Loading...
HomeMy WebLinkAbout60 Grandview Dr float pier site planCOMPOSITE PILE NOTES _ �xy _ 1. ALL COMPOSITE FOUNDATION PILES SHALL BE PIERSON PILINGS r ; 2. BEFORE ANY PILES ARE DRIVEN, A CERTIFICATION SHALL BE J SUBMITTED CERTIFYING THAT THE PILES WERE FREE OF NON —APPROVED '� xQ y4.r'�� as' f 46 CHEMICALS AND APPROVED BY THE CONSERVATION COMMISSION. 345 ao. r '� x, Si'` 3. PILES SHALL BE 800 PSI MINIMUM COMPRESSIVE STRENGTH PARALLEL 4 .: � is �� >' 44V� TO CLOTH AND SHALL MEASURE AT LEAST EIGHT INCHES 10 AND 12"'IN �., ��'' t, 4 ss # 1 r __ DIAMETER AT THE TIP. , 4. EACH PILE SHALL BE INSTALLED BY MECHANICAL MEANS, IN ONE PIECE, �i+ WITHOUT SPLICING, AND SHALL BE DRIVEN TO THE DEPTHS SPECIFIED IN 13 . 4140 } ' SECTIONS A—C OR REFUSAL. ENGINEER SHALL BE N011FIED IF REQUIRED ;'' ' , 144 r DEPTH CAN NOT BE ATTAINED. 5. DURING THE PILE DRIVING OPERATION, ANY SUDDEN DECREASE IN Lfiti x DRIVING RESISTANCE SHALL BE INVESTIGATED WITH REGARD TO 1NE POSSIBILITY OF BREAKAGE OF THE PILE, AND IF SUCH SUDDEN DECREASE e4 n IN DRIVING RESISTANCE CANNOT BE CORRELATED TO BORING DATA, AND '1 LOCUS IF THE PILE CANNOT BE REMOVED FOR INSPECTION, IT SHALL BE CONSIDERED ADEQUATE REASON FOR THE REJECTION OF THE PILE. 6. JETTING, AUGURING AND OTHER METHODS OF PRE —EXCAVATION TO ACHIEVE THE MINIMUM TIP ELEVATION ARE PERMITTED WITHOUT KEY MAP PRIOR APPROVAL BY THE ENGINEER. WHERE PERMITTED, THE NO SCALE PRE —EXCAVATION MUST BE CARRIED OUT IN A MANNER WHICH WILL NOT IMPAIR THE CARRYING CAPACITY OF THE PILES ALREADY IN PLACE. IMMEDIATELY AFTER COMPLETION OF JETTING OR AUGURING, THE PILE PLAN REFERENCES: SHALL BE ADVANCED TO THE MAXIMUM DEPTH OF PRE —EXCAVATION AND DRIVEN BELOW THIS DEPTH TO THE REQUIRED DEPTH SPECIFIED HEREIN. LC CERTIFICATE C2290620 PLAN BOOK 303, PG 88 7. THE PILE DRIVING CONTRACTOR SHALL KEEP AND SUBMIT A FILE LAND PLAN 17002E SHT 1 DRIVING LOG FOR EACH PILE. LICENSE BOOK 167 PG.14 LICENSE PLAN BOOK 167 PG. 14 DA TUM NOTE: SHELLFISH SURVEY PLOT SAMPLING RESULTS- 60 GRANDVIEW SO YARMOUTH TRANSECT# PLOT# A B C D E 80, 0 CH 6Q LN SIQ 3LN 3CH 1Q LN Q 70' Q LN SNACK 0 Q 2CH 2Q 2Q 2CH 60' 7QCH 60, 2CH 0 0 2LN 2CH 50' 3Q 0 CH Q 2Q 30. 40' 2Q CH 4Q Q LN CH 2QCH 0 30' 20. LN SEED 4Q SEED Q 2Q LN 0 20' 2CH 2Q 4Q CH SEED 6Q CH 21-N 2LN 2CH 2LN CH 10, STONES STONES STONES STONES STONES KEY OY = OYSTER SHACK= DEAD SHELL CH = CHERRYSTONE Q= QUAHOG LN = LITTLENECK SEED = QUAHOG SEEDLING (<1") SHELLFISH SURVEY ELEVATIONS SHOWN HEREON ARE BASED ON NAVD88 MLW =-1.1' NAVD88=0.0' MHW = 1.8' HTL = 2.8' FLOOD NOTE: YARMOUTH. MA FLOOD ZONE AE 11 NAVD88 AS SHOWN ON FEMA EFFECTIVE DATE: JULY 6, 2014 PANEL NUMBER 25001CO591J PANEL #591— 875 4' -2x6 HANDRAILS ROUT EDGES — 2x4 — 2x4 SIDE RAILS W 4x4 POSTS (TYP) 3/8"0 THRU BOL 13 2x6 DECKING (EA 'WEST ORIENTATION 2 — 2x10 STRINGERS / (EACH SIDE) W/2 — 5/8"0 THRU BOLTS POST CONNECTOR 8x8 BEAM 2— 3/4"0 BOLTS ALUMINUM BRACKET SEE DETAIL 0 Z 12"0 x 20' COMPOSITE PILE i \ 1 EXISTING 40' 70 70 GRADE 80 PROPOSED ACCESS FROM LAND SUBJECT TOO CSF ---E D —4 _ PLAN VIEW SCALE: 1 "= 20' I TO GROUND OUT) cn DISTANCE TO CHANNEL =535' KELLEYS BAY LANDCONTAINING SHELLFISH Dow COASTAL BEACH LAND UNDER OCEAN i COASTAL BANK � � I I I � I I i I _ PROPOSED STRUCTURES FROM MHW TO END = 80' 1 � I I MHW MLW EXISTING STAIRS TO BE PROPOSED 52' X 4' REPLACED _\ �� /—PIER ELEV. 7.0 MLW 9- 7 3 —3 —5 10 0 10 2 PROPOSED 10" DIAM. PILES 15 FEET LONG 0 30 40 LAND CONTAINING PROPOSED 12" SHELLFISH DIAM. PILES 16' OC 20 FEET LONG SECTION A SCALE: 1 "= 10' PROPOSED 3' X 20' RAMP PROPOSED 2 10" PILINGS AT TERMINATION OF PIER PROPOSED 10' X 20' FLOAT 9 7 5 MHW 3 — —3 ---- —5 80 EXISTING GRADE WA L K WA Y SEC TI ON NOT TO SCALE REVISIONS: No. DATE GENERAL_ NOTES: GENERAL NOTES: 1. SUPPLY ALL MATERIAL, EQUIPMENT AND LABOR FOR CONSTRUCTION OF PERMANENT PIER AND FLOAT AS DESCRIBED AND SHOWN ON PLAN AND DETAILS. 2. ALL WORK TO BE PERFORMED IN ACCORDANCE WITH THE PLANS, SPECIFICATIONS AND THE ORDER OF CONDITIONS ISSUED BY THE HYARMOUTH CONSERVATION COMMISSION. 3. ACCESS TO BE FROM THE PATH ON THE APPLICANT'S PROPERTY, OR FROM WORKING BARGE. WORKING BARGE NOT TO BE LOCATED OVER MARSH AT ANY TIME. STAGING AREA FOR MATERIALS TO BE IN THE APPLICANT'S DRIVEWAY. 4. METAL TO BE HOT DIPPED GALVANIZED AFTER FABRICATION. ALL TIMBER IN CONTACT WITH GROUND AND UNDER WATER TO BE NON ACQ OR CCA PRESSURE TREATED 5. NO HEAVY MACHINERY OR EQUIPMENT TO OPERATE IN THE MARSH. 6. CONSTRUCTION DETAILS TO BE APPROVED BY ENGINEER PRIOR TO CONSTRUCTION. 8. DISTURBED AREAS TO BE REVEGETATED TO MATCH PRE —CONSTRUCTION CONDITIONS. 10. MINIMUM SPACE BETWEEN ALL DECK PLANKING TO BE 3/4", WITH PLANKING ORIENTED NORTH —SOUTH. ENGINEER: WRS ENGINEERING LLC ROY OKUROWSKI 67 STETSON ST. HYANNIS, MA 02601 TI TL_E: 60 Grand View Drive Yarmouth, MA Proposed Pier and Float Permitting Plan PREPARED • 2- 4x4 POSTS FOR RAILING SUPPORT 8x8 BEAM 2x6 HANDRAILS LEGEND ROUT EDGES Aldo o Ruscito II II II II II II II II II II EXISTING 60 Grand View Dr. illl/ o BOUND Yarmouth, MA 02673 II II II II II II II II y 12"0 x 20' PERMANENT PILE ROCK REVETMEN II II II II II II II } 2x6 DECKING (EAST/ LIMIT OF WORK II II II II II II II WEST ORIENTATION II II II II it II II� BOARD SPACING 1" MIN) T8-2 II II II II II it III 1;� TEST BORING DATE: 04-22-2024 2 - 200 STRINGERS MOORING COMP./DESIGN: ROY OKUROWSKI P.E. (EACH SIDE) W/2 - 3S-4"SECO,TYMAL 5/8"0 THRU BOLTS ® CHECK: REO POST CONNECTOR --10 CONTOUR DRAWN: REO x-3.4 SPOT GRADE SCALE: 1 "=20' HOR JOB NO.: 60 Grand View Drive PIER PLAN VIEW DETAIL NOT TO SCALE 1 OF 1 20 10 0 20 40 0� /0 V �&C �/ 4� 0 G12'�6 V16-�J 6 /2 7/). y,