Loading...
HomeMy WebLinkAboutfinal affidavit 11/7/24 Efficiency Energized. RISE 11/7/2024 Town of Yarmouth Building Department 1146 Route 28 South Yarmouth, MA 02664 RE: Insulation Permit BLDX-23-3530 Good afternoon, The MassSave subcontractor that pulled the permit for the weatherization work at 36 Clinton Drive in Yarmouthport, is no longer in business and is no longer participating in the MassSave program.This customer, Anna Cannon, reached out to inform us the permit is still open.The basement insulation on the permit was inspected by a certified Building Performance Institute (BPI) representative. The measures implemented were observed to meet local and state requirements. Thank you, Tic 4Ke- 1a Dan Ancahas QA/QC Supervisor,The RISE Group Inc. 765 Attucks Lane Hyannis, MA 02601 508-568-1926 x6621 Program RISE Engineering cic-HEs Installation RISE A division of Thielsch Engineering Client# Receipt 765 Attacks Lane,Hyannis,MA 02601 337525 508-568-1926 X-6609 FAX 508-5684933 Work Order 26103 Page 1 Contractor: 0041 McCarthy Construction Contract Date Start Date Address: PO Box 52 West Dennis,MA 02670 3/24/2022 *"'utr5 •jrt Primary Anna Cannon Phone: Alt.Phone: Auditor Service 36 Clinton Drive Donald Bok Yarmouthport,MA 02675 Home Phone: (781)706-9558 Work Cell Phone: Email(s):afc64@hotmaii.com AIR SEALING: Performed 2-- working-hours of air sealing. Including: Blower Door Test Combustion Safety Test Combustion Safety&Blower Door Test M Final CFM50: (1•1 `� c` BASEMENT CEILING: Install(1240)square feet of R-30 faced fiberglass insulation. I agree to all changes listed above and understand there might be an increase In my co-payment for which I will be responsible for paying. I also confirm the measures have been completed to my satisfaction and have received a Certificate of Completion. I understand this does not void any warranties provided to me by the Contractor. RISE/CONTRACTOR SIGNATURE V CUSTOMFR SIGNATURE SIGN DATE SIGH DAT 4/1/2022 11:10:48 AM