HomeMy WebLinkAboutBLD-23-001369 FCTOWN OF YARMOUTH Building Department
(508) 398-2231 ext.1261
PERMIT NO
ISSUE DATE
APPLICANT
BLD-23-001369
09/22/2022
Russell Cazeault
BUILDING
PERMIT
JOB WEATHER CARD
PERMIT TO - Repair
AT (LOCATION) 579 BUCK ISLAND RD, WEST YARMOUTH, MA 02 ZONING DISTRICT Bldg. Type: Commercial
SUBDIVISION MAP BLOCK LOT 045.78.1 BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS Replacing existing Flat roof on the nursing center section C, E, F with EDPM CONTRACTOR
rubber roofing system for section F. Replacing both flat roof and asphalt roof LICENSE CS-108157
for section C and E. Construction Supervisor
Paul J Cazeault & Sons
Russell Cazeault
AREA (SQ FT) 752007,140,1 EST COST($) 7800.00 PERMIT FEE ($) 90.00 1031, Main Street
Osterville, MA 02655
OWNER TURINO ASSOCIATES LLC BUILDING DEPT BY
ADDRESS C/O OMEGA HEALTHCARE INVESTORS, 303
HUNT VALLEY MD 21030�� JM�I�,(,�1�/�/PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK R ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL
APPROVED PLANS MUST BE RETAINED ON
WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1) FOUNDATIONS OR
JOB AND THIS CARD KEPT POSTED UNTIL
PERMITS ARE REQUIRED FOR
FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL
FINAL INSPECTION HAS BEEN MADE. WHERE
ELECTRICAL PLUMBING/GAS
MEMBERS (READY FOR LATH OR FINISH COVERING)
A CERTIFICATE OF OCCUPANCY IS
AND MECHANICAL
3) FINAL INSPECTION BEFORE OCCUPANCY 4)
REQUIRED, SUCH BUILDING SHALL NOT BE
INSTALLATIONS.
REFER TO DETAILED IN36ECTION SCHEDULE
OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NO-i STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE_ THE PERMIT IS ISSUED AS NOTED I
OR WP.ITTEN NOTIFICATION.
STAGES OF CONSTRUCTION ARM/F