Loading...
HomeMy WebLinkAboutEngineer PlanC.B. FND. Yarmoo Te ..,� IDepartr�ent WOZ S 67D 45' $3. E C.B. FND. o lea ?ate UNIT /2 183.54' \\\ C.B. FN . ` S 67D 42' S1' B r. ' N� ExtSSeptic or RINSE 1 ti 1.83 for 901. 5 FOOT STRIPOUT ALL AROUND "Chamber STATON Note: Remove soil down to of. 7.50 & replace wt h EXISTING V s clean coarse sand w/perc. rate less than or i3 2 BEDROOM 3 NN or equal to 2 min./in. before d after placement 0 0 ` �} �tee00 Square root +� b 0 ENCLOSED t a mid s . I a 1 Ap. — — m UNIT J14 lit' �r.8 b o al co PROJECT BENCH MARK H-20 j SPINDLE ON HYDRANT #251 D—Box y \ ELEV. = 9.57 (NAV 88) m TEST HOLE j W 3 ' UNIT # fCh — ca PORT 2 ELEV 10*50.50 a VENT PIPE Note: COVER OVER SAS=ELEV. 12.75 / SEP 2 6 2024 U. o-------------------- I HEAL THDEP 17I�T ACC.H5.S ROAD — — ---- 1ss.0�� ------------- V — — — — — — — — 12' RIGHT OF WAY IN COMMON AREA / S 70D 50' 077=8 0 30 60 75 SCALE: 1 "=30' .THE PROPERTY LINES ARE APPROXIMATE AND COMPILED FROM THE SURVEY PLAN BY DOWN CAPE ENGINEERING ENTITLED: SITE PLAN OF UNIT #3 184 SOUTH SEA AVENUE, YARMOUTH DATED: JUNE 6, 1983 AND MASTER PLAN ON FILE of SOUTH SEA VILL AND IS NOT INTENDED TO BE A SURVEY PLOT PLAN IT SHOULD BE USED FOR NO PURPOSE OTHER THAN THE SEPTIC SYSTEM INSTALLATION. EXISTING SAS/LEACH PIT TO BE PUMPED OUT AND REMOVED NOTE: ANY STRIPPED OUT SOIL CONTAINING LEACHATE FROM THE EXISTING SAS ABANDONED AND TO BE DISPOSED OF AS PER BOARD OF HEALTH SPECIFICATIONS. GENERAL NOTES 1. Contractor is responsible for Digsofe notification, Verification of Utilities and protection of all underground utilities and pipes. 2. The septic tank and distribution box shall be set level on 6"of 3/4"-1 1/2" stone. 3. Backfill should be clean sand or grovel with no stones over 3" in size. 4. This system is subject to inspection during installation by Shay Environmental Services 5. The contractor shall install this system in accordance with Title V of the Massachusetts state code, the approved plan and Local Regulations. 6. If, during installation the contractor encounters any soil conditions or site conditions that are different from those shown on the soil log or in our design installation must halt & immediate notification be made to Shay Environmental Services 7.No vehicle or heavy machinery shall drive over the septic system unless noted as H-20 septic components. 8. Install Tuf-rite gas baffles or equals on all outlet tee ends. 9. All Distribution Lines shall be 4" diameter Schedule 40 NSF PVC pipes. 10. All solid piping, tees & fittings shall be 4" diameter Schedule 40 NSF PVC pipes with water tight joints. 11. Municipal Water is CONNECTED AND AVAILABLE TO THE SITE AND ABUTTING PROPOERTIES. PLOT PLAN OF PROPOSED SEPTIC SYSTEM UPGRADE PREPARED FOR STEPHEN LENKOWSKI 184 SOUTH SEA ATAVENUE-UNIT #3 ASSESSORS ID: 17-136—C3 YARMOUTH, MA r C *-jug' PREPARED BY: OA. RHEIV E. S WA Y y E RONMENTAL SERVICES 201 PLUM HOLLOW ROAD EAST FALMOUTH, MA 02536 TEL/FAX : 508-294-7498 SCALE: 1 "=30' DRAWN BY: CES DATE: FEB. 2, 2024 'ROJECT#184 S SEA AVE FILENAME:184 S.SEA AVE.DWG SHEET 1 OF 3