Loading...
HomeMy WebLinkAbout25-A020 73 Bray Farm Road SouthVA affimm ,TOWN OF YARMOUTH } 1146 ROUTE 28, SOUTH YARMOUTH, MA 02664-4451 FEB fl 4 ppPS Telephone (508) 398-2231 Ett. 1292--Fax (508) 398-0836 OLD KING'S HIGHWAY HISTORIC DISTRICT COMMUT S Highway APPLICATION FOR Historic District CERTIFICATE OF APPROPRIATENESS Application is hereby made for issuance of a Certificate of Appropriateness under Section 6 of Chapter 470, Acts of 1973 as amended, for proposed work as described below & on plans, drawings, photographs. & other supplemental info accompanying this application. PLEASE SUBMIT 4 COViOS OF SPEC SHEET(S), ELEVATIONS, PHOTOS, & SUPPLEMENTAL INFORMATION. Check All Catesfories That Apply: Indicate type of Building: Commercial ° Residential 1) Exterior Building Construction: _ New Building Addition -,&_Alterations Reroof Garage Shed Solar Panels Other: 2) Exterior Painting: Siding ___Shutters Doors Trim Other: 3) Signs/Billboards: New Sign Change to Existing Sign 4) Miscellaneous Structures: _ Fence wall Flagpole Pool Please type or print legibly: Other: Address of proposed work- 73 BRAY FARM ROAD SOUTH YARMOUTH PORT Map/Lot# 151/14 Owner(s): AW4)R -rVV x MARl()N I VAPI tv _ Phone #: (978) 886-5564 All applications must be submitted by owner or accompanied by letter from owner approving submittal of application, Mailing address 38 EDGAR AVENUE UNIT 2 SOMERVILLE. MA 02145 Year built: 1981 Email: Andrew.Vatfey'i stmail.com Preferred notification method: Agent/contractor: THOMAS J SMITH OR JEAN K BOWDEN Phone M Phone Email 774-836-8536 Mailing Address:2206 MI tJCIMC>n('OY RC)AD MAgHPFF MA .o2c49 Email: SUNCON84@GMAIL_COM Preferred notification method: ! Phone -----Email Description of Proposed Work: Replacement of existing decking boards & railing system on front porch. Both will have new materials using Timbertech IAzek to match existing colors Some repairs to the frame as per code with same materials Signed (Owner or agent): '� rf 40 ,#_ O•Z1O z.1 a-0z1- Date: 11/29/2024 > Ownerlcontraclorlagent is aware that a permit is required from the Building Department. (Check other departments, also.) y If application is approved, approval is subject to a I0-day appeal period required by the Act. Y This certificate is good for one year from approval date or upon date of expiration of Building Permit, whichever date shall be later. All new construction will be subject to inspection by OKH. OKH-approved plans MUST be available on -site for framing & final inspections. ror uomminee use onto: Rcvd Date: Amount O `� CashICK #:.� f 5 Rcvd by. L. S' 45 Days: 301 )0' Date S,gned. Approved Reason for Denial; Signed: Approved with. _Modifications Denied 1 APPLICATION M A O O ..�Y9JtQdk TOWN OF YARMOUTH 1146 ROUTE 28, SOUTH YARMOUTH, MASSACHUSETTS 026644451 5, ti .....a.... �` Telephone (508) 398-2231 Ext. 1292 Fax (508) 398-0836 OLD KING'S HIGHWAY HISTORIC DISTRICT COMMITTEE 45-DAY TIMEFRAME WAIVER FEB 0 4 2025 5- A O 2 O # �`+ Old Kings Highway Application #: Historic District Project Address: 73 l3RAY FARM ROAD YARMOUTf-iPORT MA Application Received Date: 45 Day Decision Deadline: _ 31�2 11135- /We, the undersigned owner, contractor, or agent, do hereby waive the 45-day timeframe for a determination on our application for a Certificate of Appropriateness/Demolition/Exemption by the Old King's Highway Historic District Committee for the following project: Replacement of existing decking boards & railing system on front porch. Both will have new materials using Timbertech /Azek to match existing colors Some repairs to the frame as per code with same materials 12/2/2024 ''' Date: Signed: .. ( Owner Andrew Varier ?, caner a-A� Contractor/Agent 25--A020 GENERAL SPECIFICATION SHEET Pro"ect Address: FOUNDATION: Material: Exposure (Not to exceed 18"): CHIMNEY: MateriallColor: GUTTERS: Material/Color: ROOF: Material: Pitch (7112 min) Height to Ridge: Color. SIDING: Material/Style: Front: Sides/Rear: COLOR CHIPS Color: Front: Sides/Rear: TRIM: All windows &doors to be trimmed with: 1x 4 10 (Circle one.) Material: Color: DOORS: Qty: Material: Color: FEB 0 4 2025 Style/Size (if not listedlshown on elevations): STORM DOORS: Qty: Material: Color: Old King'S Highway Historic District GARAGE DOORS: Qty: MatT Style: Color: WINDOWS: Qty/side:: Front: Left: Right. Rear: Color: Manufacturer/Series: Material: Grilles (Required): Pa ern (6/6, 211, etc.) Grille Type: True Divided Lite: Snap -In: Between Glass: Permanently Applied: Exterior Interior STORM WINDOWS: Qty: Material: Color: SHUTTERS: MatT Style: Paneled Louvered Color: SKYLIGHTS: Qty: Fixed Vented Size Color: DECK: Size: Decking Mat'I: AZEK TIMBERTECH Color: RAILING, DECKING & Railing Mat'I: AZEK TIMBERTECHStyle: TRADITIONAL Color: WHITE FRAME REPAIR WALLSIFENCES* (Max W height): Height: MatT Style: Color. (Show running footage & location on plot plan.) *Finished side of fence must face out from fenced in area. UTILITY METERSIHVAC UNITS: Location: Screening: LIGHTS: Qty: Style: Color: Location(s): LIGHT POSTS: Qty: Material: Color. Location(s): Additional information: 2-General 2 5a 0 2 0 APPLICATION #: TOWN OF YARMOUTH OLD KINGS HIGHWAY HISTORIC DISTRICT COMMITTEE ABUTTERS' LIST Applicant's (Owner) Name: ANDREW VARNEY OWNER THOMAS J SMITH APPLICANT Property Address/Location: 73 BRAY FARM ROAD SOUTH YARMOUTHPORT Hearing Date:-_)I)q)A; Notices must be sent to the applicant and abutters (including owners of land on any public or private street or way) whose property directly abuts or is across the street from the applicant. The OKH Office will send out notices using the addresses as they appear on the most recent applicable tax list. Note: Instructions for obtaining the abutters Map and Lot numbers can be found on the Old King's Highway Department page on the Town website: www.warmoa0.ma.us Map Number Lot Number Applicant Information: 151 14 Abutter Information: FEB 442015 Old Kings Highway Historic District 8.2014 13 1 LAU Md3 1 SI 11'I o�{ Application #: 2 5 - A 0 2 0 a tn ASm 14 ORLn Ln v 7 Ln Ln Wn 1"1 C g n w M GO Ln Ch IM-4 .�■ Ln rf ri Ln $2 nl [^ a VVII �fi w ..� Ln 7 $ r K� 1A V FZR Ln ON 0 Lns Ln ,� r j .. Ln a i, ,-i GD Ln Ln R )' I. •�� Ct N M �� m Ln LM 01d King's Highway LngHistOFic District $ Cu n p AL�4k E .. Cu Ln 4�1 Cu N 4: -_ 00 n \Ln N r! O Ln f` OyO ,� -' In L ELMtn 8 y o Ln1 L Ln Ln ILn -1I1M t , low �5 pO20 Ln Ln4'K °i � a tn b A J V 1� J 73 Bray Farm South Yarmouthport Tom Smith Project to remodel this front porch with new railings in white in AZEK Current railings are wood painted white FEB Q 4 2024 �)Id King's Highway Historic District ,�5--A 020 . ij i Erik � - -�_� -'4� �f �. r._. 4. •• .N � I F]ll] • aL'II' ' "!LuLiM 10101 i'2019 F RR 0 4 2025 .Id Ki 9's Highway ZIL Hist ric District 2 5 A 0 2 0 73 Bray Farm Road South Yarmouthport MA Project of a front porch Remodeling PTO '14 ..----��- 0 AS BAS UGR BM FBM 2 43 24 ff WDi (x2) 101110 I 30 30 30 41 143j FF S S 2 4 14 FOP � 23 —..... I6 613 .61 6 3.61/ )y ..- - -/ OMN FEB 0 4 1075 Old King's Highway Historic District 2 5 - A 020 (bra 11 cl� Go Against the Grain. Classic Composite Series BOLD. BEAUTIFUL. REFINED. Our most popular collection has rightly been dubbed the "Designer Series" of railing. Boasting multiple top rail and infill choices, this simple system g ves you end;ess design options to make your outdoor living space truly yours, This railing series takes your home's outdoor space to the next level with its bold details and var-PeLy of colors COLOR OPTIONS W WE POST CAP OPTIONS 4"x4" Cap 4"x4' Island Cap 36 INFILL OPTIONS Composite Batuster Cable Rail by Feeney FEB 0 4 2025 Old King's Highway Historic District Aluminum Balusters square and round Ir YxY Cap 5.5"x5.5" Pyramid Cap Glass Channel Kit Glass not included 55'4.5" Island Cap 2 5 - A 0 2 0 FEB 0 4 2025 Old King',; Highway Historic District TiniberTecH Go Against the Grain. - Endless Design Options Choos-ng t-e rig,7t railing isjust as important as select'ng your de(1ing. In t-•e spirit of keepin'rt rad with you, railing is the first thing that the neighbors see when they peek ove: the fence at your new space' Make a statement by mixing and matching top rail options, infills, and material types to suit your sty e. For more information on TimberTech Railing, see page 58 or visit Timber'fiech.com/railing. 2S-A020 33 FEB 0 4 2025 Ord King's Highway Choose the Right Rai I Historic District TRADITIONAL COMPOSITE RAILING MODERN COMPOSITE RAILING 0.1F 1rt [251 YEAR Nkwopr 111111111111111 ililiki MINIMALIST eegg.)A METAL RAILING Discover these gorgeous railing profiles that boast a traditional milled wood look, • Sate and slurdy — strong, squeak -free balusters • Low maintenance — never requires staining or painting • Resistant to mold and moisture damage — won't warp, rot, or splinter • Stands the test of time — resists staining and scratching • Environmentally friendly— made from up to SO% recycled materials Lean into the linear look with these sleek railing styles that offer clean lines. Safe and sturdy — great alternative to custom wood railings + Low maintenance — never requires staining or pa;rtlmg Resistant to mold and motstire damage — won't warp, rot, or splinter Stands the test of time — resists staining and tcratcfsmg Environmentally friendly — made from up to 50�4r. recycled materials Keep it classic with these refined railing protites for a timeless look. Safe and sturdy — strong, rattle -free balusters • Low mairilenance — alum num, powder -coated finish resists corrosion Durable and impervious to moisture --- won't rot or deteriorate • Stands the test of time — resists fad-ng, staining, scratching • Easy to install — no special tools required Un,ike some wood rai.ings. a.. TpmberTech' Rail profile designs are tested by a thi-d-party, independent ageriry to ensure safety ccFde compUance 34 standards are met or exceeded. TlmberTech Rail ngs undergo rigorous testing and are engineered 'or safety and strength. 6-A020 F1, C,11, rD FEB 0 4 2025 Old King's Highway Historic District ■ 4 top rail options . 5 color options • 4 infill options PREMIER RADIANCERAILK TRADEMARK DRINK RAIL RAILING' RAIL` • 2 color options . 4 infill options riech Go Against the Gra.iri: R. • 3 color options « 1 infill option RADIANCERAIL EXPRESS" . 2 color options • 2 infill options CONTEMPORARY BUILDER RAIL RAIL IMPRESSION RAIL' IMPRESSION RAIL EXPRESS' • 2 color options • 3 color options • 1 Will. options 5 infi(L options IMPRESSION IMPRESSION RAIL RAWN EXPRESS" 35 2 5 - A 0 2 0