Loading...
HomeMy WebLinkAbout5153 511 Route 28 Planting Plan Revised 01.31.25II' IIIL�' 7 TREE.TYP. C1A5iING CONC. SIMPALK I EDGE Of PAVEMENT II I I I I I I Tom: OF FAVEMENT PROP05E0 PLANT BED -PROPERTY LINE, TYP. -PARKING 15LAND _,-GT -13 PIER CyWTD STONE BUM REMOVE ALL DEADWOOD (DD NOT REMOVE ANY OTNER VWVATION) 5HRUB5 5H A L BE PLANTED ;2' ABOVE 5l1RROl1NDWG GRADE - 5HRUB5 5HAIL BE PLUMB AFTER 5ErrLtMtNf CUT AND REMOVE BURLAP FROM TOP 113 OF ROOTBAL_ IF ROOTBAL 15 WRAPPED IN PLASTIC OR K401ODEGRADEABIY WATERIAL REMOVE ENTIRE WRAP 3' FINE BARE MULCH NNLE55 OTHERWI5E NOTED ON MANS) TD94DRARY MOUND WITH EXCAVATED SOIL TO 3' ABOVE RNLSHED GRADE BACKFILL WITH PLANTING 5TANDARD MIX ROOT BALL ON UNDISTURBED 5UBGRADE 2X ROOT BALL PLANTING STANDARD 501E MIX: DIX (MIN.) 113 PEAT - MANURE BLEND 113 HIGH ORGANIC LOAM 1!3 EXISTIIIG SOIL 115E 27X2' HARDWOOD STAKIE LOCATE ANCHOR 5TME I W AWAY FROM TREE TRUNK ON SIDE Of PREVAILING WIND, INSTALL TREE PLUMB - LA TO APPROVE FACFiOWENTATION Of TREe5 ON 51TE TREE SHALL BE PLANTED ;3' ABOVE 5URROUNDING GRADE - TREE 511ALL BE PLUMB AFTER 5ETTLEM{NT IF RAOTBJYL 15 WRAPPED IN PLASTIC OR NON-BIOOEGRADEABLE MATERIAL ROAM ENTIRE WRAP • U WRAPPED IN B", CUT OPEN AT LEAST I✓3 OP TOP * RbAM ALL TWINFJ ROPE, MILL WIRE CAGE BALK DOWN INTO PLAITING HOLE 113 HEIGHT OF RLOIBALL DICAVATE HOLE TO DIAMM 2X WW THAN ROOT BALL - BACKPILL HOLE WITH PLANTING MIX A5 5FE019ED 3' RNE BARK MULCH (UNU55 OTHl3',W15E NOTED ON nAN5) TEMPORARY EARTH SAUCER TO CONTAIN 3' MULCH - FULL MUCH 3-W AWAY FROM TRUNIk Of TREE (KN00MOWWREMOVE 5AUCER AFTER RRST 5CA` Q UNDISTURBED 5UBGRADE PUNTING STANDARD 50L MIX. L f3 PEAT • MANURE BLEND 113 HIGH ORGANIC LOAM 113 E115TING SOIL [NSTALL TRS PLI1M6 - L.A. TO APPROVE FACE! ORIENTATION OF TNIE5 ON WE NDR-GURDOING STRAP 5UR1 A5 CHAIN LOCK OR ARBORTAPE INSTALL TREE GATOR5 ON AL. TREE5 NOT COVERED BY IRRIGATION A5 PER MANUFACTURM 5PE0RCATION5. CONTRACTOR TO MAINTAIN OJRING PERIOD OF WARRANTY TREE 5hA L DE PLANTED 3' ABOVE 5URROUREW GRADE TRff SHALL BE FILM AFTER 5ETTM M IF ROOTBALL 15 WRAPPED IN RASTIC OR NOW910DECAWEABE MATERIAL ROAM 0MRf WRAP - 1f WRAPPED IN BURLAP, CUT OPEN AT LEAST 113 OF TOP 3' PINE BARK MULCH R1NLE58 OTHERWISE NOTED ON PIAN51 HAND EXCAVATE LADLE TD DIAMETER 2X WIDER THAN ROOr BAIL - BUTTE ROOT FURS - BACKRLL HOLE WITH PLANTING 50L MIX AS SPEORED EARTH SAUCER TO CONTAIN 3' MULCH - FLU MULCH 3-0 AWAY FROM TRUNK OF TREE Rf,NOCKDOWWRLMOVE 5AUCER AFTER RRST 5EA50111 USE 2'X2' HARDWOOD 5TAKE IFOR BELOW 3' CAL-1 UNDISTUIW 5UBGRADE NOTE: •—FOR All FALL PLANTING, WRAP TRUNK AS 5FMAfD TO 2NO LOWEST BRANCH - REMOVE THE FOUDNING OR GREATER SPRING • ALL TREES WILL BE FLOODED TWICE DURING THE PLAHRNG SOIL MIX: FIRST 24 IIOUR5 AFTER RANTING 113 PEAT - BLEND MANURE . ON TREE BELOW 3' CAL 115E WOOD STABS. 113 HIGH ORGANIC LOAM . ON TRM5 3' CAL. OR GREATER USE 3 GUYING CASLE5. 10 LOX. 50R $Becdm Tm "PROPERTYUNE, Dr I 0 10 20 m r.r SCALE: V r Ice Base fnbffnslbn provided ela*oncaly by: C mtW L%gNj*g Co., INC. m!YItD 5TONE BUFFER tXr,TLNG SIGN 13-PER PARING &AND PRDP05ED PLANT BED EDGE OF PAVEMENT nwwq k" see-ai'au 101gppp0•�Ir� lPrrn,•r Mau � nmrm� Nm 0�11 I 1R96 MieP0lirgPhn alrrl Is~ LM D1m Drm lTxisdB�DN an In = Ir Ll A