HomeMy WebLinkAboutBLD-23-001352 FCTOWN OF YARMOUTH Building Department
(508) 398-2231 ext.1261
PERMIT NO
ISSUE DATE
APPLICANT
BLD-23-001352
09/22/2022
Karen L Emond
T 9l z3/?2
BUILDING
PERMIT
JOB WEATHER CARD
PERMIT TO Repair
AT. (LOCATION) 44 TURTLE COVE RD, SOUTH YARMOUTH, MA 0 ZONING DISTRICT Bldg. Type: Residential
SUBDIVISION MAP BLOCK LOT 059.122 BUILDING IS TO BE: CONST TYPE USE GROUP
REMARKS Home Air Sealing, insulate attic, insulate basement sills, crawlspace with rigid
CONTRACTOR
board, ventilation chutes LICENSE
-.REA (SQ FT) 1,005,669,72 EST COST($) 4179.37 PERMIT FEE ($) 35.00
OWNER BRENDAN & VONNIE OSHEA
BUILDING DEPT BY
ADDRESS .8 RIDGE RD
SLINGERLANDS NY 12159 lg4a,,( PHONE
THIS PERMIT CONVEYS NO RIGHT TO OCCUPY ANY STREET, ALLEY OR SIDEWALX OR ANY PART THEREOF, EITHER TEMPORARILY OR
PERMANENTLY. ENCROACHMENTS ON PUBLIC PROPERTY, NOT SPECIFICALLY PERMITTED UNDER THE BUILDING CODE, MUST BE
APPROVED BY THE JURISDICTION. STREET OR ALLEY GRADES AS WELL AS DEPTH AND LOCATION OF PUBLIC SEWERS MAY BE
OBTAINED FROM THE DEPARTMENT OF PUBLIC WORKS. THE ISSUANCE OF THIS PERMIT DOES NOT RELEASE THE APPLICANT FROM
MINIMUM INSPECTIONS REQUIRED FOR ALL
APPROVED PLANS MUST BE RETAINED ON
WHERE APPLICABLE SEPARATE
CONSTRUCTION WORK: 1) FOUNDATIONS OR
JOB AND THIS CARD KEPT POSTED UNTIL
PERMITS ARE REQUIRED FOR
FOOTINGS. 2) PRIOR TO COVERING STRUCTURAL
FINAL INSPECTION HAS BEEN MADE. WHERE
ELECTRICAL PLUMBING/GAS
.MEMBERS (READY FOR LATH OR FINISH COVERING)
A CERTIFICATE OF OCCUPANCY IS
AND MECHANICAL
3) FINAL INSPECTION BEFORE OCCUPANCY 4)
REQUIRED, SUCH BUILDING SHALL NOT BE
INSTALLATIONS.
REFER TO DETAILED INSPECTION SCHEDULE
OCCUPIED UNTIL FINAL INSPECTION HAS
BEEN MADE.
POST THIS CARD SO IT IS VISIBLE FROM STREET
BUILDING INSPECTIONS APPROVALS
WORK SHALT_ NOT PROCEED PERMIT WILL BECOME NULL AND VOID IF INPSECTIONS !NDICATED ON THIS CARD
UNTIL THE INSPECTOR HAS CONSTRUCTION WORK IS NOT STARTED WITHIN SIX CAN BE ARRANGED FOR BY TELEPHONE
APPROVED THE VARIOUS MONTHS OF DATE THE PERMIT IS ISSUED AS NOTED OR WRITTEN NOTIFICATION.
STASES OF CONSTRUCTION ARn\/F