HomeMy WebLinkAboutBLD-23-001251 FCTOWN OF YARMOUTH Building Department
(508) 398-2231 ext.1261
PERMIT NO
ISSUE DATE
APPLICANT
BLD-23-601251
09/22/2022
Russell Cazeault
P ` 1 Zc31 zL1
BUILDING
PERMIT
JOB WEATHER CARD
PERMIT TO Repair
AT (LOCATION) 30 WINDEMERE RD, WEST YARMOUTH, MA 026 ZONING DISTRICT Bldg. Type: Residential
SUBDIVISIONWAP BLOCK LOT 021.36 BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS Replacing the sidewall on the right side of the home under the deck only.
CONTRACTOR
Replacing with white cedar shingles. LICENSE CS-108157
Construction Supervisor
Paul J Cazeault & Sons
Russell Cazeault
1031, Main Street
AREA (SO FT) 436,427,640. EST COST($) 4800,00 PERMIT FEE ($) 50.00 1031,OsterMain
ille, St eet
02655
OWNER MARY L WHELAN
BUILDING DEPT BY
ADDRESS 3757 S ATLANTIC AVE, UNIT 1704
DAYTJNA BEACH FL 32118-7253 ` / /,// PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY 1 He JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL
APPROVED PLANS MUST BE RETAINED ON
WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1) FOUNDATIONS OR
JOB AND THIS CARD KEPT POSTED UNTIL
PERMITS ARE REQUIRED; UR
FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL
FINAL INSPECTION HAS BEEN MADE. WHERE
ELECTRICAL PLUMBING/GAS
MEMBERS (READY FOR LATH OR FINISH COVERING)
A CERTIFICATE OF OCCUPANCY IS
AND MECHANICAL
3) FINAL INSPECTION BEFORE OCCUPANCY 4)
REQUIRED, SUCH BUILDING SHALL NOT BE
INSTALLATIONS.
REFER TC DETAILED INSPECI-ION SCHEDULE
OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
_ POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
I
I
II
OTHER:
WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOP: BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STAGES OF CONSTRUCTION 4RQVF