Loading...
HomeMy WebLinkAboutBLD-23-001508 FCOE 10 131Z,2 TOWN OF YARMOUTH Building Department BUILDING +�0 (508) 398-2231 ext.1261 Qr�y PERMIT PERMIT NO BLD-23-001508 ISSUE DATE 09/30/2022 JOB WEATHER CARD APPLICANT DEAN C FRASER PERMIT TO Repair AT (LOCATION) 20 FREEMAN RD, YARMOUTH, MA 02675 ZONING DISTRICT Bldg. Type: Residential SUBDIVISION MAP BLOCK LOT 106.91 BUILDING IS TO BE: CONST TYPE REMARKS strip and reroof 23 sq of roof with Landmark Pro shingles in "Cobblestone gray" - OKH approval 9/23/22 USE GROUP LICENSE CONTRACTOR AREA (SQ FT) 455,376,240. EST COST($) 15995.00 PERMIT FEE ($) 50.00 OWNER DEBORAH S VOGT TRS BUILDING DEPT BY ADDRESS DEBORAH S VOGT TRUST, 20 FREEMAN RO YARMOUTH PORT MA 02675 )54,4 << A�r f���rCF'H0NE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWAL OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1) FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. WHERE ELECTRICAL PLUMBING/GAS MEMBERS (READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3) FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED, SUCH BUILDING SHALL NOT BE INSTALLATIONS. [REFER TO CETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS WORK SHALL NOT PROGEI=-D PERMIT WILL BECOME NULL AND VOID IF INPPECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR H4S CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONIC APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION aRCivF