HomeMy WebLinkAboutplans 11.21.2024GREAT /
ISLAND /
ROAD /
i
ne.0'• /
e soo"D
LEGEND
EHSTXG ELEV. CONTOUR—
EHSING SPOT GRADE
• 2f.1
CONCRETE BOUND
®FFpFD
I rrT•
lOP W BAN(
W V-
30 15 0 00 90
FUORRWAATTONSIONE
I IMER = w IL
DONG WALL SEWENTS
PROPOSE)/ ItFuLm
WALL SE.ENT5
GENERAL NOTES
I. ELEVATIONS REFERTO NAVDER; PRESERVE EXISTING BOULDER BENCHMARK OR TRANSFERAS REQUIRED
20. REIN HEEL, BEFORE BEING POSITIONEDANDPu51' PRIORTO PLACING CONCRETE, SHALL BE FREE FROM LOOSE MILLAND RUSTSCALEAND FRDMANY COATINGSTHAT
MAY
D6TROY OR REDUCENE BOND.
IISDANDSHALL REMAIN IN PLACE A
. OF48 HOURS; FORMSSHAUBE REMOVED FROMPTLY FROM MESITE, HOISTEDOUTOR CARRIEDOUTVIATHE EXISTING STAIRS.
12. FARTH FOR NERANKSLOPEAND FOR SAND NUE FILUNG SHALL BE ASANDY LOAM TEXTURE CONSISTENTWITH THE GFNN SIZE RECORDFOR THE BANKSOIL.
]B.SAND BAGS SHALL BE STACKEDACCORDINGTO THE OWNERS REPRESENIATIVE5 GUIDANCE
]6 TH
]'.SAND BKSSHALL BE MADE OF SHIRK BIODEGRADABLE BURLAP FABRIC W/ DEGRADABLETIES;APPROX. DIMENSION IC X 26'
UFO COMPLETION OF ESAND BAG PACIE RKRING INTO THE BANK SLOPE SCARPVOIDSAMIN. 6 INCH THICKCOMDTHICNEn OFIdTOPSOILSHALLBEAPPUEDAS COVER THE LAND ZONE EXTENDING SEAWARDTOTHE RENOVATED CONCRETE WALLSSHALL BE SAND FILLED TONETOP OFNE CONCRETE WALLS (ELEV -5.2 F)
16. THE PROPER ECOLOGIST, WILKINSON ECOLOGICAL DESIGN, SHALL HAVE RESPONSIBILITY FOR MANAGING THE COASTAL BANK VEGETION PROGRAM OUTLINED
ON THE W.E.D. PLAN REFERENCED IN THE ORDER OF CONDITIONS.
17. THE COASTAL BANK SEGMENT RECEIVING SAND BAG AND SOIL TREATMENT SHALL BE INTENSELY SEEDED WITH A BLENDED MIX OF NEW ENGLAND NATIVE
WARM SEASON GRA55 MIX AND NEW ENGLAND ROADSIDE MATRIX UPLAND SEED MIX. SEED MAY BE INCORPORATED INTO THE UPPER COURSE OF SAND BAGS;
SEED SHALL BE PROFESSIONALLY DISTRIBUTED BY HYDROSEED OR DISTRIBUTED WITH SAND OR VERMICULITE AND RAKED IN. PROVIDE A MIN. OF 2 LBS. OF EACH
MIX FORTHE TOTALAFFECTED SLOPE AREA. RE -SEED UPON FOLLOW UP GERMINATION INSPECTION. PROVIDE FOR HAND WATERING OR TEMP. IRRIGATION.
Ia. PLEASE REFER TO ANY ORDER OF CONDITIONS ISSUED FOR THE ACTIVITY BY YARMOUTH CONSERVATION COMMISSION ONCE ISSUED.
,.A• 12' 38' CAP B. = S23
,2I ,GE F1 . 13
END VIEW WALL
PROWDE CORNER 126E
REINFORCING BARS I1
ALL CORNERS 3.
12'
3 STFBIUEING SPUR
PLAN NEW 12" WALL
43 BFBARS FURACE DRILLED, GROUTED DORELG
ma
COASiN BANK COASTAL BEACH
7
upwo 6
a
NANTUCKET
SOUND
PROPOSED SANDBAG � i W � 3
FlLL W/ UflTI _ 3 � �
PIANIfo $ 3 2 tlE � 1W IR. ROOD EILV.
PER HO E9�
FNSi. pgpNDE SAND iRL ENISTNG STONE
SCARPD� W/1N WALL BA15� BRFANWAIFR
COxTOUR COASTAL EGCN MA DEOE WW UG 18)
fL•13— — _
PROFILE A —A
r -R