Loading...
HomeMy WebLinkAboutBLD-23-001517 FCTOWN OF YARMOUTH PERMIT NO ISSUE DATE APPLICANT BLD-23-001517 09/30/2022 Angelica Digenis CF-) mxy/zz Building Department BUILDING (508) 398-2231 ext.1261 PERMIT JOB WEATHER CARD' PERMIT TO Repair AT (LOCATION) 228 SOUTH SEA AVE, WEST YARMOUTH, MA 02 ZONING DISTRICT Bldg. Type: Residential SUBDIVISION MAP BLOCK LOT 017.167 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS Will be replacing all 16 windows on the home, which are original to the home CONTRACTOR and in poor condition (leaking, etc). LICENSE AREA (SQ FT) 607,182,840. EST COST($) 19306.00 PERMIT FEE ($) 50.00 OWNER ANGELICA L DEGENIS 2022 REV TRUST BUILDING DEPT BY ADDRESS .5 PARMENTER RD SUDBURY MA 01776-1270 r�/4� /y //,/ PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK- OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1) FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNl IL PERMITS ARE REQUIRED FOR FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. WHERE ELECTRICAL PLUMBING/GAS MEMBERS (READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3) FINAL. INSPECTION BEFORE OCCUPANCY 4) REQUIRED, SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL_ FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARID/F