HomeMy WebLinkAboutBLD-23-001275 FCTOWN OF YARMOUTH Building Department
(508) 398-2231 ext.1261
PERMIT NO
ISSUE DATE
APPLICANT
BLD-23.-001275
09/22/2022
anatoli sivitski
e r A M itck g12�;lZL
BUILDING
PERMIT .
JOB WEATHER CARD
PERMIT TO Repair
AT (LOCATION) 27 &29 BOXBERRY LN, WEST YARMOUTH, MA 0 ZONING DISTRICT Bldg. Type: Residential
SUBDIVISION MAP BLOCK LOT 039.155 BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS re -shingle roof CONTRACTOR
LICENSE 106040
Construction Supervisor
Anatoli Sivitski
27 mill pond rd
AREA (SQ FT) 379,494,720. EST COST($) 13300.00 PERMIT FEE ($) 50.00 West yarmouth, MA 02673
OWNER DAVID & SANDRA PRIMROSE
BUILDING DEPT BY
ADDRESS .5 SANDY SHORE WAY
HARWICH MA 02645 1'3�d d /0(&, IW PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL
APPROVED PLANS MUST BE RETAINED ON
WHERE APPLICABLE SEPARATE
'_ ONSTRUCTION WORK: 1) FCUNDATIONS OR
JOB AND THIS CARD KEPT POSTED UNTIL
PERMITS ARE REQUIRED FOR
FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL
FINAL INSPECTION HAS BEEN MADE. WHERE
ELECTRICAL PLUMBING/GAS
MEMBERS (READY FOR LATH OR FINISH COVERING)
A CERTIFICATE OF OCCUPANCY IS
AND MECHANICAL
3) FINAL INSPECTION BEFORE OCCUPANCY 4)
REQUIRED, SUCH BUILDING SHALL NOT BE
INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE
OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
_ POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
WORK St -'ALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF IN?SECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR. HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION ARQ\/F