Loading...
HomeMy WebLinkAboutBLD-23-001275 FCTOWN OF YARMOUTH Building Department (508) 398-2231 ext.1261 PERMIT NO ISSUE DATE APPLICANT BLD-23.-001275 09/22/2022 anatoli sivitski e r A M itck g12�;lZL BUILDING PERMIT . JOB WEATHER CARD PERMIT TO Repair AT (LOCATION) 27 &29 BOXBERRY LN, WEST YARMOUTH, MA 0 ZONING DISTRICT Bldg. Type: Residential SUBDIVISION MAP BLOCK LOT 039.155 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS re -shingle roof CONTRACTOR LICENSE 106040 Construction Supervisor Anatoli Sivitski 27 mill pond rd AREA (SQ FT) 379,494,720. EST COST($) 13300.00 PERMIT FEE ($) 50.00 West yarmouth, MA 02673 OWNER DAVID & SANDRA PRIMROSE BUILDING DEPT BY ADDRESS .5 SANDY SHORE WAY HARWICH MA 02645 1'3�d d /0(&, IW PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE '_ ONSTRUCTION WORK: 1) FCUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED FOR FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. WHERE ELECTRICAL PLUMBING/GAS MEMBERS (READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3) FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED, SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TO DETAILED INSPECTION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. _ POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS WORK St -'ALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF IN?SECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR. HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION ARQ\/F