Loading...
HomeMy WebLinkAboutBLD-23-001383 FCTOWN OF YARMOUTH Building Department (508) 398-2231 ext.1261 PERMIT NO ISSUE DATE APPLICANT BLD-23-001383 09/30/2022 cathy bedard �b13)Z,Z. BUILDING PERMIT JOB WEATHER CARD PERMIT TO Repair AT (LOCATION) 94 CAPT CHASE RD, SOUTH YARMOUTH, MA 02 ZONING DISTRICT Bldg. Type: Residential SUBDIVISION MAP BLOCK LOT 078.56 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS INSTALL 3 REPLACEMENT WINDOWS. NO STRUCTURAL WORK. CONTRACTOR LICENSE ma Construction Supervisor Newpro Jeff Connors AREA (SO FT) 531,301,320. EST COST($) 8735.00 PERMIT FEE ($) 50.00 26 Cedar St, Woburn, MA 01801 OWNER ANDRA & STEPHEN REEVES BUILDING DEPT BY ADDRESS 27897 ARROWHEAD CIR PUNTA GORDA FL 33982 1.5�&W la jf `/)W PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE .APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OFTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1) FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. WHERE ELECTRICAL PLUMBING/GAS ,MEMBERS (READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3) FiNAI_ INSPECTION BEFORE OCCUPANCY 4) REQUIRED, SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPPECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE �.PPROVED THE VARIOUS MCNTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARQ\/F