HomeMy WebLinkAboutFoundation Design - PE 6/18/24 DWD ENGINEERING, INC.
5 MICHAEL ROAD EAST BRIDGEWATER,MA 02333
(508)378-9602
domdean@aol.com
June 18,2024
Mr.Mark Grylls-Building Commissioner
I QVVI I of Y a1 mputh Guiding Department
1146 Route 28
South Yarmouth,MA 02664
RE: Foundation Design-Gill Residence
206 South Street-Yarmouth,MA
Dear Mr.Grylls,
This letter is to confirm that this office designed the foundation as shown on the drawings prepared by BF
Architects.It is my professional opinion that the foundation is structurally sound and that no modifications are required.If
you have any questions concerning this letter or if I can be of further assistance,please do not hesitate to contact me.
Si Q-rety .r`4/
�ZH OF M.i,
it..alh�h
P "°'n$TRUCTURAL C
Cc: Bill Fornaciari Architects No.35062
983, FGISTsc&.. '
►9SS/VNAL EN /t
RECEIVED
JUN 2 41014
BUILDING DEPARTMENT
By: