HomeMy WebLinkAboutBLD-23-001004 FCTOWN OF YARMOUTH Building Department
(508) 398-2231 ext.1261
PERMIT NO
ISSUE DATE
APPLICANT
BLD-23-001004
09/06/2022
cathy bedard
e-ntI)Pd <4-7.22
BUILDING
PERMIT
JOB WEATHER CARD
PERMIT TO Repair
AT (LOCATION) 58 GLEASON AVE, WEST YARMOUTH, MA 02673 ZONING DISTRICT Bldg. Type: Residential
SUBDIVISION MAP BLOCK LOT 037.57 BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS INSTALL 5 REPLACEMENT WINDOWS. NO STRUCTURAL WORK. CONTRACTOR
LICENSE 090758
Construction Supervisor
Manuel Vasconcelos
74 Hoyt Ave
AREA (SQ FT) 1,195,417,08 EST COST($) 6644.00 PERMIT FEE ($) 50.00 Lowell, MA 01852
OWNER ROBERT HYATT BUILDING DEPT BY
ADDRESS ALICE HYATT-HAWBAKER, 10260 SHIVES LN
ORRSTOWN PA 17244 [�d_d PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEW K OR ANY PART THEREOF, EITHER TEMPORARILY OR
FERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUS"r BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL
APPROVED PLANS MUST BE RETAINED ON
WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1) FOUNDATIONS OR
JOB AND THIS CARD KEPT POSTED UNTIL.
PERMITS ARE REQUIRED FOR
FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL
FINAL INSPECTION HAS BEEN MADE. WHERE:
ELECTRICAL PLUMBING/GAS
MEMBERS (READY FOR LATH OR FINISH COVERING)
A CERTIFICATE OF OCCUPANCY IS
AND MECHANICAL
3) FINAL INSPECTION BEFORE OCCUPANCY 4)
REQUIRED, SUCH BUILDING SHALL NOT BE
INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE
OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
_
BUILDING INSPECTIONS APPROVALS
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
L;N1IL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED'iHE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTP.UCTL )N AF�nvF