Loading...
HomeMy WebLinkAboutBLD-23-001251 FCTOWN OF YARMOUTH Building Department (508) 398-2231 ext.1261 PERMIT NO ISSUE DATE APPLICANT BLD-23-601251 09/22/2022 Russell Cazeault P ` 1 Zc31 zL1 BUILDING PERMIT JOB WEATHER CARD PERMIT TO Repair AT (LOCATION) 30 WINDEMERE RD, WEST YARMOUTH, MA 026 ZONING DISTRICT Bldg. Type: Residential SUBDIVISIONWAP BLOCK LOT 021.36 BUILDING IS TO BE: CONST TYPE USE GROUP REMARKS Replacing the sidewall on the right side of the home under the deck only. CONTRACTOR Replacing with white cedar shingles. LICENSE CS-108157 Construction Supervisor Paul J Cazeault & Sons Russell Cazeault 1031, Main Street AREA (SO FT) 436,427,640. EST COST($) 4800,00 PERMIT FEE ($) 50.00 1031,OsterMain ille, St eet 02655 OWNER MARY L WHELAN BUILDING DEPT BY ADDRESS 3757 S ATLANTIC AVE, UNIT 1704 DAYTJNA BEACH FL 32118-7253 ` / /,// PHONE THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALK OR ANY PART THEREOF, EITHER TEMPORARILY OR PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE APPROVED BY 1 He JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM MINIMUM INSPECTIONS REQUIRED FOR ALL APPROVED PLANS MUST BE RETAINED ON WHERE APPLICABLE SEPARATE CONSTRUCTION WORK: 1) FOUNDATIONS OR JOB AND THIS CARD KEPT POSTED UNTIL PERMITS ARE REQUIRED; UR FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL FINAL INSPECTION HAS BEEN MADE. WHERE ELECTRICAL PLUMBING/GAS MEMBERS (READY FOR LATH OR FINISH COVERING) A CERTIFICATE OF OCCUPANCY IS AND MECHANICAL 3) FINAL INSPECTION BEFORE OCCUPANCY 4) REQUIRED, SUCH BUILDING SHALL NOT BE INSTALLATIONS. REFER TC DETAILED INSPECI-ION SCHEDULE OCCUPIED UNTIL FINAL INSPECTION HAS BEEN MADE. _ POST THIS CARD SO IT IS VISIBLE FROM STREET BUILDING INSPECTIONS APPROVALS I I II OTHER: WORK SHALL NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS INDICATED ON THIS CARD UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOP: BY TELEPHONE APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION. STAGES OF CONSTRUCTION 4RQVF