HomeMy WebLinkAbout25-A020 73 Bray Farm Road SouthVA
affimm
,TOWN OF YARMOUTH
} 1146 ROUTE 28, SOUTH YARMOUTH, MA 02664-4451 FEB fl 4 ppPS
Telephone (508) 398-2231 Ett. 1292--Fax (508) 398-0836
OLD KING'S HIGHWAY HISTORIC DISTRICT COMMUT S Highway
APPLICATION FOR Historic District
CERTIFICATE OF APPROPRIATENESS
Application is hereby made for issuance of a Certificate of Appropriateness under Section 6 of Chapter 470, Acts of 1973 as
amended, for proposed work as described below & on plans, drawings, photographs. & other supplemental info accompanying this
application. PLEASE SUBMIT 4 COViOS OF SPEC SHEET(S), ELEVATIONS, PHOTOS, & SUPPLEMENTAL INFORMATION.
Check All Catesfories That Apply: Indicate type of Building: Commercial ° Residential
1) Exterior Building Construction: _ New Building Addition -,&_Alterations Reroof Garage
Shed Solar Panels Other:
2) Exterior Painting: Siding ___Shutters Doors Trim Other:
3) Signs/Billboards: New Sign Change to Existing Sign
4) Miscellaneous Structures: _ Fence wall Flagpole Pool
Please type or print legibly:
Other:
Address of proposed work- 73 BRAY FARM ROAD SOUTH YARMOUTH PORT Map/Lot#
151/14
Owner(s): AW4)R -rVV x MARl()N I VAPI tv _ Phone #: (978) 886-5564
All applications must be submitted by owner or accompanied by letter from owner approving submittal of application,
Mailing address 38 EDGAR AVENUE UNIT 2 SOMERVILLE. MA 02145 Year built: 1981
Email: Andrew.Vatfey'i stmail.com Preferred notification method:
Agent/contractor: THOMAS J SMITH OR JEAN K BOWDEN Phone M
Phone Email
774-836-8536
Mailing Address:2206 MI tJCIMC>n('OY RC)AD MAgHPFF MA .o2c49
Email: SUNCON84@GMAIL_COM Preferred notification method: ! Phone -----Email
Description of Proposed Work:
Replacement of existing decking boards & railing system on front porch. Both will have new materials using
Timbertech IAzek to match existing colors Some repairs to the frame as per code with same materials
Signed (Owner or agent):
'� rf 40 ,#_
O•Z1O z.1 a-0z1-
Date: 11/29/2024
> Ownerlcontraclorlagent is aware that a permit is required from the Building Department. (Check other departments, also.)
y If application is approved, approval is subject to a I0-day appeal period required by the Act.
Y This certificate is good for one year from approval date or upon date of expiration of Building Permit, whichever date shall be later.
All new construction will be subject to inspection by OKH. OKH-approved plans MUST be available on -site for framing & final inspections.
ror uomminee use onto:
Rcvd Date:
Amount O
`�
CashICK #:.� f 5
Rcvd by. L. S'
45 Days: 301 )0'
Date S,gned.
Approved
Reason for Denial;
Signed:
Approved with. _Modifications Denied
1 APPLICATION M A O O
..�Y9JtQdk TOWN OF YARMOUTH
1146 ROUTE 28, SOUTH YARMOUTH, MASSACHUSETTS 026644451
5, ti .....a.... �` Telephone (508) 398-2231 Ext. 1292 Fax (508) 398-0836
OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE
45-DAY TIMEFRAME
WAIVER FEB 0 4 2025
5- A O 2 O # �`+ Old Kings Highway
Application #: Historic District
Project Address: 73 l3RAY FARM ROAD YARMOUTf-iPORT MA
Application Received Date:
45 Day Decision Deadline: _ 31�2 11135-
/We, the undersigned owner, contractor, or agent, do hereby waive the
45-day timeframe for a determination on our application for a Certificate
of Appropriateness/Demolition/Exemption by the Old King's Highway
Historic District Committee for the following project:
Replacement of existing decking boards & railing system on front porch. Both will have new materials using
Timbertech /Azek to match existing colors Some repairs to the frame as per code with same materials
12/2/2024 '''
Date: Signed: .. (
Owner
Andrew Varier
?, caner
a-A�
Contractor/Agent
25--A020
GENERAL SPECIFICATION SHEET
Pro"ect Address:
FOUNDATION: Material:
Exposure (Not to exceed 18"):
CHIMNEY: MateriallColor: GUTTERS: Material/Color:
ROOF: Material: Pitch (7112 min)
Height to Ridge:
Color.
SIDING: Material/Style: Front: Sides/Rear:
COLOR CHIPS
Color: Front: Sides/Rear:
TRIM: All windows &doors to be trimmed with: 1x 4 10 (Circle one.)
Material: Color:
DOORS: Qty: Material: Color:
FEB 0 4 2025
Style/Size (if not listedlshown on elevations):
STORM DOORS: Qty: Material: Color:
Old King'S Highway
Historic District
GARAGE DOORS: Qty: MatT Style:
Color:
WINDOWS: Qty/side:: Front: Left: Right. Rear:
Color:
Manufacturer/Series: Material:
Grilles (Required): Pa ern (6/6, 211, etc.) Grille Type: True Divided
Lite:
Snap -In: Between Glass: Permanently Applied:
Exterior Interior
STORM WINDOWS: Qty: Material:
Color:
SHUTTERS: MatT Style: Paneled Louvered
Color:
SKYLIGHTS: Qty: Fixed Vented Size
Color:
DECK: Size: Decking Mat'I: AZEK TIMBERTECH
Color:
RAILING, DECKING &
Railing Mat'I: AZEK TIMBERTECHStyle: TRADITIONAL
Color: WHITE
FRAME REPAIR
WALLSIFENCES* (Max W height): Height: MatT
Style: Color.
(Show running footage & location on plot plan.) *Finished side of fence must face out from fenced in area.
UTILITY METERSIHVAC UNITS: Location:
Screening:
LIGHTS: Qty: Style:
Color:
Location(s):
LIGHT POSTS: Qty: Material:
Color.
Location(s):
Additional information:
2-General 2 5a 0 2 0
APPLICATION #:
TOWN OF YARMOUTH
OLD KINGS HIGHWAY HISTORIC DISTRICT COMMITTEE
ABUTTERS' LIST
Applicant's (Owner) Name: ANDREW VARNEY OWNER THOMAS J SMITH APPLICANT
Property Address/Location: 73 BRAY FARM ROAD SOUTH YARMOUTHPORT
Hearing Date:-_)I)q)A;
Notices must be sent to the applicant and abutters (including owners of land on any
public or private street or way) whose property directly abuts or is across the street from
the applicant. The OKH Office will send out notices using the addresses as they appear
on the most recent applicable tax list.
Note: Instructions for obtaining the abutters Map and Lot numbers can be found on the Old King's
Highway Department page on the Town website: www.warmoa0.ma.us
Map Number Lot Number
Applicant Information: 151 14
Abutter Information:
FEB 442015
Old Kings Highway
Historic District
8.2014
13
1 LAU
Md3
1 SI
11'I
o�{
Application #:
2 5 - A 0 2 0
a tn ASm
14 ORLn
Ln
v 7
Ln Ln
Wn
1"1 C
g n
w M GO
Ln Ch
IM-4 .�■ Ln
rf ri Ln
$2 nl [^ a
VVII �fi w
..� Ln 7 $ r
K� 1A
V FZR
Ln
ON 0
Lns Ln ,� r
j .. Ln a i,
,-i GD Ln
Ln
R
)' I. •��
Ct
N M ��
m
Ln
LM
01d King's Highway
LngHistOFic District
$ Cu n
p
AL�4k
E ..
Cu Ln
4�1 Cu N 4:
-_
00 n \Ln
N
r!
O Ln
f` OyO ,�
-' In
L ELMtn
8 y
o Ln1
L
Ln
Ln
ILn
-1I1M t , low
�5 pO20
Ln
Ln4'K
°i �
a tn
b
A J
V
1� J
73 Bray Farm South Yarmouthport Tom Smith Project to remodel this front porch with new
railings in white in AZEK Current railings are wood painted white
FEB Q 4 2024
�)Id King's Highway
Historic District
,�5--A 020 . ij
i
Erik � - -�_� -'4� �f �. r._. 4. •• .N �
I
F]ll]
• aL'II' ' "!LuLiM
10101 i'2019
F
RR 0 4 2025
.Id Ki 9's Highway
ZIL Hist ric District
2 5 A 0 2 0
73 Bray Farm Road South Yarmouthport MA
Project of a front porch Remodeling
PTO '14 ..----��-
0 AS BAS UGR
BM FBM
2
43
24 ff WDi (x2)
101110 I 30 30 30
41
143j
FF S
S
2
4 14
FOP � 23 —.....
I6 613
.61 6 3.61/
)y
..- - -/ OMN
FEB 0 4 1075
Old King's Highway
Historic District
2 5 - A 020
(bra 11 cl�
Go Against the Grain.
Classic Composite Series
BOLD. BEAUTIFUL. REFINED.
Our most popular collection has rightly been dubbed the
"Designer Series" of railing. Boasting multiple top rail and infill
choices, this simple system g ves you end;ess design options to
make your outdoor living space truly yours, This railing series
takes your home's outdoor space to the next level with its bold
details and var-PeLy of colors
COLOR OPTIONS
W WE
POST CAP OPTIONS
4"x4" Cap 4"x4' Island Cap
36
INFILL OPTIONS
Composite Batuster
Cable Rail by Feeney
FEB 0 4 2025
Old King's Highway
Historic District
Aluminum Balusters
square and round
Ir
YxY Cap 5.5"x5.5" Pyramid Cap
Glass Channel Kit
Glass not included
55'4.5" Island Cap
2 5 - A 0 2 0
FEB 0 4 2025
Old King',; Highway
Historic District
TiniberTecH
Go Against the Grain. -
Endless Design Options
Choos-ng t-e rig,7t railing isjust as important as select'ng your de(1ing. In t-•e
spirit of keepin'rt rad with you, railing is the first thing that the neighbors see
when they peek ove: the fence at your new space' Make a statement by mixing
and matching top rail options, infills, and material types to suit your sty e.
For more information on TimberTech Railing, see page 58
or visit Timber'fiech.com/railing.
2S-A020
33
FEB 0 4 2025
Ord King's Highway
Choose the Right Rai I Historic District
TRADITIONAL
COMPOSITE RAILING
MODERN
COMPOSITE RAILING
0.1F 1rt
[251
YEAR
Nkwopr
111111111111111
ililiki
MINIMALIST eegg.)A
METAL RAILING
Discover these gorgeous railing profiles that boast a
traditional milled wood look,
• Sate and slurdy — strong, squeak -free balusters
• Low maintenance — never requires staining or painting
• Resistant to mold and moisture damage — won't warp,
rot, or splinter
• Stands the test of time — resists staining and scratching
• Environmentally friendly— made from up to SO%
recycled materials
Lean into the linear look with these sleek railing styles that offer
clean lines.
Safe and sturdy — great alternative to custom wood railings
+ Low maintenance — never requires staining or pa;rtlmg
Resistant to mold and motstire damage — won't warp,
rot, or splinter
Stands the test of time — resists staining and tcratcfsmg
Environmentally friendly — made from up to 50�4r.
recycled materials
Keep it classic with these refined railing protites for a
timeless look.
Safe and sturdy — strong, rattle -free balusters
• Low mairilenance — alum num, powder -coated finish
resists corrosion
Durable and impervious to moisture --- won't rot or deteriorate
• Stands the test of time — resists fad-ng, staining, scratching
• Easy to install — no special tools required
Un,ike some wood rai.ings. a.. TpmberTech' Rail profile designs are tested by a thi-d-party, independent ageriry to ensure safety ccFde compUance
34 standards are met or exceeded. TlmberTech Rail ngs undergo rigorous testing and are engineered 'or safety and strength.
6-A020
F1, C,11, rD
FEB 0 4 2025
Old King's Highway
Historic District
■ 4 top rail options
. 5 color options
• 4 infill options
PREMIER RADIANCERAILK TRADEMARK DRINK RAIL
RAILING' RAIL`
• 2 color options
. 4 infill options
riech
Go Against the Gra.iri:
R.
• 3 color options
« 1 infill option
RADIANCERAIL
EXPRESS"
. 2 color options
• 2 infill options
CONTEMPORARY BUILDER RAIL
RAIL
IMPRESSION RAIL' IMPRESSION RAIL EXPRESS'
• 2 color options • 3 color options
• 1 Will. options 5 infi(L options
IMPRESSION IMPRESSION RAIL
RAWN EXPRESS"
35
2 5 - A 0 2 0