SITE PLAN REVIEW COMMENT SHEET
Date: 12/3/2024 Map: 36 Lots: 77, 78 & 79
Applicant: Becker's Liquor Store
Location: 49 & 55 Route 28 and 10 Drew's Way Zone: B2 and APD
Persons Present:
Kathy Williams Dominic Lyon
Conor Clifford Muhammad Hamid
Barry Lewis Mark Hellwig
Lt. Matt Bearse Mark Grylls
Mark Gelsomino Laurie Ruszala
Oscar Ramirez
Project Summary
Proposed building addition to the existing Becker's Package Store. Proposed addition to first floor retail of approx. 4139
sf for a total area of 5,074 sf. A second floor is proposed for two (2), two-bedroom residential units. The total area of the
residential use is 2,683 sf. Site work includes redesign/expansion of the parking area, landscaping and utilities.
Comments
iV Building: Use is allowed by SP from the Planning Board. This is not an applicable HMOD 1 project. The ROAD bylaw
section is not necessary for this development.
Lots may be combined as allowed by Zoning Bylaw section 104.3.5#5 as an 81X perimeter plan and does not necessarily
require an A&R. Applicant will need to provide documentation of the 81X at the time of building permit application to the
Building Dept.
The current plan for structure does require relief from the ZBA per 104.3.2#3 for setback relief.
Drews Way is a right of way and is considered a front. Buffers proposed on Drews Way will be required to meet the front
buffer requirements of 301.4.4 or seek SP relief from the ZBA as allowed by section 301.2. The landscaping area in front
of the building should show potential plantings.
Plan shows a ramp meeting ADA standard. All accessible requirements moving forward shall reference and adhere to 521
CMR AAB.
Building separation from adjoining lot and building shall meet 780 CMR standards.
All construction to meet all other applicable 780 CMR code requirements.
,p7 Community Development & Planning: Mixed-use redevelopments along Route 28 have the benefit of retaining and
improving our commercial corridor while providing much needed housing in our community along a transit route. The
improvements/expansion to the existing building and modified site layout and parking will enhance the aesthetics of the
property along Route 28.
1. Zoning: The application narrative notes that the project would be allowed by-right in accordance with Zoning Bylaw
Section 404 (HMOD1). However, the project is not an "Applicable" Property in the HMOD1 as it is not nor has ever
been a motel/hotel, therefore the project cannot be developed under the HMOD1 overlay district. Although we had
talked about utilizing the ROAD overlay district as outlined in Section 411 during our September 17th Pre-Application
meeting, by combining all three lots into a single 98,406 square foot lot, the new lot is large enough to accommodate
a Duplex. Duplexes are allowed in the B2 via a Special Permit from the Planning Board with double the minimum lot
size (Duplexes are an allowed use in the APD). The benefit of the ROAD bylaw is that it turns a Variance into a
Special Permit if you adhere to the design standards. As the minimum lot size is being met for a Duplex, it does not
appear as though a Variance is needed. However, a Special Permit from the ZBA would also be needed per Section
104.3.2(3) and any portions of Section 301 which cannot be fully met. Under this scenario, the process would include:
a. Design Review Committee for advisory review of the project's compliance with the Architectural & Site Design
Standards. Include Building Elevations, material cut sheets, and detailed Landscaping Plan. Include in-lot
trees in the parking lot islands.
b. Planning Board Use Special Permit
c. Zoning Board of Appeals (ZBA) Special Permit for non-conforming structure and any Section 301 relief.
2. Corner Lot: With Drews Way and Route 28, the property would be considered a corner lot with two fronts and two
sides. Front yard setback for a corner lot in the B2 is 25'. A 20' vegetated buffer if required from both roadways, or
relief from the ZBA is needed.
3. Stormwater: Recommend utilizing underground infiltration chambers rather than a deep infiltration basin. If one acre
or more of land will be disturbed, need a Stormwater Management Permit from the Conservation Commission.
4. Water/Sewer: Coordinate with DPW on location of municipal sewer stub and provide for sewer service on site for
future connection; and coordinate location of new water service and sprinkler lines.
5. MassDOT Corridor Project: Attached is a Preliminary ROW Plan which shows taking of a narrow strip, but a larger
area for temporary easement to reconstruct the driveway aprons. Coordinate with MassDOT on curb cuts. The
project manager is Tom Currier at thomas.h.currierdot.state.ma.us Consider increasing the Route 28 buffer to 22' to
accommodate this small taking and still retaining the 20' buffer.
6. Utilities: It is unclear whether the utilities will be buried or not, preference is to bury overhead utilities.
7. 81X: Rather than going through the Planning Board for an ANR, it is possible to combine the properties via an 81X
perimeter plan.
Design Review: Applicant will need to go to the Design Review Committee.
Conservation: Not present
Engineering:
• General
o Provide emergency vehicle turning radius.
o Provide construction details.
-ate.- o Coordinate with MassDOT Streetscape Project projected for FY29.
o Parcel is located within Phase I- Contract 6 for Wastewater. Project will be in construction shortly
and online in 2027/2028. Coordinate sewer service location.
• Drainage
o Please provide drainage calculations including test holes to confirm groundwater elevation.
V" ire: Fire Department Access as per 527 CMR 1 Ch. 18, Sweep path analysis for Tower ladder truck may be needed. PIV
for sprinkler required if no direct access to sprinkler room. FDC to be determined by Fire Dept. as plans are submitted.
Fire Dept. key box required for building access.
14aIth:
A perc test will need to be done. Will there be any food production? If so what will be done, ie hot dogs, sandwiches,
soups etc.
Water:
. —The new domestic and fire services will need to connect to the existing 16-inch main in Route 28. The 8-inch main will be
abandoned as part of the sewer project. The sewer should be available in late 2027/early 2028.
Read & Received by Applicant(s)
ilk }Lk,-
/ N �� M r,%rc cL i�-ic - rr�v+r�ovvi oVo.r.l
'b 44&48 ROUTE 28,LLC
� ,* 21' / �j " AREA ABOUT 107 S.F. I
����e'f e•f �� 1977 SHLO 1933 SHLO
4WC PROP.SLOPEN0. 6237 NO. 2977
�3:------,— _5• i 5.* r.‘9.
LIMIT(TYP.)
- — (_"\10't J21_f _4'±e -.._.-
(RET.)� t_ (RET.) IGiv - PROP.GRAN.CURB I I
�* e — )
2' — e1't— 248't _
ir ."----- f 04 t
• s 20'f
11 ` '' 30't
2t
PROP.GRAN.CURB HBD. (R&R) 4, �=7:0-
183't R _ t� :
TYPE VB(TYP.) R&R UPL 37/14 -_-�} PROP.6'SW GUY R8R 7PC-3fl _ fEM.GUY _ -----
o__ M _ __ ::::::ji,--------:;17_1-;:1,2' ?,:,,,i,!;,;,;,;:i24;
t-7't 123 - AIN S-� (R8R) SAWCUT ---- -1-1
N0. 6215'i— —o-- EETUTE
4 REM.LSA �- 10 ( 28) R) -- � r;;• —�� �-=932ggSELIN�����r1_-O ��� I�� R&R UPL 37/16I (. .Npi �(R8R) ���_ - PROP.FULL DEPTH HMA ��
��13't -- TR�iON(?vP) ,2125 Sf
_ . 1933 SHLO NO. 2977 (R&R)
11Tf
(REM.)LDS* , 1 t �O�- :HEET 3;
24 t (RET.) my* (R&R)
RET. * ,'- �a�� REM.) '
n
LSA �- • - n
4 .t ,�O.t 2Z'�� irr `�-- 1�:t _�
PROP.HMA BERM, 1?� ��- 2'
IIPPIPP- 1�.* _'_
PROP.10.0'HMA SHARED USE 12 t �!i • ,
PATH(TYP.) 1 132't 8 I RET '•
�/
- PROP.FULL DEPTH HMA
, —19 MET.)
Q �/ iil' 12 DRIVEWAY(TYP.) It. �11 •111
PROP.AGED PINE BARK / �/ /4i PARCEL 13-134 (REM.) 13 t
MULCH(TYP.) it
v ROP SERVICE
HUZAFIA CORPORATIONcc
3'
Q / �/ "DREW., WY" AREA ABOUT 188 S.F. PROP.LOAM& CO :P NNCTION
/ PROP. HUZAFIA CORPORATION PROP.AGED PINE BARK/ SEED(TYP.) RET.
SERVICE BK/PG 33360/47 MULCH(TYP.) UlT2P /
PARCEL 13-TE-24 y CONNECTION /
/ 49 ROUTE 28 PROP.GRAN.CURB -
KISHOR K.PATEL MAP/LOT 36/78 TYPE VB(TYP.)AREA ABOUT 1,903 S.F. / / J o0
DIPTI LLC iii)
w H
PARCEL 13-TE-25 w
1895 SHLO 1933 SHLO Q� HUZAFIA CORPORATION PARCEL 13-124 Z
NO. 59 NO. 2977 AREA ABOUT 188 S.F. I LLc
AREA ABOUT 2,908 S.F. PARCEL 13-TE-27
AREA ABOUT 840 S.F. L
KISHOR K. PATELt------------...._
HUZAFIA CORPORATION