HomeMy WebLinkAbout3 Carrie Lane inspection reportTown of Yarmouth, MA
Inspection Report
Inspection: Inspection
Inspector: Debra Bruinooge
Inspection Date: Dec 27, 2024
Record: Rental Registration #BHR-24-932
Location: 3 CARRIE LN, SOUTH YARMOUTH, MA
02664
Applicant: Todd Duquette
Rental Inspection
Overall Result: Pass
Overall Remarks:
STR. Met with owners for the rental inspection
who were in town. Home was found very neat,
clean and organized. Very nice rental. No findings.
Checklist:
1.
Number of Bedrooms/Measurements
Result: Pass
Remarks:
#1 12.995 X 15.150 #2 12.010 X 12.990 #3 8.975 X
11.915 #4 15.985 X 11.915 (room over the garage)
2.
Maximum Occupancy: Based on septic system
capacity, number of bedrooms and bedroom
square footage
Result: Pass
Remarks:
440 GPD/4 Bedrooms- Maximum occupancy 8
3.
Basement
Result: Pass
Remarks:
Partially finished
4.
Electrical Panel
Result: Pass
Remarks:
Good
5.
Copy of Tenant's Legal Rights have been issued to
tenant.
Result: Skip
105CMR 410.00 0Minimum Standards
of Fitness for Human Habitation
(State Sanitary Code: Chapter II)
Result: Pass
410.100 Kitchen Facilities
*
Result: Pass
410.110 Bathroom Facilities : Sinks,
Toilets, Tubs & Showers
*
Result: Pass
410.120 Approved Toilets
*
Result: Pass
410.130 Water supply
Potable Water/Sanitary Drainage
Result: Pass
410.140 Plumbing Connections
*
Result: Pass
410.150 Hot Water
110-130 °F for faucets & 110-120 °F for bathtubs a &
showers
Result: Pass
410.160 Heating Systems
*
Result: Pass
410.170 Venting
*
Result: Pass
410.180 Temperature Requirements
Owner shall proved heat in every habitable room &
every room containing a toilet, shower or bathtub
from September 15th through May 31st. 64° from
11:01 pm to 6:59 am 68° from 7 am to 11:00 pm
Result: Pass
410.200 Provision and Metering of
Electrical or Gas
*
Result: Skip
410.210 Provision of Oil
*
Result: Skip
410.220 Natural and Mechanical
Ventilation
*
Result: Pass
410.230 Owner's Laundering
Responsibilities
If owner provides bed linens, towels, pillows or
mattress
Result: Pass
410.235 Owner's Installation,
Maintenance and Repair
Responsibilities
*
Result: Pass
410.240 Occupant's Installation and
Maintenance Responsibilities
*
Result: Skip
410.250 Asbestos-containing Material
*
Result: Pass
410.260 Means of Egress
*
Result: Pass
410.270 Locks
*
Result: Pass
410.300 Electrical Supply &
Illumination
*
Result: Pass
410.310 Auxiliary Emergency Lighting
Systems & Exit Signs
For properties with 10 or more units
Result: Skip
410.320 Electrical Service
Temporary Wiring, Amperage
Result: Pass
410.330 Smoke Detector and Carbon
Monoxide Alarms
*
Result: Pass
Remarks:
Present as required. Tested and working.
Monitored fire protection system in place.
410.400 Owner/Manager Contact
Information and Notice of Occupants'
Legal Rights and Responsibilities
Contact information and postings inside and
outside of home
Result: Pass
Remarks:
Owners rent through a VRBO and have a local
person on site.
410.410 Building Identification
*
Result: Pass
410.420
Habitability Requirements
Result: Pass
410.430 Natural Light and
Obstructions
*
Result: Pass
410.470 Lead-based Paint Hazards in
Residence
*
Result: Pass
410.500 Owner Responsibility to
Maintain Building & Structural
Elements
*
Result: Pass
410.510 Occupant 's Responsibility
Regarding Building and Structural
Elements
*
Result: Skip
410.520 Protective Railings and Walls
*
Result: Pass
410.530 Weather-tight elements
*
Result: Pass
410.540 Installation of Screens
*
Result: Pass
Remarks:
Only required 4/1-10/31 (A) The owner shall
provide and install screens for exterior openable
windows so that: (1) They are in place during the
period from April 1st through October 31st in each
year; (2) They are no less than 16 mesh per
square inch; (3) They cover that part of the
window designed to be opened, except in double
hung windows where half screens shall meet this
requirement; and (4) They are tight fitting and
prevent the entrance of pests. (B) Expandable,
temporary screens shall not satisfy the
requirements of 105 CMR 410.540(A). (C) The
owner shall provide and install screen doors for all
doorways opening directly to the outside from
any dwelling unit or rooming unit where the
screen doors will be permitted to slide to the side
or open in an outward direction so that: (1) They
are in place during the period from April 1st
through October 31st in each year; (2) They are 16
mesh per square inch; (3) They are equipped with
a self-closing device except where the screen is
designed to open to the side; and (4) They are
tight fitting and prevent the entrance of pests.
410.550 Elimination of Pests
Owners & Occupants are responsible for the control
& elimination of pests
Result: Pass
Remarks:
None observed
410.560 Refuse
*
Result: Pass
Remarks:
Owner responsible-Garbage Gone
410.570 Maintenance of Areas in a
Sanitary and Safe Condition
*
Result: Pass
410.620 Conduct of Inspections
The need for an additional inspection by a
specialized inspector pursuant to 105 CMR
410.620(A) and the reason that such inspection is
necessary
Result: Skip
410.630 Conditions Deemed to
Endanger or Materially Impair Health
and Safety
One or more of the violations cited on this report
may materially impair the health or safety and/or
well-being of any person(s) occupying the premises
Result: Pass
780 CMR 111.5.1 Posting of Use &
Occupancy
STR Only
Result: Skip
780 CMR 111.5.2 Required Egress
posting
STR Only
Result: Skip
780 CMR Means of Egress
STR Only
Result: Skip
780 CMR R314 & R315
Smoke/CO/Heat
STR Only
Result: Skip
R314 & R315 Smoke/CO/Heat
Detectors
STR Only
Result: Skip
This inspection report is signed and
certified under the pains and penalties
of perjury.
Inspector's signature, date and time
Result: Pass
Remarks:
Debra Bruinooge-12/27/2024-10:00AM