WQU 100) $500 ($500/structure) • Porous Pavement: $1,000 ($500/cleaning) Estimated replacement costs over 50 years: • Bioretentions (assumed 3): $75,000 ($25,000/Replacement) • Infiltration Trench (assumed 3): $45,000 ($15,000/Replacement) • Drainage Structures (assumed 3) $45,000 ($15,000/Replacement) • Porous Pavement (assumed 3): $75,000 ($25,000/Replacement) Replacement costs includes all design components, plantings, and assumed escalation rate. Owner contact information is provided below: Owner: Town of Yarmouth Contact: Department of Public Works Amanda Lima, Town Engineer 74 Town Brook Road West Yarmouth, MA 02673 508-398-2231 Contact: Town of Yarmouth Department of Public Works Nathan Whetten, Senior Project Manager 74 Town Brook Road West Yarmouth, MA 02673 508-398-2231 Owner - Signature: Date: Owner - Signature: Date: Stormwater O&M Guide 4 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA 3. GREEN STORMWATER INFRASTRUCTURE 3.1. How Does Green Infrastructure Work? Green Stormwater Infrastructure (GSI) is a nature-based approach to stormwater treatment and management. These stormwater practices or “treatment areas” are designed to mimic nature and use the natural filtration properties of soil and plants to remove pollutants from stormwater runoff prior to discharging to the municipal drainage system or waterbodies. GSI relies on the following basic steps to function properly. Structural components of the practices facilitate the functioning of the steps. If one of these steps, or components, does not work properly, the entire system can be compromised and the GSI practice itself could be contributing to maintenance problems. This can lead to landscape nuisances, more frequent maintenance, and costly repairs/improvement. The steps are: 1. Collect (Inlets) 2. Move Water (Conveyance) if needed, can come after capturing sediment 3. Capture Sediment (Pretreatment) 4. Treat and Manage (Filter, Infiltrate or Store) 5. Overflow (Structures and Spillways) 3.2. What is required for Maintenance? As these are nature-based systems that rely on plant upkeep, the maintenance for GSI typically falls under landscape and general site maintenance services. Proper operation and maintenance (O&M) are vital to its long-term viability. Regularly scheduled maintenance can prevent system failures due to sediment build-up, damage, or deterioration. The maintenance requirements outlined in this guide are critical to ensure proper treatment, maintain storage capacity and preserve the visual integrity. General maintenance includes the following: 1. Removing sediment from the pretreatment practices used to capture sediment. 2. Maintaining the proper drainage function and pollutant removal capacity of the systems. 3. Maintaining healthy native trees, plants, and vegetative cover as well as the removal of unwanted weeds and invasive species. It is recommended that all practices be maintained regularly as part of the routine landscape maintenance or at a minimum four times per year and after major rain events: • Early Spring: during spring cleanup • Summer: during lawn mowing and other routine site maintenance • Early Fall: when leaves begin to fall • Late Fall/Early Winter: after all the leaves have fallen during leaf removal • After major storm events: 2” of rain or greater. Stormwater O&M Guide 5 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA The following sections describe the general function and landscape maintenance of each practice on the site. Included in the appendices is a specific Inspection Report for the site (Attachment A) along with a plan showing the location of the items to be inspected and maintained (Attachment B). 3.3. What practices are used at this site? The following practices are present at this site: a. Bioretention Area: A bioretention area is a stormwater management practice to manage and treat stormwater runoff using a conditioned planting soil bed or “filter” media and plants to filter runoff captured in a shallow depression. The method combines physical filtering and adsorption with bio-geochemical processes to remove pollutants. b. Infiltration Trench: Infiltration trenches are used for temporary underground storage of stormwater in a stone reservoir, allowing it to infiltrate into the underlying native soil. c. Porous Pavement: Porous pavements are designed to capture and infiltrate runoff. The areas of porous pavement have been placed to ensure they do not collect runoff from the traditional impervious pavement, as this can clog the pervious pavement. Regular maintenance is critical to the success of this practice. The maintenance for the green infrastructure is divided into two categories: a. The Structural Components that make up the basic steps of a functioning system. b. The Plantings that are the landscape and filtration element. Each category is further described in the sections below. Stormwater O&M Guide 6 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA 4. STRUCTURAL COMPONENTS: BIORETENTION AREA Structural Components 1. Collect: Stormwater runoff is directed to paved flume inlet where stormwater enters the sediment forebay. 2. Capture Sediment: Sand and debris settle out within sediment forebays. 3. Move Water: The stormwater discharges directly to the bioretention area via a check dam weir. 4. Treat and Manage: Stormwater overtops the forebay check dam and flows through the planted bioretention area. Plants slow the water down, and the soil media and plant roots filter the runoff, removing nutrients and bacteria. The treated water then infiltrates into the soil below or overflows as described below. 5. Overflow: During larger rain events, the water level will rise and once the bioretention area reaches capacity runoff will bypass the paved flume and continue down the road. 4 3 2 1 5 Stormwater O&M Guide 7 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA MAINTENANCE SCHEDULE: BIORETENTION AREA A site inspection of the bioretention components shall be conducted at least twice a year in the Spring and Fall, and after major storm events (2” of rain or greater). Debris and trash should be removed monthly (between April and November) and sediment removal should occur during the two site inspections and during the monthly debris and trash inspections as needed. See the calendar below and the Inspection Report in Attachment A for more information. Bioretention General Maintenance Schedule Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec Task Frequency & Time of the Year Site Inspection X X Debris & Trash Removal X X X X X X X X Sediment Removal X x x x x x x X should also be completed after major storm events X required inspection x as needed • When removing trash and debris during monthly inspections look for: o If sediment is > 3” in paver lined sediment forebays. Ensure sediment does not cause blockage of inlet weirs. If it is, remove sediment. o If standing water does not drain after 48 hours. See Inspection Report for action items. • After rain event look for: o If standing water does not drain after 48 hours. See Inspection Report for action items. See Plantings section for information on plantings maintenance of the bioretention area. Use the plantings maintenance calendar to combine maintenance efforts. Stormwater O&M Guide 8 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA 5. STRUCTURAL COMPONENTS: INFILTRATION TRENCH 1. Collect: Stormwater runoff is collected along the road gutter via overland flow through a water quality unit inlet. 2. Capture Sediment: The water quality unit with catch basin grate captures sediment, trash, and debris. 3. Move Water: Stormwater runoff flows through the 8” perforated underdrain pipe which discharges to the stone reservoir. 4. Infiltrate: Stormwater is infiltrated into the subsoils. 5. Overflow: During larger rain events, once the stone reservoir and water quality unit have reached capacity, runoff will continue down the road. 1 4 2 4 3 5 Stormwater O&M Guide 9 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA MAINTENANCE SCHEDULE: INFILTRATION TRENCH A site inspection of the infiltration trench components shall be conducted at least twice a year in the Spring and Fall, and after major storm events (2” of rain or greater). Debris and trash should be removed monthly (between April and November) and sediment removal should occur during the two site inspections and during the monthly debris and trash inspections as needed. See the calendar below and the Inspection Report in Attachment A for more information. See the CDS Inspection and Maintenance Guide in Attachment C for maintenance guidance on the water quality unit. Infiltration Trench General Maintenance Schedule Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec Task Frequency & Time of the Year Site Inspection X X Debris & Trash Removal X X X X X X X X Sediment Removal X x x x x x x X should also be completed after major storm events X required inspection x as needed • After rain event look for: o If standing water does not drain after 48 hours. See Inspection Report for action items. See Plantings section for information on plantings maintenance of the infiltration basin. Use the plantings maintenance calendar to combine maintenance efforts. Stormwater O&M Guide 10 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA 6. STRUCTURAL COMPONENTS: POROUS PAVEMENT Structural Components 1. Collect: Stormwater runoff is absorbed directly into the pervious surface when it rains. 2. Capture Sediment: Porous pavements are designed for minimal run-on from permeable surfaces (like lawn areas) and no runoff from impervious pavement, so sediment should be minimal. Sediment will filter into the porous pavement and will eventually clog. 3. Move Water: The stormwater filters through the surface material and choker courses. 4. Treat and Manage: The stormwater is treated as it flows through the filter course into the underlying native soils. 5. Overflow: During larger rain events, once the porous pavement and gravel below are saturated, additional runoff will flow downgradient to the bioretention or road. Stormwater O&M Guide 11 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA MAINTENANCE SCHEDULE: POROUS PAVEMENT A site inspection of the porous pavement shall be conducted at least twice a year in the Spring and Fall, and after major storm events (2” of rain or greater). See the calendar below. Pervious Pavement and Pavers General Maintenance Schedule Jan Feb Mar Apr May Jun July Aug Sep Oct Nov Dec Task Frequency & Time of the Year Site Inspection X X Debris & Trash Removal X x x x x x x X Sediment Removal x x x X x x x x x x X x should also be completed after major storm events X required inspection x as needed Frequent cleaning and maintenance is critical to prevent clogging of porous surfaces. To keep the surface clean, sweep the porous pavement using vacuum sweepers at least twice a year. No sanding or de-icing is permitted. Full porous pavement replacement will be conducted every 10-20 years or as determined necessary due to field conditions. Stormwater O&M Guide 12 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA 7. PLANTINGS 7.1. Plantings The planting design for the site consists of two landscape maintenance areas. The “mow” area which consists of turf and the “no mow” areas. The plantings maintenance checklist is included in Attachment A, and the full planting plan is available in Attachment D. “Mow” Areas No “Mow” Area Stormwater O&M Guide 13 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA PLANTINGS: “MOW” AREAS MAINTENANCE There is an area of the site that is allowed to be maintained as “mowed” lawn as necessary. Landscape maintenance of “mowed” lawn areas includes the following: Seeding Loam and reseed bare spots with a seed mix that matches existing species. Mowing/Weed Whacking Cut only 1/3 of vegetation. Do not mow during drought periods or when excessively wet. Depending on height of grasses and the time of year, grass cuttings/stalks may need to be raked and removed from site. Watering Allowing the lawn areas to “brown” is desired. Water only during drought conditions or during reseeding establishment period. Fertilizing No fertilizer shall be used. Weeding Weeding should be limited to invasive and weedy species (see section 3.6 Weed Identification below and the Weed Guide at https://web.uri.edu/riss/files/In-the-Weeds.pdf). Non-chemical methods (hand pulling and hoeing) are required; chemical herbicides should be avoided. Properly remove and dispose of all invasive species off site as to prevent colonization elsewhere, this includes disposal on land beyond the project area. Monitoring During the establishment period, walk the mow areas monthly during the first year to look for invasive species, bare spots and identify potential pest or disease problems. Properly remove and dispose of all invasive species as to prevent colonization elsewhere, this includes disposal on land beyond the project area. Debris & Trash Remove and properly dispose litter from all areas prior to mowing. Stormwater O&M Guide 14 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA PLANTINGS: NO “MOW” AREA MAINTENANCE (BIORETENTION AREAS) By design, plants in bioretention areas are meant to flourish throughout the growing season leaving dry standing stalks during the dormant months. Plants do not require fertilizers or watering (except during drought or establishment period). This area, as well as the area surrounding the forebay, is designated as “no mow.” Frequent mowing would eliminate selected meadow species, may promote the growth of undesirable plants, and require additional maintenance and watering. It is recommended this area be cut back no more than one time per year and only as necessary. Remove and replace vegetation as necessary, using the appropriate species as shown on the Planting Plan. The best time to plant is in early to mid-fall or early to mid-spring. Specific maintenance activities of the “no mow” area include: Seeding Loam and reseed bare spots with the specified seed mix as shown on the Planting Plan. Cutting Back Recommend cutting with shears a maximum of once a year in early spring. Otherwise, allow areas to grow to their natural heights (12” to 36”) to maintain a meadow appearance. Do NOT cut area lower than 6” – maintain sporadic wooden stakes on site at 6” height to provide visual cues during cutting. Depending on height of grasses and the time of year, grass cuttings/stalks may need to be raked and removed from site so as not to clog the bioretention. Use a leaf blower as needed to assist in clean-up. Pruning Prune trees and shrubs to remove deadwood and low hanging branches. Watering Water only during drought conditions or during reseeding establishment period. Fertilizing No fertilizer shall be used. Weeding Weeding should be limited to invasive and weedy species (see section on Weed Identification below and the Weed Guide at https://web.uri.edu/riss/files/In-the-Weeds.pdf). Non-chemical methods (hand pulling and hoeing) are required; chemical herbicides should be avoided. Properly remove and dispose off site all invasive species as to prevent colonization elsewhere; this includes disposal on land beyond the project area. Monitoring During the establishment period, walk the “no mow” areas monthly without the intent to cut, but to look for invasive species, bare spots and identify potential pest or disease problems. Debris & Trash Remove and properly dispose of litter from all areas. Stormwater O&M Guide 15 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA PLANTINGS: REPLACEMENTS The plants that thrive in bioretention areas are typically quite drought tolerant due to the filter profile having a top layer of planting soil and sandy soil media below. They need to be able to withstand periods of inundation after storm events; however, when it doesn’t rain, there will be less water held naturally in the sand than in other soil types for the plants to use, so they need to tolerate dry periods as well. Specifying plants native to the area increases the ecosystem benefits by helping to support native wildlife like pollinators. If replacements are needed, use the planting plan as a guide (see Attachment D). However, if all the plants of a certain species have not done well in the bioretention area or other locations on the site, do not replace with that same species. Rather, replant with one or more of the other species that has thrived under the conditions or have a plant professional choose a different species based on current photos of the site. Site specific considerations for plants in bioretention areas should be: • Preferably native and pollinator-friendly • Drought tolerant • Tolerant of inundation for 24 hours • Size constraints: - taller perennials at the bottom of the bioretention - shorter perennials on the side slopes • Salt and wind tolerant • A mix of different types of plants that will create a resilient plant community: cold & warm season grasses, perennials, groundcovers in all areas. Stormwater O&M Guide 16 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA PLANTINGS: MAINTENANCE SCHEDULE By design, plants in the bioretention area are meant to help filter the stormwater as it passes through and flourish throughout the growing season. The plants do not require fertilizers or mulch, and, after establishment, only need water during periods of drought. Remove and replace vegetation as necessary, using the appropriate species as discussed in the no-mow section above. Weeding and monitoring for invasive species should occur quarterly during the growing season. An annual spring “clean up” includes cutting last season’s growth of the perennials and pruning as needed. See the calendar below, the Plantings Maintenance Checklist in Attachment A, the Weed Identification section, and the Weed Identification Guide at https://web.uri.edu/riss/files/In-the-Weeds.pdf for more information. Bioretention Landscape Maintenance Schedule Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Task Frequency & Time of the Year Cutting X Mowing x X x x x x x x X x x Weeding X X X X Monitoring X X X X Watering x x x x Seeding x x x x Plant Replacement x x x x “Mow” Areas No “Mow” Areas All areas X required x as needed • Trash and debris are removed during monthly structural component inspections but can also be completed during landscape maintenance visits for weeding and monitoring. Stormwater O&M Guide 17 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA PLANTINGS: WEED IDENTIFICATION Yellow Toadflax (Linaris vulgaris) Redroot Pigweed- (Amaranthus retroflexus) Smartweed (Polygonum lapathifolium) Dandelion (Taraxacum officinale) Stormwater O&M Guide 18 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA PLANTINGS: WEED IDENTIFICATION Fireweed (Erechtites hieracifolia) Spotted Spurge (Euphorbia maculata) Crabgrass (Digitaria ischaemum) Crabgrass with seedheads Ragweed (Ambrosia artemisiifolia) Japanese Knotweed (Polygonum cuspidatum) Stormwater O&M Guide 19 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA PLANTINGS: WEED IDENTIFICATION Ragweed (Ambrosia artemisiifolia) Oriental Bittersweet (Celastrus orbiculatus) Green Foxtail (Setaria viridis) Norway Maple Tree Seedling (Acer platanoides) Stormwater O&M Guide 20 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA PLANTINGS: WEED IDENTIFICATION Catalpa Tree Seedling (Catalpa speciosa) Purple Loosestrife (Lythrum salicaria) Field Bindweed (Convolvulus arvensis) Black Swallow-wort (Cynanchum louisea) Stormwater O&M Guide 21 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA 8. GENERAL SITE MAINTENANCE General site maintenance includes the following requirements: Trash & Debris Remove and properly dispose of all trash and debris. Pet Waste Visitors to the site are encouraged to pick up after their pets. Remove and properly dispose of all pet waste left behind. Pet waste should be picked up and disposed of properly to reduce bacteria and nutrient levels in stormwater. Pavement Sweeping Paved roadways should be mechanically swept, at a minimum of once per year in early spring, to remove accumulated sand and sediment debris. Porous pavement should be swept using a vacuum sweeper at least twice a year. Snow Removal Due to the potential for plant damage, snow piling and or removal is NOT recommended in the bioretention areas. De-Icing When de-icing compounds are necessary for areas draining to the green stormwater infrastructure, the least harmful chemicals should be used. Excessive salting should be avoided. Use of large amounts of sand should also be avoided, since it may obstruct the conveyance system. Ice removal is NOT permitted in the bioretention area or porous pavement. Stormwater O&M Guide 22 August 2024 Standish Way Stormwater Retrofit Project Yarmouth, MA 9. LONG-TERM POLLUTION PREVENTION MEASURES Long-term pollution prevention measures implemented at the site reduce pollutants in stormwater discharges. The following precautions will be employed on an on-going basis. Spill Prevention & Control Measures To minimize the risk of spills or other accidental exposure of materials and substances to stormwater runoff, the following material management is to be used when working on site. • Any materials stored on-site will be stored in a neat, orderly manner in their appropriate containers. • Products will be kept in their original containers with the original manufacturer’s label. • Substances will not be mixed with one another unless recommended by the manufacturer. • Manufacturers’ recommendations for proper use and disposal will be followed. • The contractor’s supervisor will be issued this Guide to ensure proper use and disposal of materials. Materials or substances listed below may be present on-site for maintenance and care should be taken to avoid spills: o Petroleum Based Products The following product-specific measures will be followed on-site: • Petroleum Products - All on-site vehicles will be monitored for leaks and receive preventative maintenance to reduce the chance of leakage. • Grass Clipping, Leaf Litter and Plant Debris – are to be removed from the property and not disposed on site. ATTACHMENT A – Maintenance Checklists • Bioretention Area • Infiltration Trench • Porous Pavement • Landscaping Operation and Maintenance Checklist Standish Way Stormwater Retrofit Project 1 Date: Time: Inspector: Maintenance Item Description Maintenance (Y/N) 1, 2 & 3. Inlet Flume, Sediment Forebay, Water Quality Unit, Underdrain, and Check Dam Weir Debris Cleanout Remove all trash, leaf litter and debris from the inlet and water quality unit. Sediment/Organic Debris Removal Check for clogging and sediment accumulation that impacts inflow and outflow. Remove and properly dispose of sediment when the catch basin sump is 50% full. Remove/cut any vegetation that sprouts through voids in grates, covers, or pavement. Using Vac Truck cutter cut/remove any roots/vegetation that encroach on the infiltration trench underdrain and any other drainage pipes and structures. Inspect and clean out water quality units per manufacturer’s instructions in Attachment C.* Erosion Check for areas of erosion (gullies, animal burrowing, or overtopping), particularly near check dam weirs, perimeter, and guard rail posts. Repair as necessary and return to design grades. Actions to be taken: 4 & 5. Bioretention Area, Infiltration Trench Debris Cleanout Remove trash and debris from the surface. Erosion Signs of erosion gullies, animal burrowing, or overtopping are observed. Repair as necessary. Sediment/Organic Debris Removal Remove sediment accumulation and properly dispose when accumulation is greater than or equal to 3 inches.* Water Draining properly If standing water is observed in bioretention area for more than 48 hours after a storm event, rototill or aerate the bottom 6 inches to break up any hard-packed sediment, and re-plant as needed. Check for sediment accumulation and/or standing water that indicates clogging in the infiltration trench. If sediment or standing water is observed in the trench for more than 48 hours after a storm event, clean out infiltration trench. Operation and Maintenance Checklist Standish Way Stormwater Retrofit Project 2 Maintenance Item Description Maintenance (Y/N) Actions to be taken: Porous Pavement Debris Removal Remove trash from paved and perimeter areas. Sweep surface. Vacuum Vacuum surface to clean pores of debris and sediment with a commercial vacuum system. Structure Repair cracking or other structural issues as found during inspection. Actions to be taken: General Site Maintenance Debris Removal Remove trash from perimeter areas. Pet Waste Removal Remove any pet waste from perimeter areas. Pavement Sweeping Sweep road minimum once a year after spring thaw. Contributing drainage area Confirm that contributing drainage area stabilized – stabilize as necessary. Snow Removal Ensure snow piles do no block inlet structures and are not placed in the bioretention area. De-Icing Do not remove ice in the bioretention areas. If needed on road, use de-icing compounds with the least harmful chemicals. Avoid excessive salting or large amounts of sand. Actions to be taken: *Sediment shall be disposed of offsite in a pre-approved location. Plantings Maintenance Checklist Standish Way Stormwater Retrofit Project 1 Location: Date: Inspector: Task Description Complete (Y/N) Cutting • Cut with shears once a year in the early spring. • Do not cut lower than 6”. • Blow out leaves and cuttings for easy removal. • Remove cuttings so the bioretention area does not clog. Mowing • Mow twice a year or more frequently as needed with a mulching mower or weed whacker depending on the frequency of cutting. • Bag clippings as needed and dispose of off site. • Maintain a cutting height of 3” or greater. • Leave the grass taller in the warmer months. • Trim edges when necessary. Weeding • Weeding should be limited to invasive and exotic species, which can overwhelm the desired plant community.* • Non-chemical methods including hand pulling and hoeing are recommended. • Chemical herbicides are not allowed. Monitoring • Look for potential invasive species and identify potential disease. Remove and dispose of all invasive species.* (see weeding) Watering • During establishment or drought conditions, plants should be watered a minimum of once every seven to ten days. Seeding • Loam and re-seed bare spots with the specified seed mix as shown on the Planting Plan. Plant Replacement • Replace/replant diseases, unhealthy or dead plans to maintain a healthy plant community Fertilizing NONE Mulch NONE Actions to be taken: *Invasive species shall be disposed of offsite in a pre-approved location. Species observed on or nearby site include Asian bittersweet and common reed (Phragmites australis). “Mowed” Areas No “Mow” Areas (Bioretention Areas) All areas ATTACHMENT B – Overall SCM Locations ATTACHMENT C – CDS Guide: Operation, Design, Performance and Maintenance CDS Guide Operation, Design, Performance and Maintenance ENGINEERED SOLUTIONS 2 CDS® Using patented continuous deflective separation technology, the CDS system screens, separates and traps debris, sediment, and oil and grease from stormwater runoff. The indirect screening capability of the system allows for 100% removal of floatables and neutrally buoyant material without blinding. Flow and screening controls physically separate captured solids, and minimize the re-suspension and release of previously trapped pollutants. Inline units can treat up to 6 cfs, and internally bypass flows in excess of 50 cfs (1416 L/s). Available precast or cast-in- place, offline units can treat flows from 1 to 300 cfs (28.3 to 8495 L/s). The pollutant removal capacity of the CDS system has been proven in lab and field testing. Operation Overview Stormwater enters the diversion chamber where the diversion weir guides the flow into the unit’s separation chamber and pollutants are removed from the flow. All flows up to the system’s treatment design capacity enter the separation chamber and are treated. Swirl concentration and screen deflection force floatables and solids to the center of the separation chamber where 100% of floatables and neutrally buoyant debris larger than the screen apertures are trapped. Stormwater then moves through the separation screen, under the oil baffle and exits the system. The separation screen remains clog free due to continuous deflection. During the flow events exceeding the treatment design capacity, the diversion weir bypasses excessive flows around the separation chamber, so captured pollutants are retained in the separation cylinder. Design Basics There are three primary methods of sizing a CDS system. The Water Quality Flow Rate Method determines which model size provides the desired removal efficiency at a given flow rate for a defined particle size. The Rational Rainfall Method™ or the and Probabilistic Method is used when a specific removal efficiency of the net annual sediment load is required. Typically in the Unites States, CDS systems are designed to achieve an 80% annual solids load reduction based on lab generated performance curves for a gradation with an average particle size (d50) of 125 microns (μm). For some regulatory environments, CDS systems can also be designed to achieve an 80% annual solids load reduction based on an average particle size (d50) of 75 microns (μm) or 50 microns (μm). Water Quality Flow Rate Method In some cases, regulations require that a specific treatment rate, often referred to as the water quality design flow (WQQ), be treated. This WQQ represents the peak flow rate from either an event with a specific recurrence interval, e.g. the six-month storm, or a water quality depth, e.g. 1/2-inch (13 mm) of rainfall. The CDS is designed to treat all flows up to the WQQ. At influent rates higher than the WQQ, the diversion weir will direct most flow exceeding the WQQ around the separation chamber. This allows removal efficiency to remain relatively constant in the separation chamber and eliminates the risk of washout during bypass flows regardless of influent flow rates. Treatment flow rates are defined as the rate at which the CDS will remove a specific gradation of sediment at a specific removal efficiency. Therefore the treatment flow rate is variable, based on the gradation and removal efficiency specified by the design engineer. Rational Rainfall Method™ Differences in local climate, topography and scale make every site hydraulically unique. It is important to take these factors into consideration when estimating the long-term performance of any stormwater treatment system. The Rational Rainfall Method combines site-specific information with laboratory generated performance data, and local historical precipitation records to estimate removal efficiencies as accurately as possible. Short duration rain gauge records from across the United States and Canada were analyzed to determine the percent of the total annual rainfall that fell at a range of intensities. US stations’ depths were totaled every 15 minutes, or hourly, and recorded in 0.01-inch increments. Depths were recorded hourly with 1-mm resolution at Canadian stations. One trend was consistent at all sites; the vast majority of precipitation fell at low intensities and high intensity storms contributed relatively little to the total annual depth. These intensities, along with the total drainage area and runoff coefficient for each specific site, are translated into flow rates using the Rational Rainfall Method. Since most sites are relatively small and highly impervious, the Rational Rainfall Method is appropriate. Based on the runoff flow rates calculated for each intensity, operating rates within a proposed CDS system are GRATE INLET(CAST IRON HOOD FORCURB INLET OPENING) CREST OF BYPASS WEIR(ONE EACH SIDE) INLET(MULTIPLE PIPES POSSIBLE) OIL BAFFLE SUMP STORAGESEPARATION SLAB TREATMENT SCREEN OUTLET INLET FLUME SEPARATION CYLINDER CLEAN OUT(REQUIRED) DEFLECTION PAN, 3 SIDED(GRATE INLET DESIGN) 3 determined. Performance efficiency curve determined from full scale laboratory tests on defined sediment PSDs is applied to calculate solids removal efficiency. The relative removal efficiency at each operating rate is added to produce a net annual pollutant removal efficiency estimate. Probabilistic Rational Method The Probabilistic Rational Method is a sizing program Contech developed to estimate a net annual sediment load reduction for a particular CDS model based on site size, site runoff coefficient, regional rainfall intensity distribution, and anticipated pollutant characteristics. The Probabilistic Method is an extension of the Rational Method used to estimate peak discharge rates generated by storm events of varying statistical return frequencies (e.g. 2-year storm event). Under the Rational Method, an adjustment factor is used to adjust the runoff coefficient estimated for the 10-year event, correlating a known hydrologic parameter with the target storm event. The rainfall intensities vary depending on the return frequency of the storm event under consideration. In general, these two frequency dependent parameters (rainfall intensity and runoff coefficient) increase as the return frequency increases while the drainage area remains constant. These intensities, along with the total drainage area and runoff coefficient for each specific site, are translated into flow rates using the Rational Method. Since most sites are relatively small and highly impervious, the Rational Method is appropriate. Based on the runoff flow rates calculated for each intensity, operating rates within a proposed CDS are determined. Performance efficiency curve on defined sediment PSDs is applied to calculate solids removal efficiency. The relative removal efficiency at each operating rate is added to produce a net annual pollutant removal efficiency estimate. Treatment Flow Rate The inlet throat area is sized to ensure that the WQQ passes through the separation chamber at a water surface elevation equal to the crest of the diversion weir. The diversion weir bypasses excessive flows around the separation chamber, thus preventing re-suspension or re-entrainment of previously captured particles. Hydraulic Capacity The hydraulic capacity of a CDS system is determined by the length and height of the diversion weir and by the maximum allowable head in the system. Typical configurations allow hydraulic capacities of up to ten times the treatment flow rate. The crest of the diversion weir may be lowered and the inlet throat may be widened to increase the capacity of the system at a given water surface elevation. The unit is designed to meet project specific hydraulic requirements. Performance Full-Scale Laboratory Test Results A full-scale CDS system (Model CDS2020-5B) was tested at the facility of University of Florida, Gainesville, FL. This CDS unit was evaluated under controlled laboratory conditions of influent flow rate and addition of sediment. Two different gradations of silica sand material (UF Sediment & OK-110) were used in the CDS performance evaluation. The particle size distributions (PSDs) of the test materials were analyzed using standard method “Gradation ASTM D-422 “Standard Test Method for Particle-Size Analysis of Soils” by a certified laboratory. UF Sediment is a mixture of three different products produced by the U.S. Silica Company: “Sil-Co-Sil 106”, “#1 DRY” and “20/40 Oil Frac”. Particle size distribution analysis shows that the UF Sediment has a very fine gradation (d50 = 20 to 30 μm) covering a wide size range (Coefficient of Uniformity, C averaged at 10.6). In comparison with the hypothetical TSS gradation specified in the NJDEP (New Jersey Department of Environmental Protection) and NJCAT (New Jersey Corporation for Advanced Technology) protocol for lab testing, the UF Sediment covers a similar range of particle size but with a finer d50 (d50 for NJDEP is approximately 50 μm) (NJDEP, 2003). The OK-110 silica sand is a commercial product of U.S. Silica Sand. The particle size distribution analysis of this material, also included in Figure 1, shows that 99.9% of the OK-110 sand is finer than 250 microns, with a mean particle size (d50) of 106 microns. The PSDs for the test material are shown in Figure 1. Figure 1. Particle size distributions Tests were conducted to quantify the performance of a specific CDS unit (1.1 cfs (31.3-L/s) design capacity) at various flow rates, ranging from 1% up to 125% of the treatment design capacity of the unit, using the 2400 micron screen. All tests were conducted with controlled influent concentrations of approximately 200 mg/L. Effluent samples were taken at equal time intervals across the entire duration of each test run. These samples were then processed with a Dekaport Cone sample splitter to obtain representative sub-samples for Suspended Sediment Concentration (SSC) testing using ASTM D3977-97 “Standard Test Methods for Determining Sediment Concentration in Water Samples”, and particle size distribution analysis. Results and Modeling Based on the data from the University of Florida, a performance model was developed for the CDS system. A regression analysis was used to develop a fitting curve representative of the scattered data points at various design flow rates. This model, which demonstrated good agreement with the laboratory data, can then be used to predict CDS system performance with respect 4 to SSC removal for any particle size gradation, assuming the particles are inorganic sandy-silt. Figure 2 shows CDS predictive performance for two typical particle size gradations (NJCAT gradation and OK-110 sand) as a function of operating rate. Figure 2. CDS stormwater treatment predictive performance for various particle gradations as a function of operating rate. Many regulatory jurisdictions set a performance standard for hydrodynamic devices by stating that the devices shall be capable of achieving an 80% removal efficiency for particles having a mean particle size (d50) of 125 microns (e.g. Washington State Department of Ecology — WASDOE - 2008). The model can be used to calculate the expected performance of such a PSD (shown in Figure 3). The model indicates (Figure 4) that the CDS system with 2400 micron screen achieves approximately 80% removal at the design (100%) flow rate, for this particle size distribution (d50 = 125 μm). Figure 3. WASDOE PSD Figure 4. Modeled performance for WASDOE PSD. Maintenance The CDS system should be inspected at regular intervals and maintained when necessary to ensure optimum performance. The rate at which the system collects pollutants will depend more heavily on site activities than the size of the unit. For example, unstable soils or heavy winter sanding will cause the grit chamber to fill more quickly but regular sweeping of paved surfaces will slow accumulation. Inspection Inspection is the key to effective maintenance and is easily performed. Pollutant transport and deposition may vary from year to year and regular inspections will help ensure that the system is cleaned out at the appropriate time. At a minimum, inspections should be performed twice per year (e.g. spring and fall) however more frequent inspections may be necessary in climates where winter sanding operations may lead to rapid accumulations, or in equipment washdown areas. Installations should also be inspected more frequently where excessive amounts of trash are expected. The visual inspection should ascertain that the system components are in working order and that there are no blockages or obstructions in the inlet and separation screen. The inspection should also quantify the accumulation of hydrocarbons, trash, and sediment in the system. Measuring pollutant accumulation can be done with a calibrated dipstick, tape measure or other measuring instrument. If absorbent material is used for enhanced removal of hydrocarbons, the level of discoloration of the sorbent material should also be identified 5 during inspection. It is useful and often required as part of an operating permit to keep a record of each inspection. A simple form for doing so is provided. Access to the CDS unit is typically achieved through two manhole access covers. One opening allows for inspection and cleanout of the separation chamber (cylinder and screen) and isolated sump. The other allows for inspection and cleanout of sediment captured and retained outside the screen. For deep units, a single manhole access point would allows both sump cleanout and access outside the screen. The CDS system should be cleaned when the level of sediment has reached 75% of capacity in the isolated sump or when an appreciable level of hydrocarbons and trash has accumulated. If absorbent material is used, it should be replaced when significant discoloration has occurred. Performance will not be impacted until 100% of the sump capacity is exceeded however it is recommended that the system be cleaned prior to that for easier removal of sediment. The level of sediment is easily determined by measuring from finished grade down to the top of the sediment pile. To avoid underestimating the level of sediment in the chamber, the measuring device must be lowered to the top of the sediment pile carefully. Particles at the top of the pile typically offer less resistance to the end of the rod than consolidated particles toward the bottom of the pile. Once this measurement is recorded, it should be compared to the as-built drawing for the unit to determine weather the height of the sediment pile off the bottom of the sump floor exceeds 75% of the total height of isolated sump. Cleaning Cleaning of a CDS systems should be done during dry weather conditions when no flow is entering the system. The use of a vacuum truck is generally the most effective and convenient method of removing pollutants from the system. Simply remove the manhole covers and insert the vacuum hose into the sump. The system should be completely drained down and the sump fully evacuated of sediment. The area outside the screen should also be cleaned out if pollutant build-up exists in this area. In installations where the risk of petroleum spills is small, liquid contaminants may not accumulate as quickly as sediment. However, the system should be cleaned out immediately in the event of an oil or gasoline spill. Motor oil and other hydrocarbons that accumulate on a more routine basis should be removed when an appreciable layer has been captured. To remove these pollutants, it may be preferable to use absorbent pads since they are usually less expensive to dispose than the oil/water emulsion that may be created by vacuuming the oily layer. Trash and debris can be netted out to separate it from the other pollutants. The screen should be cleaned to ensure it is free of trash and debris. Manhole covers should be securely seated following cleaning activities to prevent leakage of runoff into the system from above and also to ensure that proper safety precautions have been followed. Confined space entry procedures need to be followed if physical access is required. Disposal of all material removed from the CDS system should be done in accordance with local regulations. In many jurisdictions, disposal of the sediments may be handled in the same manner as the disposal of sediments removed from catch basins or deep sump manholes. Check your local regulations for specific requirements on disposal. 6 Note: To avoid underestimating the volume of sediment in the chamber, carefully lower the measuring device to the top of the sediment pile. Finer silty particles at the top of the pile may be more difficult to feel with a measuring stick. These finer particles typically offer less resistance to the end of the rod than larger particles toward the bottom of the pile. CDS Model Diameter Distance from Water Surface to Top of Sediment Pile Sediment Storage Capacity ft m ft m y3 m3 CDS1515 3 0.9 3.0 0.9 0.5 0.4 CDS2015 4 1.2 3.0 0.9 0.9 0.7 CDS2015 5 1.5 3.0 0.9 1.3 1.0 CDS2020 5 1.5 3.5 1.1 1.3 1.0 CDS2025 5 1.5 4.0 1.2 1.3 1.0 CDS3020 6 1.8 4.0 1.2 2.1 1.6 CDS3025 6 1.8 4.0 1.2 2.1 1.6 CDS3030 6 1.8 4.6 1.4 2.1 1.6 CDS3035 6 1.8 5.0 1.5 2.1 1.6 CDS4030 8 2.4 4.6 1.4 5.6 4.3 CDS4040 8 2.4 5.7 1.7 5.6 4.3 CDS4045 8 2.4 6.2 1.9 5.6 4.3 CDS5640 10 3.0 6.3 1.9 8.7 6.7 CDS5653 10 3.0 7.7 2.3 8.7 6.7 CDS5668 10 3.0 9.3 2.8 8.7 6.7 CDS5678 10 3.0 10.3 3.1 8.7 6.7 Table 1: CDS Maintenance Indicators and Sediment Storage Capacities 7 CDS Inspection & Maintenance Log CDS Model: Location: Water Floatable Describe Maintenance Date depth to Layer Maintenance Personnel Comments sediment1 Thickness2 Performed —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— —————————————————————————————————————————————————————————— 1. The water depth to sediment is determined by taking two measurements with a stadia rod: one measurement from the manhole opening to the top of the sediment pile and the other from the manhole opening to the water surface. If the difference between these measurements is less than the values listed in table 1 the system should be cleaned out. Note: to avoid underestimating the volume of sediment in the chamber, the measuring device must be carefully lowered to the top of the sediment pile. 2. For optimum performance, the system should be cleaned out when the floating hydrocarbon layer accumulates to an appreciable thickness. In the event of an oil spill, the system should be cleaned immediately. SUPPORT • Drawings and specifications are available at www.ContechES.com. • Site-specific design support is available from our engineers. ©2017 Contech Engineered Solutions LLC, a QUIKRETE Company Contech Engineered Solutions provides site solutions for the civil engineering industry. Contech’s portfolio includes bridges, drainage, sanitary sewer, earth stabilization and stormwater treatment products. For information on other Contech division offerings, visit www.ContechES.com or call 800.338.1122 NOTHING IN THIS CATALOG SHOULD BE CONSTRUED AS A WARRANTY. APPLICATIONS SUGGESTED HEREIN ARE DESCRIBED ONLY TO HELP READERS MAKE THEIR OWN EVALUATIONS AND DECISIONS, AND ARE NEITHER GUARANTEES NOR WARRANTIES OF SUITABILITY FOR ANY APPLICATION. CONTECH MAKES NO WARRANTY WHATSOEVER, EXPRESS OR IMPLIED, RELATED TO THE APPLICATIONS, MATERIALS, COATINGS, OR PRODUCTS DISCUSSED HEREIN. ALL IMPLIED WARRANTIES OF MERCHANTABILITY AND ALL IMPLIED WARRANTIES OF FITNESS FOR ANY PARTICULAR PURPOSE ARE DISCLAIMED BY CONTECH. SEE CONTECH’S CONDITIONS OF SALE (AVAILABLE AT WWW.CONTECHES.COM/COS) FOR MORE INFORMATION. The product(s) described may be protected by one or more of the following US patents: 5,322,629; 5,624,576; 5,707,527; 5,759,415; 5,788,848; 5,985,157; 6,027,639; 6,350,374; 6,406,218; 6,641,720; 6,511,595; 6,649,048; 6,991,114; 6,998,038; 7,186,058; 7,296,692; 7,297,266; related foreign patents or other patents pending. 800-338-1122 www.ContechES.com cds_manual 3/17 PDF ENGINEERED SOLUTIONS ATTACHMENT D – Planting Plan APPENDIX E – Pollutant Controls During Construction Pollutant Controls During Construction 1 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA POLLUTANT CONTROLS DURING CONSTRUCTION 1.1 Structural Practices The following are the structural practices that will be implemented as part of the construction activity. • Sediment Silt Sock Barrier will be installed prior to commencement of construction. The silt sock will be used on the downgradient portions of the limit of work to allow water to flow through it while keeping sediment on site. The Town will be informed upon their installation so that they may inspect these barriers prior to construction. Portions of these barriers will be replaced and/or repaired as necessary. Barriers will be installed parallel to land slope at the perimeter of the work site, as shown on the Plans. Details are provided in the Plans. • Silt Sacks (or approved equivalent) will be installed at catch basins and following construction of the proposed overflow structures to prevent sedimentation during construction. The silt sack will be emptied/replaced and disposed of off-site if damage is observed. • Temporary Sediment Traps/Basins should be installed as needed during construction. All sediment traps/basins will be inspected at least once every seven calendar days and immediately after storm events by the Construction Manager. • Slope Stabilization will occur immediately upon obtaining final grades as shown on the project site plans. Runoff should be blocked from entering the paved flume/bioretention area until final stabilization has been achieved. Areas that fail to stabilize will be re-graded to final grade and stabilized as necessary. The amount of land disturbed will be minimized to reduce potential for erosion and sedimentation. Stabilization measures shall be initiated within 14 days following the end of construction at each portion of the site and as soon as practicable. The entire stormwater management system including pipes, structures, bioretention area, and infiltration trench, will be inspected upon completion of construction. Sediment will be removed from all elements of the stormwater management system. All control measures must be installed and maintained in accordance with manufacturer’s specifications, good engineering practices, and in accordance with this report (every seven calendar days and after storm events). If inspections show that a control has failed or been installed incorrectly, the Operator must replace or modify it within 24 hours. 1.2 Stabilization Practices The amount of land disturbed during construction will be minimized to reduce the potential for erosion and sedimentation. Prompt surface stabilization will be provided to control erosion in areas where disturbances cannot be avoided during construction. Stabilization measures shall be initiated within 14 days following the end of construction at each portion of the site. Exceptions to this requirement are Pollutant Controls During Construction 2 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA allowable when snow cover prevents the initiation of stabilization within 14 days, in which case such measures shall be undertaken as soon as possible. Stabilization measures that will be, or may be, used during construction are described below: • Temporary Seeding – Temporary seeding of disturbed surfaces with fast-growing grasses (annual rye) to provide greater resistance to stormwater runoff and/or wind erosion for areas where construction has temporarily ceased. • Permanent Seeding – Permanent seeding of surfaces with vegetation, including but not limited to grass, trees, bushes, and shrubs, to stabilize the soil. Establishing a permanent and sustainable ground cover at a site stabilizes the soil while reducing the sediment content in runoff. • Permanent Planting –establish all planting as required at the completion of the project. Bioretention area is to remain offline, blocked from road runoff at inflow, until permanent planting is established. • Erosion Control Blankets - install erosion control blankets along all slopes greater than 3:1. • Mulching – materials, including but not limited to hay, grass, woodchips, straw, and gravel will be placed on the soil surface to cover and hold in place disturbed soils. Temporary seeding or other soil stabilization measures will be provided where construction activities have ceased at the site. Topsoil stockpiles will be temporarily seeded or covered to prevent erosion and will be surrounded with silt fence or silt sock. When the site’s final grade has been established, permanent vegetation will be planted on the disturbed areas. The vegetation will consist of grass, shrubs, bushes, and trees in the locations indicated on the plans. 1.3 Other Types of Controls Additional controls/practices will be undertaken to reduce pollution in stormwater runoff flows which include, but are not limited to, control of off-site mud tracking from construction site, dust suppression, proper sanitary waste disposal, earthwork procedures timed and conducted in manners aimed to minimize erosion and sedimentation, snow removal plans, proper management of waste materials, proper management of hazardous waste, proper material stockpiling, and spill prevention and control measures. • Dust Suppression – Water sprays shall be used to control dust during extended dry periods during construction. • Earthwork – The exposure of disturbed surfaces to stormwater and potential stormwater erosion will be minimized by well-organized earthwork procedures. Stabilization procedures Pollutant Controls During Construction 3 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA shall be undertaken in accordance with this report. Grubbing during wet seasons will be avoided if feasible. • Snow Removal Plan – Plowed snow collected from the roadway and parking areas will be deposited onto free draining, pervious surfaces, away from the sites drainage conveyance structures to maximize infiltration. • Waste Materials – Dumpsters rented from a licensed solid waste management company will be used to store solid waste and debris that cannot be recycled, reused or salvaged. The dumpsters will meet all local and state solid waste management regulations. Dumpsters will be covered when refuse is not being directly deposited or withdrawn from them. Potentially hazardous wastes will be separated from normal wastes, including segregation of storage areas and proper labeling of containers. Removal of all waste from the site will be performed by licensed contractors in accordance with applicable regulatory requirements and disposed of at either local or regional approved facilities. Waste materials will not be buried on-site. All site personnel will be instructed regarding the correct procedures for waste disposal. Notices stating these procedures will be posted at the site. Solvents and flushing materials used during construction and pre-operational cleaning will be provided, handled, managed, and removed by the contractor for appropriate off-site disposal. • Hazardous Waste Materials – Any disposal of hazardous materials will be completed using the required paperwork. Copies will be provided to the Engineer and to the city. • Spill Prevention and Control Measures – To minimize the risk of spills or other accidental exposure of materials and substances to stormwater runoff, the following material management practices will be used throughout the project: o An effort will be made to store only enough products required to do the job. o All materials stored on-site will be stored in a neat, orderly manner in their appropriate containers and, if possible, under a roof or other enclosure. o Products will be kept in their original containers with the original manufacturer’s label. o Substances will not be mixed with one another unless recommended by the manufacturer. o Whenever possible, the maximum amount of a product will be used before disposing of the container. o Manufacturers’ recommendations for proper use and disposal will be followed. o The site superintendent will conduct daily inspections to ensure proper use and disposal of materials. Pollutant Controls During Construction 4 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA To reduce the risk associated with hazardous materials used on the site, the following practices will be used: - Products will be kept in original containers unless they are not resealable. - Original labels and material safety data sheets will be retained and kept on-site; they contain important product information. - If surplus product must be disposed of, manufacturers’ or local and state recommended methods for proper disposal will be followed. • Materials List - Materials or substances listed below are expected to be present on-site during construction: - Concrete - Fertilizers - Asphalt - Petroleum Based Products - Paints (enamel and latex) - Cleaning Solvents - Metal Studs - Wood - Concrete - Tar - Sealants - Adhesives The following product-specific practices will be followed on-site: Petroleum Products - All on-site vehicles will be monitored for leaks and receive preventative maintenance to reduce the chance of leakage. Petroleum products will be stored in tightly sealed containers which area clearly labeled. Any asphalt substances used on-site will be applied according to the manufacturers’ recommendations. Paints – All containers will be tightly sealed and stored indoors when not required for use. Excess paint will not be discharged to the storm sewer system but will be properly disposed of according to the manufacturers’ instructions or state and local regulations. Concrete Trucks – Concrete trucks will not be allowed to wash out or discharge surplus concrete or drum wash water on the site. In addition to the good housekeeping and material management practices discussed in the previous sections of this plan, the following practices will be followed for spill prevention and cleanup: • Manufacturers’ recommended methods for spill cleanup will be clearly posted, and site personnel will be made aware of the procedures and location of the information and cleanup supplies. Pollutant Controls During Construction 5 August 2024 Standish Way Stormwater Retrofit Project – Yarmouth, MA • Materials and equipment necessary for spill cleanup will be kept in the material storage area on-site. Equipment and materials will include, but not be limited to, brooms, dust pans, mops, rags, gloves, goggles, speedi-dry, sand, sawdust, and plastic and metal trash containers specifically for this purpose. • All spills will be cleaned up immediately after discovery. Spills large enough to reach the storm water system will be reported to the National Response Center at 1-800-424-8802. • The spill area will be kept well ventilated and personnel will wear appropriate protective clothing to prevent injury from contact with a hazardous substance. • Spills of toxic or hazardous material will be reported to the appropriate state or local government agency, regardless of the size. • The site superintendent responsible for the day-to-day site operations will be the spill prevention and clean-up coordinator. He will designate at least three other site personnel who will receive spill prevention and cleanup training. These individuals will each become responsible for a particular phase of prevention and cleanup. The names of responsible spill personnel will be posted in the material storage area and in the on-site office trailer. APPENDIX F – Site Plans