HomeMy WebLinkAboutBLD-23-001425 FCTOWN OF YARMOUTH Building Department BUILDING
(508) 398-2231 ext.1261
PERMIT NO BLD-23-001425 PERMIT
ISSUE DATE 09/29/2022 JOB WEATHER CARD
APPLICANT Marcelo Cesar Da Silva PERMIT TO Repair
AT (LOCATION) 30 &32 ANCHORAGE LN, WEST YARMOUTH, MA ZONING DISTRICT Bldg. Type: Residential
SUBDIVISION MAP BLOCK LOT 017.143 BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS Replace two double hung picture window to 3 double hung windows.
AREA (SQ FT) 702,056,520. EST COST($) 10160.00 PERMIT FEE ($) 50.00
OWNER JOHN & JEANNE KENNEDY
ADDRESS 204 ARSENAL ST, APT 459
BUILDING DEPT BY
CONTRACTOR
LICENSE 185469
Home Improvement
Minas General Svc & Management
Inc.
Marcelo Da Silva
6, Cody
FRAMINGHAM, MA, MA 01701
WATERTOWN MA 02472 fJ4 a X )ktAI Y ,PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK ' -OR ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL
APPROVED PLANS MUST BE RETAINED ON
WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1) FOUNDATIONS OR
JOB AND THIS CARD KEPT POSTED UNTIL
PERMITS ARE REQUIRED FOR
FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL
FINAL INSPECTION HAS BEEN MADE. WHERE
ELECTRICAL PLUMBING/GAS
MEMBERS (READY FOR LATH OR FINISH COVERING)
A CERTIFICATE OF OCCUPANCY IS
AND MECHANICAL
3) FINAL INSPECTION BEFORE OCCUPANCY 4)
REQUIRED, SUCH BUILDING SHALL NOT BE
INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE
OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR NfRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION ARn\/F