Loading...
HomeMy WebLinkAboutsolar install letterProject Title: Date: Permit No. Leoni d Klebanov 7 /27 /2022 Property Address: 31 rcehouse Rd, Yarmouth, MA 02664 Projecfi Check (x) one or both as applicable: frL,D -JJ- 0o?qo5 Newconstruction ExistingConstruction A.Final Construction Control Document To be submitted at completion of construction by a Registered Design. Prof essional for work per the nitth eilition of the Massachusetts State Building Coile, 780 CMR, Section X Project description: Andrew Bre i te r-tvuI MA Registration Number: Expiration date: , am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications conceming: Architectual Fire Protection Structural x Electrical x Mechanical Other: Describe for the above named project. I, or my designee, have performed the necessary professional services and was present at the construction site on a regular and periodic basis. To the best of my knowledge, information, and belief the work proceeded in accordance with the requirements of 780 CMR and the design documents approved as part of the building permit and that I or my designee: 1. Have reviewe4 for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the constmction documents.2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable.3. Have been present at intervals appropriate to the staSe of construction to become generally familiar with the progress and quality of the work and to determine if the work was performed in a manner consistent with the conskuction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107 Enter in the space to the right a "wet" or electronic signature and seal: fiwl,rul Lrrntv-Ulw phonenumber: 6L7-314-5785 Email: andrewGbreiterplan€t.com Building Official Name Permit No Building Olficial Use Only Date: Elec+riL lEeck L g I tlLL JUL 2? 2022 fDING DEPARTMENTBIJ I RECE iveo Version 0l 0l 2018